Listed building application for the reinstatement of lime-based mortars, installation of two cast iron vents, installation of two windows to the north gable, replacement of all existing windows with new timber casement windows, replacement of guttering, downpipes and soil pipes, removal of concrete floors, installation of insulated limecrete floor incorporating underfloor heating, installation of plaster and alterations to internal partitions and ceilings, creation of new bathrooms, construction of balustrade at first floor level, creation of new openings and alterations to existing openings, installation of new kitchen, repair of floor structure, installation of internal walls, new heating system and ground source heat pump, removal and reinstatement of hardstanding
Listed building application for the reinstatement of lime-based mortars, installation of two cast iron vents, installation of two windows to the north gable, replacement of all existing windows with new timber casement windows, replacement of guttering, downpipes and soil pipes, removal of concrete floors, installation of insulated limecrete floor incorporating underfloor heating, installation of plaster and alterations to internal partitions and ceilings, creation of new bathrooms, construction of balustrade at first floor level, creation of new openings and alterations to existing openings, installation of new kitchen, repair of floor structure, installation of internal walls, new heating system and ground source heat pump, removal and reinstatement of hardstanding
Reference
26/00476/LB
Alternative references
PP-14882072
Ward
Lower Lune Valley Ward
Parish
Wray With Botton
Agent
Upland Architecture
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.