Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
10-81 Kirkstall Road Leeds LS3 1LH
Last published check: 2 Oct 2026, 17:20. Check the council record for more recent changes.
10-81 Kirkstall Road Leeds LS3 1LH
This record has no verified map location.
View council mapConsent, agreement or approval required by conditions 9, 10, 11, 12, 13, 15, 28, 39, 51, 56 and 58 of previously approved planning application 23/04412/FU
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| DECISION NOTICE - SPLITDecision · PDF | 29 Jul 2026 | View |
| - HIGHWAYS TEAMConsultee · PDF | 28 Jul 2026 | View |
| PHASING PLANDrawing · PDF | 24 Jun 2026 | View |
| - HIGHWAYS TEAMConsultee · PDF | 29 May 2026 | View |
| - LANDSCAPE TEAMConsultee · PDF | 18 Mar 2026 | View |
| REV . C03 LANDSCAPE MANAGEMENT & MAINTENANCE PLAN - PART 4BackGround Papers · PDF | 10 Mar 2026 | View |
| REV . C06 PHASE 1 TYPICAL HARDSCAPE DETAILS - CONTRACTOR 2 - SHEET 6Drawing · PDF | 10 Mar 2026 | View |
| REV . C03 LANDSCAPE MANAGEMENT & MAINTENANCE PLAN - PART 1BackGround Papers · PDF | 10 Mar 2026 | View |
| REV . C03 LANDSCAPE MANAGEMENT & MAINTENANCE PLAN - PART 2BackGround Papers · PDF | 10 Mar 2026 | View |
| REV . C04 PHASE 1 BAILEY BRIDGE PLAY SPACE - CONTRACTOR 2Drawing · PDF | 10 Mar 2026 | View |
| REV . C03 LANDSCAPE MANAGEMENT & MAINTENANCE PLAN - PART 3BackGround Papers · PDF | 10 Mar 2026 | View |
| - LANDSCAPE TEAMConsultee · PDF | 18 Feb 2026 | View |
| - DESIGN TEAMConsultee · PDF | 11 Feb 2026 | View |
| REV . C07 PHASE 1 PLANTING PLAN - CONTRACTOR 2 - SHEET 3 OF 4Drawing · PDF | 2 Feb 2026 | View |
| ADD . ROBINIA TIMBER FACT SHEETBackGround Papers · PDF | 2 Feb 2026 | View |
| ADD . PHASE 1 TYPICAL HARDSCAPE DETAILS - CONTRACTOR 2 - SHEET 10Drawing · PDF | 2 Feb 2026 | View |
| REV . C04 PHASE 1 BOUNDARY TREATMENT PLAN- CONTRACTOR 2 - SHEET 1 OF 4Drawing · PDF | 2 Feb 2026 | View |
| REV . C07 PHASE 1 PLANTING PLAN - CONTRACTOR 2 - SHEET 1 OF 4Drawing · PDF | 2 Feb 2026 | View |
| ADD . PHASE 1 TYPICAL HARDSCAPE DETAILS - CONTRACTOR 2 - SHEET 4Drawing · PDF | 2 Feb 2026 | View |
| - LANDSCAPE TEAMConsultee · PDF | 18 Dec 2025 | View |
| TYPICAL HARDSCAPE DETAILS SHEET 2 OF 8Drawing · PDF | 27 Nov 2025 | View |
| TYPICAL HARDSCPE DETAILS SHEET 2 OF 3Drawing · PDF | 27 Nov 2025 | View |
| PHASE 1 STRATEGIC SITE LEVELS - CONTRACTOR 2 - SHEET 1 OF 4.Drawing · PDF | 27 Nov 2025 | View |
| PLANTING PLAN SHEET 3 OF 4Drawing · PDF | 27 Nov 2025 | View |
