Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Ravenhead Quarry, Chequer Lane, Up Holland
Last published check: 14 Sept 2026, 20:52. Check the council record for more recent changes.
Ravenhead Quarry, Chequer Lane, Up Holland
This record has no verified map location.
Continuation of mineral extraction and restoration of Ravenhead Quarry through infilling with imported non-hazardous material
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Ravenhead Application Form redacted.pdfApplication form | 12 Jan 2024 | View |
| 3182-01-01 Statutory Plan.pdf3182-01-01 Location Plan | 12 Jan 2024 | View |
| 3182-01-02 Final Excavation.pdf3182-01-02 Final Excavation | 12 Jan 2024 | View |
| 3182-01-03a Phasing-Phases 1-4.pdf3182-01-03a Phasing Phases 1-4 | 12 Jan 2024 | View |
| 3182-01-03b Phasing-Phases 5-8.pdf3182-01-03b Phasing Phases 5-8 | 12 Jan 2024 | View |
| 3182-01-04 Proposed Landscape Restoration.pdf3182-01-04 Proposed Landscape Restoration | 12 Jan 2024 | View |
| 3182-01-05 Cross Sections.pdf3182-01-05 Cross Sections | 12 Jan 2024 | View |
| 3182-01-06 Weighbridge and Wheel Wash.pdf3182-01-06 Weighbridge and wheel Wash | 12 Jan 2024 | View |
| 3151-01-03 Restoration Masterplan.pdf3151-0103 Restoration Masterplan from Applications LCC/2014/0008 & LCC/2022/0016 | 16 Aug 2024 | View |
| Planning Statement (December 2023).pdfPlanning Statement | 12 Jan 2024 | View |
| Appendix A - Arboriculture Assessment.pdfAppendix A - Arboriculture Assessment | 12 Jan 2024 | View |
| Appendix B - Geological SSSI Management Scheme.pdfAppendix B - Geological SSSI Management Scheme | 12 Jan 2024 | View |
| Appendix C - N E Response to Proposed Mgt Scheme.pdfAppendix C - N E response to Proposed Managemebnt scheme | 12 Jan 2024 | View |
| Residents Letter (22.02.24)_Redacted.pdfBooth Ventures (Applicant) Residents Letter | 21 Mar 2024 | View |
| 11.04.2024 UU Comments_Redacted.pdf11/04/2024 United Utilities Comments | 15 Apr 2024 | View |
| 10627 Bat Report.pdf10627 Bat Survey Report | 3 Jul 2024 | View |
| 10627 Supplementary bat report - Rev A.pdf02/07/2024 Supplementary Bat Report - Rev A | 12 Jul 2024 | View |
| Ravenhead Quarry comments No 2.pdf09/07/2024 Merseyside and West Lancs Bat Group | 12 Jul 2024 | View |
| Enclosure 1 - Landscape and Visual Matters.pdfLandscape and Visual Matters | 22 Jul 2024 | View |
| Ecology & Landscape Response Letter (July 2024)_Redacted.pdfEcology & Landscape Response Letter (July 2024) | 22 Jul 2024 | View |
| Ecology Response Letter (July 2024)_Redacted.pdfEcology Response Letter (July 2024) | 22 Jul 2024 | View |
| BNG Metric - Original Red Line.pdfBNG Metric - Original Red Line | 22 Jul 2024 | View |
| BNG Metric - Proposed.pdfBNG Metric - Proposed | 22 Jul 2024 | View |
| Enclosure 2 (Part B) - BNG Plans.pdfBNG Plans | 22 Jul 2024 | View |
| Enclosure 3 - Bat Group Response Letter (July 2024)_Redacted.pdfBat Group Response Letter | 22 Jul 2024 | View |
| Enclosure 4 - Figure 3.7 Proposed Indicative Restoration (Rev B).pdfFigure 3.7 Proposed Indicative Restoration (RevB) | 22 Jul 2024 | View |
| 01 Introduction.pdfES - 01 Introduction | 12 Jan 2024 | View |
