Council planning record

Continuation of mineral extraction and restoration of Ravenhead Quarry through infilling with imported non-hazardous material

Ravenhead Quarry, Chequer Lane, Up Holland

Application GrantedReference: LCC/2023/0043Lancashire County Council

Last published check: 14 Sept 2026, 20:52. Check the council record for more recent changes.

Application location

Ravenhead Quarry, Chequer Lane, Up Holland

This record has no verified map location.

Application summary

Status
Application Granted
Application type
Not published
Received
11 Dec 2023
Validated
20 Dec 2023
Determination deadline
Not published
Local authority
Lancashire County Council

Application overview

Continuation of mineral extraction and restoration of Ravenhead Quarry through infilling with imported non-hazardous material

Proposal details

Reference
LCC/2023/0043
Parish
UP HOLLAND
Agent
Axis

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 119 of 119

DocumentPublishedAction
Ravenhead Application Form redacted.pdfApplication form12 Jan 2024View
3182-01-01 Statutory Plan.pdf3182-01-01 Location Plan12 Jan 2024View
3182-01-02 Final Excavation.pdf3182-01-02 Final Excavation12 Jan 2024View
3182-01-03a Phasing-Phases 1-4.pdf3182-01-03a Phasing Phases 1-412 Jan 2024View
3182-01-03b Phasing-Phases 5-8.pdf3182-01-03b Phasing Phases 5-812 Jan 2024View
3182-01-04 Proposed Landscape Restoration.pdf3182-01-04 Proposed Landscape Restoration12 Jan 2024View
3182-01-05 Cross Sections.pdf3182-01-05 Cross Sections12 Jan 2024View
3182-01-06 Weighbridge and Wheel Wash.pdf3182-01-06 Weighbridge and wheel Wash12 Jan 2024View
3151-01-03 Restoration Masterplan.pdf3151-0103 Restoration Masterplan from Applications LCC/2014/0008 & LCC/2022/001616 Aug 2024View
Planning Statement (December 2023).pdfPlanning Statement12 Jan 2024View
Appendix A - Arboriculture Assessment.pdfAppendix A - Arboriculture Assessment12 Jan 2024View
Appendix B - Geological SSSI Management Scheme.pdfAppendix B - Geological SSSI Management Scheme12 Jan 2024View
Appendix C - N E Response to Proposed Mgt Scheme.pdfAppendix C - N E response to Proposed Managemebnt scheme12 Jan 2024View
Residents Letter (22.02.24)_Redacted.pdfBooth Ventures (Applicant) Residents Letter21 Mar 2024View
11.04.2024 UU Comments_Redacted.pdf11/04/2024 United Utilities Comments15 Apr 2024View
10627 Bat Report.pdf10627 Bat Survey Report3 Jul 2024View
10627 Supplementary bat report - Rev A.pdf02/07/2024 Supplementary Bat Report - Rev A12 Jul 2024View
Ravenhead Quarry comments No 2.pdf09/07/2024 Merseyside and West Lancs Bat Group12 Jul 2024View
Enclosure 1 - Landscape and Visual Matters.pdfLandscape and Visual Matters22 Jul 2024View
Ecology & Landscape Response Letter (July 2024)_Redacted.pdfEcology & Landscape Response Letter (July 2024)22 Jul 2024View
Ecology Response Letter (July 2024)_Redacted.pdfEcology Response Letter (July 2024)22 Jul 2024View
BNG Metric - Original Red Line.pdfBNG Metric - Original Red Line22 Jul 2024View