| PHASE 1 LANDSCAPE ARRANGEMENT SHEET 4 OF 4Drawing · PDF | 27 Nov 2025 | View |
| TYPICAL SOFT DETAILS - SHEET 1Drawing · PDF | 27 Nov 2025 | View |
| PHASE 1 STRATEGIC SITE LEVELS - CONTRACTOR 2 - SHEET 4 OF 4Drawing · PDF | 27 Nov 2025 | View |
| PHASE 1 STRATEGIC SITE LEVELS - CONTRACTOR 2 - SHEET 3 OF 4.Drawing · PDF | 27 Nov 2025 | View |
| PLANTING PLAN SHEET 1 OF 4Drawing · PDF | 27 Nov 2025 | View |
| AUTOMATIC BARRIER SPEC SHEET COMMERCIAL GATES YORKSHIREBackGround Papers · PDF | 27 Nov 2025 | View |
| TYPICAL HARD DETAILS SHEET 2 OF 10Drawing · PDF | 27 Nov 2025 | View |
| PHAES 1 LANDSCAPE ARRANGEMENT SHEET 1 OF 4Drawing · PDF | 27 Nov 2025 | View |
| PHASE 1 LANDSCAPE ARRANGEMENT SHEET 2 OF 4Drawing · PDF | 27 Nov 2025 | View |
| PHASE 1 STRATEGIC SITE LEVELS - CONTRACTOR 2 - SHEET 2 OF 4.Drawing · PDF | 27 Nov 2025 | View |
| PHASE 1 LANDSCAPE ARRANGEMENT SHEET 1 OF 4Drawing · PDF | 27 Nov 2025 | View |
| EXTERNAL LIGHTING TECHNICAL SUBMITTAL P03BackGround Papers · PDF | 27 Nov 2025 | View |
| - DESIGN TEAMConsultee · PDF | 7 Oct 2025 | View |
| - LANDSCAPE TEAMConsultee · PDF | 1 Oct 2025 | View |
| - DESIGN TEAMConsultee · PDF | 29 Sept 2025 | View |
| B4 COMBINED ROOF LEVEL SERVICES GADrawing · PDF | 16 Sept 2025 | View |
| B2B COMBINED UPPER ROOF SERVICES GADrawing · PDF | 16 Sept 2025 | View |
| B2B COMBINED LOWER ROOF SERVICES GADrawing · PDF | 16 Sept 2025 | View |
| RIVERSIDE EXTERNAL DUCTING LAYOUTDrawing · PDF | 8 Sept 2025 | View |
| CENTRAL EXTERNAL DUCTING LAYOUTDrawing · PDF | 8 Sept 2025 | View |
| EASTERN EXTERNAL DUCTING LAYOUTDrawing · PDF | 8 Sept 2025 | View |
| NORTHERN EXTERNAL DUCTING LAYOUTDrawing · PDF | 8 Sept 2025 | View |
| PHASE 1 KERBS AND EDGES PLAN - CONTRACTOR 2 - SHEET 1 OF 4Drawing · PDF | 8 Sept 2025 | View |
| PHASE 1 PLANTING PLAN - CONTRACTOR 2 - SHEET 2 OF 4Drawing · PDF | 8 Sept 2025 | View |
| PHASE 1 PLANTING PLAN - CONTRACTOR 2 - SHEET 4 OF 4Drawing · PDF | 8 Sept 2025 | View |
| CONSTRUCTION PROGRAMME - BUILDINGS 2A, 2B AND 4BackGround Papers · PDF | 8 Sept 2025 | View |
| - DESIGN TEAMConsultee · PDF | 26 Aug 2025 | View |
| PHASE 1 BAILEY BRIDGE PLAY SPACE - CONTRACTOR 2Drawing · PDF | 21 Jul 2025 | View |
| PHASE 1 STRATEGIC SITE LEVELS CONTRACTOR 2 - SHEET 1 OF 4Drawing · PDF | 21 Jul 2025 | View |
| PHASE 1 STRATEGIC SITE LEVELS CONTRACTOR 2 - SHEET 3 OF 4Drawing · PDF | 21 Jul 2025 | View |