| 02 Approach to the EIA.pdfES - 02 Approach to the EIA | 12 Jan 2024 | View |
| 03 Scheme Description & Alternatives.pdfES - 03 Scheme DEscription and Alternatives | 12 Jan 2024 | View |
| 04 Ecology.pdfES - 04 Ecology | 12 Jan 2024 | View |
| 05 Landscape & Visual Impact Assessment.pdfES - 05 Landscape and Visual Impact Assessment | 12 Jan 2024 | View |
| 06 Noise.pdfES - 06 Noise | 12 Jan 2024 | View |
| 07 Air Quality.pdfES - Air Quality | 12 Jan 2024 | View |
| 08 Geology & Hydrogeology.pdfES - Geology and Hydrogeology | 12 Jan 2024 | View |
| 09 Traffic.pdfES - Traffic | 12 Jan 2024 | View |
| Non-Technical Summary (December 2023).pdfNon Technical Summary | 12 Jan 2024 | View |
| NTS Figure 1 Site Location.pdfNTS - Fig 1 Site Location Plan | 12 Jan 2024 | View |
| NTS Figure 2 Phasing Phase 1-4.pdfNTS - Fig 2 Phasing Phase 1 -4 | 12 Jan 2024 | View |
| NTS Figure 3 Phasing Phase 5-8.pdfNTS - Fig 3 Phasing Phase 5-8 | 12 Jan 2024 | View |
| NTS Figure 4 Consented Restoration.pdfNTS - Fig 4 Consented Restoration | 12 Jan 2024 | View |
| NTS Figure 5 Proposed Restoration.pdfNTS - Fig 5 Proposed Restoration | 12 Jan 2024 | View |
| Appendix 4-1 Relevant Legislation Policy and Guidance.pdfAppendix 4.1 Relevant Legislation Policy and Guidance | 17 Jan 2024 | View |
| Appendix 4-2 Detailed Survey Habitat.pdfAppendix 4.2 Detailed Survey Habitat | 17 Jan 2024 | View |
| Appendix 4-3 Botanical Species Lists.pdfAppendix 4.3 Botanical Species Lists | 17 Jan 2024 | View |
| Appendix 4-4 Great Crested Newt Report.pdfAppendix 4.4 Great Crested Newt Report | 17 Jan 2024 | View |
| Appendix 4-5 Reptile Report.pdfAppendix 4.5 Reptile Report | 17 Jan 2024 | View |
| Appendix 5-1 LVIA Methodology.pdfAppendix 5.1 LVIA Methodology | 17 Jan 2024 | View |
| Appendix 5-2 Visualisation Methodology.pdfAppendix 5.2 Visualisation Methodology | 17 Jan 2024 | View |
| Appendix 5-3 Extracts from West Lancs Natural Areas SPG.pdfAppendix 5.3 Extracts from West Lancs Natural Areas | 17 Jan 2024 | View |
| Appendix 5-4 Effects on Character.pdfAppendix 5.4 Effects on Character | 17 Jan 2024 | View |
| Appendix 5-5 Effects on Viewpoints.pdfAppendix 5.5 Effects on Viewpoints | 17 Jan 2024 | View |
| Appendix 6-1 Basic Acoustic Terminology.pdfAppendix 6.1 Basic Acoustic Terminology | 17 Jan 2024 | View |
| Appendix 6-2 Noise Survey Details.pdfAppendix 6.2 Noise Survey Details | 17 Jan 2024 | View |
| Appendix 6-3 Baseline and Site Noise Survey Results.pdfAppendix 6.3 Baseline and Site Noise Survey Results | 17 Jan 2024 | View |
| Appendix 6-4 Plant Inventory Noise Levels.pdfAppendix 6.4 Plant Inventory Noise Levels | 17 Jan 2024 | View |
| Appendix 6-5a Noise Mapping Results.pdfAppendix 6.5a Noise Mapping Results | 17 Jan 2024 | View |
| Appendix 6-5b Noise Mapping Results.pdfAppendix 6.5b Noise Mapping Results | 17 Jan 2024 | View |
| Appendix 6-5c Noise Mapping Results.pdfAppendix 6.5c Noise Mapping Results | 17 Jan 2024 | View |
| Appendix 7-1 Dust Impact Assessment Methodology.pdfAppendix 7.1 Dust Impact Assessment Methodology | 17 Jan 2024 | View |
