Minor design amendments to the facility relating to: • west side retaining wall adjacent to roadway and removal of gabion baskets. • the equipment to be installed on/through the roof; • aviation warning lighting; • layout of roads within the facility along with changes to the layout of ancillary infrastructure (such as 132kv switchyard, fuel tanks and other small buildings); • inclusion of a new cladding type to the ‘lantern’ (upper part of the building); • repositioning and addition of new roller shutter doors, personnel doors and active louvres within the western, northern and eastern façades; • the Gatehouse building
Newhurst Energy Recovery Facility, Ashby Road East, Shepshed. LE12 9BU.
Minor design amendments to the facility relating to: • west side retaining wall adjacent to roadway and removal of gabion baskets. • the equipment to be installed on/through the roof; • aviation warning lighting; • layout of roads within the facility along with changes to the layout of ancillary infrastructure (such as 132kv switchyard, fuel tanks and other small buildings); • inclusion of a new cladding type to the ‘lantern’ (upper part of the building); • repositioning and addition of new roller shutter doors, personnel doors and active louvres within the western, northern and eastern façades; • the Gatehouse building
Reference
2021/NMA/0120/LCC
Agent
Ms Mary Tappenden
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.