| PHASE 1 C2 PARKING PREVISION LOCATION PLANDrawing · PDF | 21 Jul 2025 | View |
| PHASE 1 STRATEGIC SITE LEVELS CONTRACTOR 2 - SHEET 4 OF 4Drawing · PDF | 21 Jul 2025 | View |
| - HIGHWAYS TEAMConsultee · PDF | 1 Jul 2025 | View |
| FAO DESIGN (PART 1)BackGround Papers · PDF | 27 Jun 2025 | View |
| FAO DESIGN (PART 2)BackGround Papers · PDF | 27 Jun 2025 | View |
| - DESIGN TEAMConsultee · PDF | 23 Jun 2025 | View |
| - LANDSCAPE TEAMConsultee · PDF | 17 Jun 2025 | View |
| BLOCK 2A - CANOPYDrawing · PDF | 10 Jun 2025 | View |
| ROOF PLAN COMMERCIAL UNIT C2Drawing · PDF | 10 Jun 2025 | View |
| PHASE 1 EXTERNAL PAVING PLAN - CONTRACTOR 2 - SHEET 2 OF 4Drawing · PDF | 10 Jun 2025 | View |
| PHASE 1 EXTERNAL PAVING PLAN - CONTRACTOR 2 - SHEET 3 OF 4Drawing · PDF | 10 Jun 2025 | View |
| PHASE 1 EXTERNAL PAVING PLAN - CONTRACTOR 2 - SHEET 4 OF 4Drawing · PDF | 10 Jun 2025 | View |
| ROOF PLAN BUILDING 2BDrawing · PDF | 10 Jun 2025 | View |
| GA ROOF PLAN DAVIT PLAN LAYOUT + DETAILSDrawing · PDF | 10 Jun 2025 | View |
| BUILDING 2A - EAST ELEVATIONDrawing · PDF | 10 Jun 2025 | View |
| PHASE 1 EXTERNAL PAVING PLAN - CONTRACTOR 2 - SHEET 1 OF 4Drawing · PDF | 10 Jun 2025 | View |
| DYECOATS PLANNING CONDITIONS RFI TRACKERBackGround Papers · PDF | 10 Jun 2025 | View |
| - DESIGN TEAMConsultee · PDF | 2 Jun 2025 | View |
| - HIGHWAYS TEAMConsultee · PDF | 13 May 2025 | View |
| - LOCAL PLANSConsultee · PDF | 23 Apr 2025 | View |
| SUSTAINABLE PROCUREMENT POLICYBackGround Papers · PDF | 22 Apr 2025 | View |
| CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANBackGround Papers · PDF | 22 Apr 2025 | View |
| CANOPY AND WIND MITIGATION PANEL METALWORKS BUILDING 2ADrawing · PDF | 16 Apr 2025 | View |
| DETAILED APARTMENT SCHEDULEDrawing · PDF | 16 Apr 2025 | View |
| BIN STORE BUILDING 2B GENERAL ARRANGEMENTDrawing · PDF | 16 Apr 2025 | View |
| PHASE 1 C2 REFUSE STRATEGY BUILDING 2A, 2B, 4 AND C2 PHASE 1 SITE COMPLETEDrawing · PDF | 16 Apr 2025 | View |
| MOTORCYCLE PARKING BUILDING 2B PLANDrawing · PDF | 16 Apr 2025 | View |
| Q28 - TOPSOIL AND SOIL AMELIORANTSBackGround Papers · PDF | 16 Apr 2025 | View |
| CONTRACTOR 2 HANDOVER PACK - PLAN 06Drawing · PDF | 16 Apr 2025 | View |
| CONTRACTOR 2 HANDOVER PACK - PLAN 02Drawing · PDF | 16 Apr 2025 | View |
| PHASE 1 KERBS AND EDGES PLAN - CONTRACTOR 2 - SHEET 3 OF 4Drawing · PDF | 16 Apr 2025 | View |
| PHASE 1 LANDSCAPE ARRANGEMENT PLAN - CONTRACTOR 2 - SHEET 4 OF 4Drawing · PDF | 16 Apr 2025 | View |