BNG Metric - Proposed.pdfBNG Metric - Proposed22 Jul 2024View
Enclosure 2 (Part B) - BNG Plans.pdfBNG Plans22 Jul 2024View
Enclosure 3 - Bat Group Response Letter (July 2024)_Redacted.pdfBat Group Response Letter22 Jul 2024View
Enclosure 4 - Figure 3.7 Proposed Indicative Restoration (Rev B).pdfFigure 3.7 Proposed Indicative Restoration (RevB)22 Jul 2024View
01 Introduction.pdfES - 01 Introduction12 Jan 2024View
02 Approach to the EIA.pdfES - 02 Approach to the EIA12 Jan 2024View
03 Scheme Description & Alternatives.pdfES - 03 Scheme DEscription and Alternatives12 Jan 2024View
04 Ecology.pdfES - 04 Ecology12 Jan 2024View
05 Landscape & Visual Impact Assessment.pdfES - 05 Landscape and Visual Impact Assessment12 Jan 2024View
06 Noise.pdfES - 06 Noise12 Jan 2024View
07 Air Quality.pdfES - Air Quality12 Jan 2024View
08 Geology & Hydrogeology.pdfES - Geology and Hydrogeology12 Jan 2024View
09 Traffic.pdfES - Traffic12 Jan 2024View
Non-Technical Summary (December 2023).pdfNon Technical Summary12 Jan 2024View
NTS Figure 1 Site Location.pdfNTS - Fig 1 Site Location Plan12 Jan 2024View
NTS Figure 2 Phasing Phase 1-4.pdfNTS - Fig 2 Phasing Phase 1 -412 Jan 2024View
NTS Figure 3 Phasing Phase 5-8.pdfNTS - Fig 3 Phasing Phase 5-812 Jan 2024View
NTS Figure 4 Consented Restoration.pdfNTS - Fig 4 Consented Restoration12 Jan 2024View
NTS Figure 5 Proposed Restoration.pdfNTS - Fig 5 Proposed Restoration12 Jan 2024View
Appendix 4-1 Relevant Legislation Policy and Guidance.pdfAppendix 4.1 Relevant Legislation Policy and Guidance17 Jan 2024View
Appendix 4-2 Detailed Survey Habitat.pdfAppendix 4.2 Detailed Survey Habitat17 Jan 2024View
Appendix 4-3 Botanical Species Lists.pdfAppendix 4.3 Botanical Species Lists17 Jan 2024View
Appendix 4-4 Great Crested Newt Report.pdfAppendix 4.4 Great Crested Newt Report17 Jan 2024View
Appendix 4-5 Reptile Report.pdfAppendix 4.5 Reptile Report17 Jan 2024View
Appendix 5-1 LVIA Methodology.pdfAppendix 5.1 LVIA Methodology17 Jan 2024View
Appendix 5-2 Visualisation Methodology.pdfAppendix 5.2 Visualisation Methodology17 Jan 2024View
Appendix 5-3 Extracts from West Lancs Natural Areas SPG.pdfAppendix 5.3 Extracts from West Lancs Natural Areas17 Jan 2024View
Appendix 5-4 Effects on Character.pdfAppendix 5.4 Effects on Character17 Jan 2024View
Appendix 5-5 Effects on Viewpoints.pdfAppendix 5.5 Effects on Viewpoints17 Jan 2024View
Appendix 6-1 Basic Acoustic Terminology.pdfAppendix 6.1 Basic Acoustic Terminology17 Jan 2024View
Appendix 6-2 Noise Survey Details.pdfAppendix 6.2 Noise Survey Details17 Jan 2024View
Appendix 6-3 Baseline and Site Noise Survey Results.pdfAppendix 6.3 Baseline and Site Noise Survey Results17 Jan 2024View
Appendix 6-4 Plant Inventory Noise Levels.pdfAppendix 6.4 Plant Inventory Noise Levels17 Jan 2024View
Appendix 6-5a Noise Mapping Results.pdfAppendix 6.5a Noise Mapping Results17 Jan 2024View
Appendix 6-5b Noise Mapping Results.pdfAppendix 6.5b Noise Mapping Results17 Jan 2024View
Appendix 6-5c Noise Mapping Results.pdfAppendix 6.5c Noise Mapping Results17 Jan 2024View
