The proposal is for inert waste operations at the Mole Groundworks site alongside their current operations there. The inert waste operations will be in South West of the site and only cover a small area. This small area consists of three concrete bays where inert waste will be screened and recycled to be reused for future operations by Mole Groundworks. An additional concrete panel wall is proposed to be built to protect neighbours from any additional noise created by the new operation. The new concrete panel wall will have weld mesh fencing with ivy on the neighbours side to act as a living screen to fit within aesthetics of the local landscape and benefit local wildlife.
The proposal is for inert waste operations at the Mole Groundworks site alongside their current operations there. The inert waste operations will be in South West of the site and only cover a small area. This small area consists of three concrete bays where inert waste will be screened and recycled to be reused for future operations by Mole Groundworks. An additional concrete panel wall is proposed to be built to protect neighbours from any additional noise created by the new operation. The new concrete panel wall will have weld mesh fencing with ivy on the neighbours side to act as a living screen to fit within aesthetics of the local landscape and benefit local wildlife.
Reference
2019/CM/0184/LCC
Agent
David Alcock
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.