Council planning record

Variation of conditions 3 (Approved Plans), 7 (Relevant Details) and 8 (Landscape Scheme) of previous approval 23/04572/FU (allowed at appeal APP/N4720/W/24/3355821) (Installation of a battery energy storage system, including associated infrastructure, landscaping works and access) to allow for a reduction in the developable area, reduction of containers from 12 to 6 pairs, increase in maximum height of battery units to 4.3m, reduction in amount and format of transformer equipment, repositioning of infrastructure, and increased landscaping provision - NON MATERIAL AMENDMENT TO 26/02457/FU - The proposed amendment seeks to make a minor change to the wording of Condition 27, specifically in relation to the timing of the submission and approval of the Battery Safety Management Plan, Emergency Response Plan and Risk Management Plan.

Field 4381 Warren Lane Bramham Wetherby

DecidedReference: 26/9/00137/MODLeeds City Council

Last published check: 8 Oct 2026, 13:25. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Validated Date

    Published milestoneCouncil source
  2. Standard Consultation Date

    Published milestoneCouncil source
  3. Comments To Be Submitted By

    Published milestoneCouncil source
  4. Decision Issued Date

    Published milestoneCouncil source
  5. Decision Made Date

    Published milestoneCouncil source
  6. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided
Application type
Non Material Amendment
Received
Not published
Validated
3 Sept 2026
Determination deadline
27 Sept 2026
Local authority
Leeds City Council

Application overview

Variation of conditions 3 (Approved Plans), 7 (Relevant Details) and 8 (Landscape Scheme) of previous approval 23/04572/FU (allowed at appeal APP/N4720/W/24/3355821) (Installation of a battery energy storage system, including associated infrastructure, landscaping works and access) to allow for a reduction in the developable area, reduction of containers from 12 to 6 pairs, increase in maximum height of battery units to 4.3m, reduction in amount and format of transformer equipment, repositioning of infrastructure, and increased landscaping provision - NON MATERIAL AMENDMENT TO 26/02457/FU - The proposed amendment seeks to make a minor change to the wording of Condition 27, specifically in relation to the timing of the submission and approval of the Battery Safety Management Plan, Emergency Response Plan and Risk Management Plan.

Proposal details

Reference
26/9/00137/MOD
Ward
Wetherby
Parish
Bramham-cum-Oglethorpe Parish Council

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Field 4381 Warren Lane Bramham Wetherby

This record has no verified map location.

View council map

Documents 5 of 5

DocumentPublishedAction
DECISION NOTICENon-Material Amendment · PDF25 Sept 2026View
OFFICER REPORTReport · PDF25 Sept 2026View
WEST YORKSHIRE FIREConsultee · PDF10 Sept 2026View
PLANNING APPLICATION FORMApplication Form · PDF3 Sept 2026View
CHANGE TO THE WORDING OF CONDITION 27BackGround Papers · PDF3 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Non Material Amendment Approved
DECISION NOTICE

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.