IMPROVEMENT OF EXISTING A582 AND B5253 IN LEYLAND TO FOUR LANE DUAL CARRIAGEWAY STANDARD WITH SEGREGATED COMBINED CYCLE TRACK BETWEEN BROAD OAK ROUNDABOUT AND THE STANIFIELD LANE / WATKIN LANE ROUNDABOUT (A582) AND FLENSBERG WAY ROUNDABOUT TO LONGMEANYGATE JUNCTION (B5253).THE DEVELOPMENT INCLUDES...

LAND ADJOINING THE A582 AND B5253 HIGHWAYS FROM A582 BROAD OAK ROUNDABOUT, PENWORTHAM TO STANIFIELD LANE/WATKIN LANE ROUNDABOUT, LOSTOCK HALL AND THE B5253 FROM FLENSBURG WAY ROUNDABOUT FARINGTON TO LONGMEANYGATE JUNCTION, LEYLAND, LANCASHIRE.

Application OngoingReference: LCC/2020/0014Lancashire County Council

Application location

LAND ADJOINING THE A582 AND B5253 HIGHWAYS FROM A582 BROAD OAK ROUNDABOUT, PENWORTHAM TO STANIFIELD LANE/WATKIN LANE ROUNDABOUT, LOSTOCK HALL AND THE B5253 FROM FLENSBURG WAY ROUNDABOUT FARINGTON TO LONGMEANYGATE JUNCTION, LEYLAND, LANCASHIRE.

This record has no verified map location.

Application summary

Status
Application Ongoing
Application type
Not published
Received
27 Feb 2020
Validated
9 Mar 2020
Determination deadline
Not published
Local authority
Lancashire County Council

Application overview

IMPROVEMENT OF EXISTING A582 AND B5253 IN LEYLAND TO FOUR LANE DUAL CARRIAGEWAY STANDARD WITH SEGREGATED COMBINED CYCLE TRACK BETWEEN BROAD OAK ROUNDABOUT AND THE STANIFIELD LANE / WATKIN LANE ROUNDABOUT (A582) AND FLENSBERG WAY ROUNDABOUT TO LONGMEANYGATE JUNCTION (B5253).THE DEVELOPMENT INCLUDES...