| Appendix 7-2 Vehicle Emissions Impact Assessment Methodology.pdfAppendix 7.2 Vehicle Emissions IMpact Assessment Methodology | 17 Jan 2024 | View |
| Appendix 7-3 Rostherne Met Data.pdfAppendix 7.3 Rostherme Met data | 17 Jan 2024 | View |
| Appendix 7-4 Dust Assessment.pdfAppendix 7.4 Dust Assessment | 17 Jan 2024 | View |
| Appendix 7-5 Traffic Data.pdfAppendix 7.5 Traffic Data | 17 Jan 2024 | View |
| Appendix 7-6 Vehicle Emissions Assessment Detailed Results.pdfAppendix 7.6 Vehicle Emissions Assessment Detailed Results | 17 Jan 2024 | View |
| Appendix 8-1 Hydrogeological Risk Assessment.pdfAppendix 8.1 Hydrogeological Risk Assessment | 17 Jan 2024 | View |
| Appendix 8-2 GroundSure Report.pdfAppendix 8.2 Groundsure Report | 17 Jan 2024 | View |
| Appendix 8-4 SSSI Management Scheme.pdfAppendix 8.4 SSSI Management SCheme | 17 Jan 2024 | View |
| Appendix 8-5 Ravenhead Quarry Groundwater Wells.pdfAppendix 8.5 Ravenhead Quarry Groundwater Wells | 17 Jan 2024 | View |
| Appendix 8-6a Surface Water Management Plan.pdfAppendix 8.6a Surface Water Management Plan | 17 Jan 2024 | View |
| Appendix 8-6b Surface Water Management Plan.pdfAppendix 8.6b Surface Water Management Plan | 17 Jan 2024 | View |
| Appendix 8-6c Surface Water Management Plan.pdfAppendix 8.6c Surface Water Management Plan | 17 Jan 2024 | View |
| Appendix 8-6d Surface Water Management Plan.pdfAppendix 8.6d Surface Water Management Plan | 17 Jan 2024 | View |
| Appendix 8-7 Stability Risk Assessment.pdfAppendix 8.7 Stability Risk Assessment | 17 Jan 2024 | View |
| Appendix 8-8 Flood Risk Assessment.pdfAppendix 8.8 Flood Risk Assessment | 17 Jan 2024 | View |
| Appendix 9-1 Transport Statement.pdfAppendix 9.1 Transport Statement | 17 Jan 2024 | View |
| Figure 1.1 Site Location.pdfFigure1.1 Site Location | 17 Jan 2024 | View |
| Figure 3.1 Existing Site Layout.pdfFigure 3.1 Existing Site layout | 17 Jan 2024 | View |
| Figure 3.2 Final Extraction.pdfFigure 3.2 Final Extraction | 17 Jan 2024 | View |
| Figure 3.3 Phasing Phase 1-4.pdfFigure 3.3 Phasing Phase 1-4 | 17 Jan 2024 | View |
| Figure 3.4 Phasing Phase 5-8.pdfFigure 3.4 Phasing Phase 5-8 | 17 Jan 2024 | View |
| Figure 3.5 Cross Sections.pdfFigure 3.5 Cross Sections | 17 Jan 2024 | View |
| Figure 3.6 Consented Restoration.pdfFigure 3.6 Consented Restoration | 17 Jan 2024 | View |
| Figure 3.7 Proposed Restoration.pdfFigure 3.7 Proposed Restoration | 17 Jan 2024 | View |
| Figure 4.1 Consultation Plan (Designated Sites).pdfFigure 4.1 Consultation Plan (Designated Sites) | 17 Jan 2024 | View |
| Figure 4.2 Consultation Plan (Species Records).pdfFigure 4.2 Consultation Plan (Species Records ) | 17 Jan 2024 | View |
| Figure 4.3 Habitat Baseline.pdfFigure 4.3 Habitat Baseline | 17 Jan 2024 | View |
| Figure 4.4 Location of Waterbodies within 500m.pdfFigure 4.4 Location of Waterbodies within 500m | 17 Jan 2024 | View |
| Figure 4.5 Reptile Survey Plan.pdfFigure 4.5 Reptile Survey Plan | 17 Jan 2024 | View |
| Figure 5.1 Landscape and Visual Context.pdfFigure 5.1 Landscape and Visual Context | 17 Jan 2024 | View |