Appendix 7-1 Dust Impact Assessment Methodology.pdfAppendix 7.1 Dust Impact Assessment Methodology17 Jan 2024View
Appendix 7-2 Vehicle Emissions Impact Assessment Methodology.pdfAppendix 7.2 Vehicle Emissions IMpact Assessment Methodology17 Jan 2024View
Appendix 7-3 Rostherne Met Data.pdfAppendix 7.3 Rostherme Met data17 Jan 2024View
Appendix 7-4 Dust Assessment.pdfAppendix 7.4 Dust Assessment17 Jan 2024View
Appendix 7-5 Traffic Data.pdfAppendix 7.5 Traffic Data17 Jan 2024View
Appendix 7-6 Vehicle Emissions Assessment Detailed Results.pdfAppendix 7.6 Vehicle Emissions Assessment Detailed Results17 Jan 2024View
Appendix 8-1 Hydrogeological Risk Assessment.pdfAppendix 8.1 Hydrogeological Risk Assessment17 Jan 2024View
Appendix 8-2 GroundSure Report.pdfAppendix 8.2 Groundsure Report17 Jan 2024View
Appendix 8-4 SSSI Management Scheme.pdfAppendix 8.4 SSSI Management SCheme17 Jan 2024View
Appendix 8-5 Ravenhead Quarry Groundwater Wells.pdfAppendix 8.5 Ravenhead Quarry Groundwater Wells17 Jan 2024View
Appendix 8-6a Surface Water Management Plan.pdfAppendix 8.6a Surface Water Management Plan17 Jan 2024View
Appendix 8-6b Surface Water Management Plan.pdfAppendix 8.6b Surface Water Management Plan17 Jan 2024View
Appendix 8-6c Surface Water Management Plan.pdfAppendix 8.6c Surface Water Management Plan17 Jan 2024View
Appendix 8-6d Surface Water Management Plan.pdfAppendix 8.6d Surface Water Management Plan17 Jan 2024View
Appendix 8-7 Stability Risk Assessment.pdfAppendix 8.7 Stability Risk Assessment17 Jan 2024View
Appendix 8-8 Flood Risk Assessment.pdfAppendix 8.8 Flood Risk Assessment17 Jan 2024View
Appendix 9-1 Transport Statement.pdfAppendix 9.1 Transport Statement17 Jan 2024View
Figure 1.1 Site Location.pdfFigure1.1 Site Location17 Jan 2024View
Figure 3.1 Existing Site Layout.pdfFigure 3.1 Existing Site layout17 Jan 2024View
Figure 3.2 Final Extraction.pdfFigure 3.2 Final Extraction17 Jan 2024View
Figure 3.3 Phasing Phase 1-4.pdfFigure 3.3 Phasing Phase 1-417 Jan 2024View
Figure 3.4 Phasing Phase 5-8.pdfFigure 3.4 Phasing Phase 5-817 Jan 2024View
Figure 3.5 Cross Sections.pdfFigure 3.5 Cross Sections17 Jan 2024View
Figure 3.6 Consented Restoration.pdfFigure 3.6 Consented Restoration17 Jan 2024View
Figure 3.7 Proposed Restoration.pdfFigure 3.7 Proposed Restoration17 Jan 2024View
Figure 4.1 Consultation Plan (Designated Sites).pdfFigure 4.1 Consultation Plan (Designated Sites)17 Jan 2024View
Figure 4.2 Consultation Plan (Species Records).pdfFigure 4.2 Consultation Plan (Species Records )17 Jan 2024View
Figure 4.3 Habitat Baseline.pdfFigure 4.3 Habitat Baseline17 Jan 2024View
Figure 4.4 Location of Waterbodies within 500m.pdfFigure 4.4 Location of Waterbodies within 500m17 Jan 2024View
Figure 4.5 Reptile Survey Plan.pdfFigure 4.5 Reptile Survey Plan17 Jan 2024View
Figure 5.1 Landscape and Visual Context.pdfFigure 5.1 Landscape and Visual Context17 Jan 2024View
Figure 5.2a Viewpoint 1.pdfFigure 5.2a Viewpoint 117 Jan 2024View