Proposal details

Reference
LCC/2020/0014
Parish
PENWORTHAM
Agent
LANCASHIRE COUNTY COUNCIL

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 317 of 317

DocumentPublishedAction
Application Form Redacted.pdfAPPLICATION FORM28 Feb 2020View
CLM02-DEV-040-006 Location Plan.pdfPLAN CLM02-DEV-040-006 LOCATION PLAN2 Mar 2020View
CLM14-DEV-010-061_Temporary_Areas.pdfPLAN CLM14-DEV-010-061 TEMPORARY AREAS2 Mar 2020View
CLM02-DEV-010-067 Permitted Access Routes.pdfPLAN CLM02-DEV-010-067 PERMITTED ACCESS ROUTES2 Mar 2020View
CLM02-DEV-DR-0100-2000 KEY PLAN.pdfPLAN CLM02-DEV-DR-0100-2000 KEY PLAN2 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2001.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20012 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2002.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20022 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2003.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20032 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2004.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20042 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2005.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20052 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2006.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20062 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2007.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20072 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2008.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20082 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2009.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20092 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2010.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20102 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2011.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20112 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2012.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20122 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2013.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20132 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2014.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20142 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2015.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20152 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2016.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20162 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2017.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20172 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2018.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20182 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2019.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20192 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2020.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20202 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2021.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20212 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2022.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20222 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2023.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20232 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2024.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20242 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2025.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20252 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2026.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20262 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2027.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20272 Mar 2020View
CLM02-DEV-DR-0100-2000 SITE PLAN-2028.pdfPLAN CLM02-DEV-DR-0100-2000 SITE PLAN - 20282 Mar 2020View
CLM02-DEV-DR-0100-2100 SITE PLAN GA.pdfPLAN CLM02-DEV-DR-0100-2100 SITE PLAN GENERAL ARRANGEMENTS2 Mar 2020View