| Figure 5.2a Viewpoint 1.pdfFigure 5.2a Viewpoint 1 | 17 Jan 2024 | View |
| Figure 5.2b Viewpoint 2.pdfFigure 5.2b Viewpoint 2 | 17 Jan 2024 | View |
| Figure 5.2c Viewpoint 3.pdfFigure 5.2c Viewpoint 3 | 17 Jan 2024 | View |
| Figure 5.2d Viewpoint 4.pdfFigure 5.2d Viewpoint 4 | 17 Jan 2024 | View |
| Figure 5.2e Viewpoint 5.pdfFigure 5.2e Viewpoint 5 | 17 Jan 2024 | View |
| Figure 6.1 Baseline Sound Monitoring Positions.pdfFigure 6.1 Baseline Sound Monitoring Positions | 17 Jan 2024 | View |
| Figure 6.2 Plans of Phased Working.pdfFigure 6.2 Plans of Phased Working | 17 Jan 2024 | View |
| Figure 6.3 Location of Plant.pdfFigure 6.3 Location of Plant | 17 Jan 2024 | View |
| Figure 7.1a Dust Assessment Study Area.pdfFigure 7.1a Dust Assessment | 17 Jan 2024 | View |
| Figure 7.1b Vehicle Emissions Study Area.pdfFigure 7.1b Vehicle Emissions Study Area | 17 Jan 2024 | View |
| Figure 7.2 Local Air Quality Features.pdfFigure 7.2 Local Air Quality Features | 17 Jan 2024 | View |
| Figure 7.3 Dust Assessment Receptors.pdfFigure 7.3 Dust Assessment Receptors | 17 Jan 2024 | View |
| LCCBVL Responses Letter (May 2024)_Redacted.pdf20/05/2024 Letter from applicant - Response to consultee comments | 20 May 2024 | View |
| Ravenhead Quarry - Construction EMP (May 2024).pdf20/05/2024 Construction Environmental Management Plan | 20 May 2024 | View |
| Outline HMP (May 2024).pdf20/05/2024 Outline Habitat Management Plan | 20 May 2024 | View |
| Propsoed BNG Metric (Rev C).xlsx20/05/2024 Proposed BNG Metric ( Rev C) | 20 May 2024 | View |
| BNG Report (Rev B - May 2024).pdf20/05/2024 BNG Report (Rev B - May 2024) | 20 May 2024 | View |
| Agreed Statutory BNG Metric (May 2024).xlsx20/05/2024 Agreed Statutory BNG Metric (May 2024) | 20 May 2024 | View |
| Proposed Indicative Restoration (Rev A May 2024).pdf20/05/2024 Proposed Indicative Restoration (Rev A May 2024) | 20 May 2024 | View |
| Enclosure 5 - Stockpile Locations.pdf20/05/2024 Enclosure 5 - Plan showing stockpile locations | 20 May 2024 | View |
| ES Chapter 2 (Approach to the EIA).pdf20/05/2024 ES Chapter 2 - Approach to the EIA (May 2024) | 20 May 2024 | View |
| ES Chapter 3 (Scheme Description and Alternatives).pdf20/05/2024 ES Chapter 3 - Scheme description and alternatives (May 2024) | 20 May 2024 | View |
| ES Chapter 6 (Rev 1 - Noise).pdf20/05/2024 ES Chapter 6 - Noise (Rev 1 May 2024) | 20 May 2024 | View |
| Figure 6.3 (Rev 1 - Crusher & Scree Locations).pdf20/05/2024 Fig 6.3 Crusher and Screen locations (Rev 1 May 2024) | 20 May 2024 | View |
| Appendx 6-5a (Rev 1 - Noise Mapping Results).pdf20/05/2024 Appendix 6.5a Noise mapping results (Rev 1 May 2024) | 20 May 2024 | View |
| site notice.pdfSite Notice | 16 Jan 2024 | View |
| Item 8 LCC.2023.0043 Ravenhead Quarry.pdf24/04/2024 Committee Report | 23 Apr 2024 | View |
| Item 6 LCC.2023.0043 Ravenhead Quarry.pdf04/09/2024 Committee Report | 3 Sept 2024 | View |
| LCC.2023.0043 Ravenhead Quarry Decision Notice.pdfDecision Notice | 9 Sept 2024 | View |
| Item 6 LCC.2023.0043 Ravenhead Quarry(1).pdfCommittee report | 23 Sept 2024 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.