Status on council recordCouncil status: Determined
Variation of condition 9 (materials and sample panel) and condition 35 (Approved plans) attached to planning permission 20182111 as amended by 20231089 (Demolition of existing light industrial units. Construction of five, six and eight storey mixed-use development comprising flats with associated amenity space, cycle storage, servicing, plant and access (use class C3); two ground floor commercial units (use class B1/D1); electricity substation; loading bay to highway): To allow agreement of different materials and amendments to ground, upper ground, 4th and 5th floor layouts, an extension at 4th/5th floor levels with associated elevation changes and amendments to proposed accommodation number and mix. (amended plans)(S106 agreement)
132-140 Highcross Street and rear of 61 Great Central Street
Variation of condition 9 (materials and sample panel) and condition 35 (Approved plans) attached to planning permission 20182111 as amended by 20231089 (Demolition of existing light industrial units. Construction of five, six and eight storey mixed-use development comprising flats with associated amenity space, cycle storage, servicing, plant and access (use class C3); two ground floor commercial units (use class B1/D1); electricity substation; loading bay to highway): To allow agreement of different materials and amendments to ground, upper ground, 4th and 5th floor layouts, an extension at 4th/5th floor levels with associated elevation changes and amendments to proposed accommodation number and mix. (amended plans)(S106 agreement)
Reference
20231090
Ward
Abbey
Agent
Mr Evans
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.