ApprovedCouncil status: Approved

Sycamore (T2) - Fell. The tree works are proposed to stop the influence of the tree(s) on the soil below building foundation level and provide long term stability. Estimated costs of repair to the building are £25,000.00 if the influence of the tree(s) remain and £1,677.00 if the proposed tree works are allowed to proceed. Granting permission will limit these costs. In the event of a refusal we, or our clients, will seek to secure compensation for the additional costs incurred through Section 202(e). Should the tree/s remain the total cost of repairs will be the Superstructural repairs + Alternative method of repairs = £26,677.00. It is the expert opinion of both the case engineer and arboriculturalist that on the balance of probabilities the supporting information demonstrates the influence of the tree(s). Note: Further monitoring results may be submitted if these become available during the course of this application.

5 Dag Lane, Leicestershire, North Kilworth, LE17 6HD

Leicestershire County CouncilReference 2022/TPO/0050/LCC

Last published check: 23 Oct 2026, 16:08. Check the council record for more recent changes.

Status and dates

Last published check: 23 Oct 2026, 16:08 (UK)

  1. DoneReceived25 Apr 2022
  2. DoneValidated26 Apr 2022
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedApproved6 Jun 2022

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (3)
  1. Received

    Published milestoneCouncil source
  2. Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source
Documents
10 published

Proposal

Sycamore (T2) - Fell. The tree works are proposed to stop the influence of the tree(s) on the soil below building foundation level and provide long term stability. Estimated costs of repair to the building are £25,000.00 if the influence of the tree(s) remain and £1,677.00 if the proposed tree works are allowed to proceed. Granting permission will limit these costs. In the event of a refusal we, or our clients, will seek to secure compensation for the additional costs incurred through Section 202(e). Should the tree/s remain the total cost of repairs will be the Superstructural repairs + Alternative method of repairs = £26,677.00. It is the expert opinion of both the case engineer and arboriculturalist that on the balance of probabilities the supporting information demonstrates the influence of the tree(s). Note: Further monitoring results may be submitted if these become available during the course of this application.

Reference
2022/TPO/0050/LCC

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • photosphotos (220 kb)Not publishedView
  • 5 Dag Lane Photo 2.jpg5 Dag Lane Photo 2.jpg (181 kb)Not publishedView
  • 5 Dag Lane Photo 3.jpg5 Dag Lane Photo 3.jpg (215 kb)Not publishedView
  • 5 Dag Lane Photo 4.jpg5 Dag Lane Photo 4.jpg (214 kb)Not publishedView
  • 5 Dag Lane Photo 5.jpg5 Dag Lane Photo 5.jpg (33 kb)Not publishedView
  • 5 Dag Lane Photo 6.jpg5 Dag Lane Photo 6.jpg (156 kb)Not publishedView
  • applicant letterapplicant letter (84 kb)Not publishedView
  • district notif letterdistrict notif letter (47 kb)Not publishedView

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.