| PHASE 1 BOUNDARY TREATMENT PLAN - CONTRACTOR 2 - SHEET 2 OF 4Drawing · PDF | 16 Apr 2025 | View |
| B2A AND B4 TYPICAL DETAILED SECTIONSDrawing · PDF | 16 Apr 2025 | View |
| LARGE WINDOW OPENING SILL DETAIDrawing · PDF | 16 Apr 2025 | View |
| TYPICAL JAMB DETAILSDrawing · PDF | 16 Apr 2025 | View |
| TYPICAL TOWER AND WING DETAILS LEVEL 1Drawing · PDF | 16 Apr 2025 | View |
| TYPICAL WINDOW DETAILS LEVEL 2 AND ABOVEDrawing · PDF | 16 Apr 2025 | View |
| BUILDING 2B WING - BOH BAY STUDYDrawing · PDF | 16 Apr 2025 | View |
| BUILDING 2B WING - BASE BAY STUDYDrawing · PDF | 16 Apr 2025 | View |
| BUILDING 2B TOWER - MID BAY STUDYDrawing · PDF | 16 Apr 2025 | View |
| EXTERNAL SAMPLE PANELS TYPICAL SAMPLES BUILDING 2A, 2B AND 4Drawing · PDF | 16 Apr 2025 | View |
| WALKWAY CANOPY AND WIND SCREENS METAL WORKS BUILDING 2A AND 2BDrawing · PDF | 16 Apr 2025 | View |
| LANDSCAPE MANAGEMENT STRATEGYBackGround Papers · PDF | 16 Apr 2025 | View |
| PHASE 1 C2 REFUSE STRATEGY BUILDING 2A, 2B, 4 AND C2 PHASE 1 TEMPORARY SITE STRADrawing · PDF | 16 Apr 2025 | View |
| BIKE STORE BUILDING 2A PLANDrawing · PDF | 16 Apr 2025 | View |
| BIKE STORE BUILDING 4 PLANDrawing · PDF | 16 Apr 2025 | View |
| CONTRACTOR 2 HANDOVER PACK - PLAN 01Drawing · PDF | 16 Apr 2025 | View |
| CONTRACTOR 2 HANDOVER PACK - TEMPORARY LANDSCAPE STRATEGYDrawing · PDF | 16 Apr 2025 | View |
| B2A AND B4 TYPICAL WINDOW DETAILS LEVEL 2 AND ABOVEDrawing · PDF | 16 Apr 2025 | View |
| GROUND FLOOR - TYPICAL DETAILSDrawing · PDF | 16 Apr 2025 | View |
| TYPICAL CURTAIN WALL DETAILS INCLUDING TYPICAL LEVEL 1 SILL DETAILSDrawing · PDF | 16 Apr 2025 | View |
| TYPICAL ROOF DETAILS SHEET 1 OF 3 COMMERCIAL C2Drawing · PDF | 16 Apr 2025 | View |
| MAIN ENTRANCE SOFFIT DETAILDrawing · PDF | 16 Apr 2025 | View |
| BUILDING 2B TOWER - MAIN ENTRANCE BAY STUDYDrawing · PDF | 16 Apr 2025 | View |
| BUILDING 2B WING - TOP BAY STUDYDrawing · PDF | 16 Apr 2025 | View |
| BUILDING 2B WING - MID BAY STUDYDrawing · PDF | 16 Apr 2025 | View |
| DETAILED APARTMENT SCHEDULE BUILDING 4Drawing · PDF | 16 Apr 2025 | View |
| DETAILED APARTMENT SCHEDULE BUILDING 2ADrawing · PDF | 16 Apr 2025 | View |
| DN0084 PHASE 1 CONTRACT 2 - REFUSE AND RECYCLING STRATEGYBackGround Papers · PDF | 16 Apr 2025 | View |
| BIN STORE BUILDING 2A GENERAL ARRANGEMENTDrawing · PDF | 16 Apr 2025 | View |
| CONTRACTOR 2 HANDOVER PACK - TEMPORARY SOFT LANDSCAPE DETAILSDrawing · PDF | 16 Apr 2025 | View |