CLM02-DEV-040-4151B1-01-A-Model Farm Cattle Creep.pdfPLAN CLM02-DEV-040-4151B1-01-A-MODEL FARM CATTLE CREEP2 Mar 2020View
CLM02-DEV-040-4441B1-01-C-River Lostock.pdfPLAN CLM02-DEV-040-4441B1-01-C-RIVER LOSTOCK2 Mar 2020View
CLM02-DEV-040-4442U1-01-A-Farington Link Subway.pdfPLAN CLM02-DEV-040-4442U1-01-A-FARINGTON LINK SUBWAY2 Mar 2020View
CLM02-DEV-040-33861R1-01-A-Brook Lane Retaining Wall.pdfPLAN CLM02-DEV-040-33861R1-01-A-BROOK LANE RETAINING WALL2 Mar 2020View
CLM02-DEV-040-33862R1-01-B-Willow House Retaining Wall.pdfPLAN CLM02-DEV-040-33862R1-01-B-WILLOW HOUSE RETAINING WALL2 Mar 2020View
CLM02-DEV-40-4156B1-01 - Woodfield Railway Bridge.pdfPLAN CLM02-DEV-040-4156B1-01- WOODFIELD RAILWAY BRIDGE2 Mar 2020View
CLM02-DEV-40-4443B1-01 - Farington Link Railway Bridge.pdfPLAN CLM02-DEV-040-4443B1-01-FARINGTON LINK RAILWAY BRIDGE2 Mar 2020View
W.02 - Cross Sections - CLM02-LCC-DR-0120-1000.pdfPLAN CLM02-LCC-DR-0120-1000 REV W.02 PROPOSED LAYOUT KEY PLAN2 Mar 2020View
W.02 - Cross Sections - CLM02-LCC-DR-0120-1001.pdfPLAN CLM02-LCC-DR-0120-1001 REV W.02 CROSS SECTION 012 Mar 2020View
W.02 - Cross Sections - CLM02-LCC-DR-0120-1002.pdfPLAN CLM02-LCC-DR-0120-1002 REV W.02 CROSS SECTION 022 Mar 2020View
W.02 - Cross Sections - CLM02-LCC-DR-0120-1003.pdfPLAN CLM02-LCC-DR-0120-1003 REV W.02 CROSS SECTION 032 Mar 2020View
W.02 - Cross Sections - CLM02-LCC-DR-0120-1004.pdfPLAN CLM02-LCC-DR-0120-1004 REV W.02 CROSS SECTION 042 Mar 2020View
W.02 - Cross Sections - CLM02-LCC-DR-0120-1005.pdfPLAN CLM02-LCC-DR-0120-1005 REV W.02 CROSS SECTION 052 Mar 2020View
W.02 - Cross Sections - CLM02-LCC-DR-0120-1006.pdfPLAN CLM02-LCC-DR-0120-1006 REV W.02 CROSS SECTION 062 Mar 2020View
W.02 - Cross Sections - CLM02-LCC-DR-0120-1007.pdfPLAN CLM02-LCC-DR-0120-1007 REV W.02 CROSS SECTION 072 Mar 2020View
W.02 - Cross Sections - CLM02-LCC-DR-0120-1008.pdfPLAN CLM02-LCC-DR-0120-1008 REV W.02 CROSS SECTION 082 Mar 2020View
W.02 - Cross Sections - CLM02-LCC-DR-0120-1009.pdfPLAN CLM02-LCC-DR-0120-1009 REV W.02 CROSS SECTION 092 Mar 2020View
W.02 - Cross Sections - CLM02-LCC-DR-0120-1010.pdfPLAN CLM02-LCC-DR-0120-1010 REV W.02 CROSS SECTION 102 Mar 2020View
W.02 - Long Sections - CLM02-LCC-DR-0110-1000.pdfPLAN CLM02-LCC-DR-0110-1000 REV W.02 LONG SECTIONS2 Mar 2020View
W.02 - Long Sections - CLM02-LCC-DR-0110-1001.pdfPLAN CLM02-LCC-DR-0110-1001 REV W.02 LONG SECTIONS 012 Mar 2020View
W.02 - Long Sections - CLM02-LCC-DR-0110-1002.pdfPLAN CLM02-LCC-DR-0110-1002 REV W.02 LONG SECTIONS 022 Mar 2020View
W.02 - Long Sections - CLM02-LCC-DR-0110-1003.pdfPLAN CLM02-LCC-DR-0110-1003 REV W.02 LONG SECTIONS 032 Mar 2020View
W.02 - Long Sections - CLM02-LCC-DR-0110-1004.pdfPLAN CLM02-LCC-DR-0110-1004 REV W.02 LONG SECTIONS 042 Mar 2020View
W.02 - Long Sections - CLM02-LCC-DR-0110-1005.pdfPLAN CLM02-LCC-DR-0110-1005 REV W.02 LONG SECTIONS 052 Mar 2020View
W.02 - Long Sections - CLM02-LCC-DR-0110-1006.pdfPLAN CLM02-LCC-DR-0110-1006 REV W.02 LONG SECTIONS 062 Mar 2020View
CLM02-DEV-DR-0500 - DRAINAGE STRATEGY-1000.pdfPLAN CLM02-DEV-DR-0500 DRAINAGE STRATEGY -10002 Mar 2020View
CLM02-DEV-DR-0500 - DRAINAGE STRATEGY-1001.pdfPLAN CLM02-DEV-DR-0500 DRAINAGE STRATEGY -10012 Mar 2020View
CLM02-DEV-DR-0500 - DRAINAGE STRATEGY-1002.pdfPLAN CLM02-DEV-DR-0500 DRAINAGE STRATEGY - 10022 Mar 2020View
CLM02-DEV-DR-0500 - DRAINAGE STRATEGY-1003.pdfPLAN CLM02-DEV-DR-0500 DRAINAGE STRATEGY - 10032 Mar 2020View
CLM02-DEV-DR-0500 - DRAINAGE STRATEGY-1004.pdfPLAN CLM02-DEV-DR-0500 DRAINAGE STRATEGY - 10042 Mar 2020View
CLM02-DEV-DR-0500 - DRAINAGE STRATEGY-1005.pdfPLAN CLM02-DEV-DR-0500 DRAINAGE STARTEGY - 10052 Mar 2020View
CLM02-DEV-DR-0500 - DRAINAGE STRATEGY-1006.pdfPLAN CLM02-DEV-DR-0500 DRAINAGE STARTEGY - 10062 Mar 2020View
CLM02-DEV-DR-0500 - DRAINAGE STRATEGY-1007.pdfPLAN CLM02-DEV-DR-0500 DRAINAGE STRATEGY -10072 Mar 2020View
CLM02-DEV-DR-0500 - DRAINAGE STRATEGY-1008.pdfPLAN CLM02-DEV-DR-0500 DRAINAGE STRATEGY - 10082 Mar 2020View