Figure 5.2b Viewpoint 2.pdfFigure 5.2b Viewpoint 217 Jan 2024View
Figure 5.2c Viewpoint 3.pdfFigure 5.2c Viewpoint 317 Jan 2024View
Figure 5.2d Viewpoint 4.pdfFigure 5.2d Viewpoint 417 Jan 2024View
Figure 5.2e Viewpoint 5.pdfFigure 5.2e Viewpoint 517 Jan 2024View
Figure 6.1 Baseline Sound Monitoring Positions.pdfFigure 6.1 Baseline Sound Monitoring Positions17 Jan 2024View
Figure 6.2 Plans of Phased Working.pdfFigure 6.2 Plans of Phased Working17 Jan 2024View
Figure 6.3 Location of Plant.pdfFigure 6.3 Location of Plant17 Jan 2024View
Figure 7.1a Dust Assessment Study Area.pdfFigure 7.1a Dust Assessment17 Jan 2024View
Figure 7.1b Vehicle Emissions Study Area.pdfFigure 7.1b Vehicle Emissions Study Area17 Jan 2024View
Figure 7.2 Local Air Quality Features.pdfFigure 7.2 Local Air Quality Features17 Jan 2024View
Figure 7.3 Dust Assessment Receptors.pdfFigure 7.3 Dust Assessment Receptors17 Jan 2024View
LCCBVL Responses Letter (May 2024)_Redacted.pdf20/05/2024 Letter from applicant - Response to consultee comments20 May 2024View
Ravenhead Quarry - Construction EMP (May 2024).pdf20/05/2024 Construction Environmental Management Plan20 May 2024View
Outline HMP (May 2024).pdf20/05/2024 Outline Habitat Management Plan20 May 2024View
Propsoed BNG Metric (Rev C).xlsx20/05/2024 Proposed BNG Metric ( Rev C)20 May 2024View
BNG Report (Rev B - May 2024).pdf20/05/2024 BNG Report (Rev B - May 2024)20 May 2024View
Agreed Statutory BNG Metric (May 2024).xlsx20/05/2024 Agreed Statutory BNG Metric (May 2024)20 May 2024View
Proposed Indicative Restoration (Rev A May 2024).pdf20/05/2024 Proposed Indicative Restoration (Rev A May 2024)20 May 2024View
Enclosure 5 - Stockpile Locations.pdf20/05/2024 Enclosure 5 - Plan showing stockpile locations20 May 2024View
ES Chapter 2 (Approach to the EIA).pdf20/05/2024 ES Chapter 2 - Approach to the EIA (May 2024)20 May 2024View
ES Chapter 3 (Scheme Description and Alternatives).pdf20/05/2024 ES Chapter 3 - Scheme description and alternatives (May 2024)20 May 2024View
ES Chapter 6 (Rev 1 - Noise).pdf20/05/2024 ES Chapter 6 - Noise (Rev 1 May 2024)20 May 2024View
Figure 6.3 (Rev 1 - Crusher & Scree Locations).pdf20/05/2024 Fig 6.3 Crusher and Screen locations (Rev 1 May 2024)20 May 2024View
Appendx 6-5a (Rev 1 - Noise Mapping Results).pdf20/05/2024 Appendix 6.5a Noise mapping results (Rev 1 May 2024)20 May 2024View
site notice.pdfSite Notice16 Jan 2024View
Item 8 LCC.2023.0043 Ravenhead Quarry.pdf24/04/2024 Committee Report23 Apr 2024View
Item 6 LCC.2023.0043 Ravenhead Quarry.pdf04/09/2024 Committee Report3 Sept 2024View
LCC.2023.0043 Ravenhead Quarry Decision Notice.pdfDecision Notice9 Sept 2024View
Item 6 LCC.2023.0043 Ravenhead Quarry(1).pdfCommittee report23 Sept 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Committee Date

    Published milestoneCouncil source
  4. Decision Issued Date

    Published milestoneCouncil source

Decision & conditions

Granted
LCC.2023.0043 Ravenhead Quarry Decision Notice.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.