| CONSTRACTOR 2 HANDOVER PACK - TEMPORARY HARD LANDSCAPE DETAILSDrawing · PDF | 16 Apr 2025 | View |
| CONTRACTOR 2 HANDOVER PACK - PLAN 07Drawing · PDF | 16 Apr 2025 | View |
| PHASE 1 LANDSCAPE ARRANGEMENT PLAN - CONTRACTOR 2 - SHEET 3 OF 4Drawing · PDF | 16 Apr 2025 | View |
| PHASE 1 BOUNDARY TREATMENT PLAN - CONTRACTOR 2 - SHEET 1 OF 4Drawing · PDF | 16 Apr 2025 | View |
| PHASE 1 BOUNDARY TREATMENT PLAN - CONTRACTOR 2 - SHEET 4 OF 4Drawing · PDF | 16 Apr 2025 | View |
| CURTAIN WALL TOP JAMB DETAILDrawing · PDF | 16 Apr 2025 | View |
| TYPICAL CANOPY JAMB DETAILSDrawing · PDF | 16 Apr 2025 | View |
| TYPICAL DETAILED SECTIONSDrawing · PDF | 16 Apr 2025 | View |
| SUBSTATION DETAILS BUILDING 4Drawing · PDF | 16 Apr 2025 | View |
| BUILDING 2B - SUBSTATION BAY STUDYDrawing · PDF | 16 Apr 2025 | View |
| BUILDING 2A - CHANGE CONTROL REQUEST SHEET 1Drawing · PDF | 16 Apr 2025 | View |
| COVERING LETTERBackGround Papers · PDF | 16 Apr 2025 | View |
| PLANNING APPLICATION FORMApplication Form · PDF | 16 Apr 2025 | View |
| METALWORKS SCOPE PLAN BUILDING 2A, 2B, 4, COMMERCIAL 2Drawing · PDF | 16 Apr 2025 | View |
| CANOPY AND WIND MITIGATION RAILING METALWORKS BUILDING 2BDrawing · PDF | 16 Apr 2025 | View |
| BIN STORE BUILDING 2B GENERAL ARRANGEMENTDrawing · PDF | 16 Apr 2025 | View |
| BIN STORE GENERAL ARRANGEMENT BUILDING 4Drawing · PDF | 16 Apr 2025 | View |
| BIKE STORE BUILDING 2B PLANDrawing · PDF | 16 Apr 2025 | View |
| Q31 - EXTERNAL PLANTINGBackGround Papers · PDF | 16 Apr 2025 | View |
| CONTRACTOR 2 HANDOVER PACK - PLAN 05Drawing · PDF | 16 Apr 2025 | View |
| KERB 1 KERBS AND EDGES PLAN - CONTRACTOR 2 - SHEET 4 OF 4Drawing · PDF | 16 Apr 2025 | View |
| PHASE 1 BOUNDARY TREATMENT PLAN - CONTRACTOR 2 - SHEET 3 OF 4Drawing · PDF | 16 Apr 2025 | View |
| TYPICAL ROOF DETAILS PARAPETS BUILDING 2A, 2B AND 4Drawing · PDF | 16 Apr 2025 | View |
| B2A AND B4 TYPICAL BALCONY DETAILSDrawing · PDF | 16 Apr 2025 | View |
| EXTERNAL WALL PLAN DETAILSDrawing · PDF | 16 Apr 2025 | View |
| TYPICAL GROUND FLOOR DETAILSDrawing · PDF | 16 Apr 2025 | View |
| TYPICAL BALCONY DETAILDrawing · PDF | 16 Apr 2025 | View |
| SUBSTATION DETAILSDrawing · PDF | 16 Apr 2025 | View |
| BUILDING 2B TOWER - TOP BAY STUDYDrawing · PDF | 16 Apr 2025 | View |
| BUILDING 2B TOWER - BASE BAY STUDYDrawing · PDF | 16 Apr 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.