CLM02-DEV-DR-0500 - DRAINAGE STRATEGY-1009.pdfPLAN CLM02-DEV-DR-0500 DRAINAGE STRATEGY - 10092 Mar 2020View
CLM02-DEV-DR-0500 - DRAINAGE STRATEGY-1010.pdfPLAN CLM02-DEV-DR-0500 DRAINAGE STRATEGY -10102 Mar 2020View
CLM02-LCC-DR-1300-0000 Name Plan.pdfPLAN CLM02-LCC-DR-1300-0000 NAME PLAN LIGHTING9 Mar 2020View
CLM02-LCC-DR-1300-1000 Street lighting design Key Plan.pdfPLAN CLM02-LCC-DR-1300-1000 STREET LIGHTING DESIGN KEY PLAN9 Mar 2020View
CLM02-LCC-DR-1300-1001 Street lighting deisgn sheet 1.pdfPLAN CLM02-LCC-DR-1300-1001 SHEET 1 STREET LIGHTING DESIGN9 Mar 2020View
CLM02-LCC-DR-1300-1002 Street lighting deisgn sheet 2.pdfPLAN CLM02-LCC-DR-1300-1002 SHEET 2 STREET LIGHTING DESIGN9 Mar 2020View
CLM02-LCC-DR-1300-1003 Street lighting deisgn sheet 3.pdfPLAN CLM02-LCC-DR-1300-1003 SHEET 3 STREET LIGHTING DESIGN9 Mar 2020View
CLM02-LCC-DR-1300-1004 Street lighting deisgn sheet 4.pdfPLAN CLM02-LCC-DR-1300-1004 SHEET 4 STREET LIGHTING DESIGN9 Mar 2020View
CLM02-LCC-DR-1300-1005 Street lighting deisgn sheet 5.pdfPLAN CLM02-LCC-DR-1300-1005 SHEET 5 STREET LIGHTING DESIGN9 Mar 2020View
CLM02-LCC-DR-1300-1006 Street lighting deisgn sheet 6.pdfPLAN CLMO2-LCC-DR-1300-1006 SHEET 6 STREET LIGHTING DESIGN9 Mar 2020View
CLM02-LCC-DR-1300-1007 Street lighting deisgn sheet 7.pdfPLAN CLM02-LCC-DR-1300-1007 SHEET 7 STREET LIGHTING DESIGN9 Mar 2020View
CLM02-LCC-DR-1300-1008 Street lighting deisgn sheet 8.pdfPLAN CLM02-LCC-DR-1300-1008 SHEET 8 STREET LIGHTING DESIGN9 Mar 2020View
CLM02-LCC-DR-1300-1009 Street lighting deisgn sheet 9.pdfPLAN CLM02-LCC-DR-1300-1009 SHEET 9 STREET LIGHTING DESIGN9 Mar 2020View
CLM02-LCC-DR-1300-1010 Street lighting deisgn sheet 10.pdfPLAN CLM02-LCC-DR-1300-1010 SHEET 10 STREET LIGHTING DESIGN9 Mar 2020View
CLM02-LCC-DR-1300-1011 Street lighting deisgn sheet 11.pdfPLAN CLM02-LCC-DR-1300-1011 SHEET 11 STREET LIGHTING DESIGN9 Mar 2020View
CLM02-LCC-DR-1300-1012 Street lighting deisgn sheet 12.pdfPLAN CLM02-LCC-DR-1300-1012 SHEET 12 STREET LIGHTING DESIGN9 Mar 2020View
CLM02-LCC-DR-1300-1013 Street lighting deisgn sheet 13.pdfPLAN CLM02-LCC-DR-1300-1013 SHEET 13 STREET LIGHTING DESIGN9 Mar 2020View
CLM02-LCC-DR-1300-1014 Street lighting deisgn sheet 14.pdfPLAN CLM02-LCC-DR-1300-1014 SHEET 14 STREET LIGHTING DESIGN9 Mar 2020View
CLM02-LCC-DR-1300-1015 Street lighting deisgn sheet 15.pdfPLAN CLM02-LCC-DR-1300-1015 SHEET 15 STREET LIGHTING DESIGN9 Mar 2020View
CLM02-LCC-DR-1300-1016 Street lighting deisgn sheet 16.pdfPLAN CLM02-LCC-DR-1300-1016 SHEET 16 STREET LIGHTING DESIGN9 Mar 2020View
CLM02-LCC-DR-1300-1017 Street lighting deisgn sheet 17.pdfPLAN CLM02-LCC-DR-1300-1017 SHEET 17 STREET LIGHTING DESIGN9 Mar 2020View
CLM02-LCC-DR-1300-1018 Street lighting deisgn sheet 18.pdfPLAN CLM02-LCC-DR-1300-1018 SHEET 18 STREET LIGHTING DESIGNPL9 Mar 2020View
CLM02-LCC-DR-1300-1019 Street lighting deisgn sheet 19.pdfPLAN CLM02-LCC-DR-1300-1019 SHEET 19 STREET LIGHTING DESIGN9 Mar 2020View
CLM02-LCC-DR-1300-1020 Street lighting deisgn sheet 20.pdfPLAN CLM02-LCC-DR-1300-1020 SHEET 20 STREET LIGHTING DESIGN9 Mar 2020View
CLM02-LCC-DR-1300-1021 Street lighting deisgn sheet 21.pdfPLAN CLM02-LCC-DR-1300-1021 SHEET 21 STREET LIGHTING DESIGN9 Mar 2020View
CLM02-LCC-DR-1300-1022 Street lighting deisgn sheet 22.pdfPLAN CLM02-LCC-DR-1300-1022 SHEET 22 STREET LIGHTING DESIGN9 Mar 2020View
CLM02-LCC-DR-1300-1023 Street lighting deisgn sheet 23.pdfPLAN CLM02-LCC-DR-1300-1023 SHEET 23 STREET LIGHTING DESIGN9 Mar 2020View
CLM02-LCC-DR-1300-1024 Street lighting deisgn sheet 24.pdfPLAN CLM02-LCC-DR-1300-1024 SHEET 24 STREET LIGHTING DESIGN9 Mar 2020View
CLM02-LCC-DR-1300-1025 Street lighting deisgn sheet 25.pdfPLAN CLM02-LCC-DR-1300-1025 SHEET 25 STREET LIGHTING DESIGN9 Mar 2020View
CLM02-LCC-DR-1300-1026 Street lighting deisgn sheet 26.pdfPLAN CLM02-LCC-DR-1300-1026 SHEET 26 STREET LIGHTING DESIGN9 Mar 2020View
Planning Statement.pdfPLANNING STATEMENT28 Feb 2020View
Design and Access Statement Part 1.pdfPART 1 DESIGN AND ACCESS STATEMENT28 Feb 2020View
Design and Access Statement Part 2.pdfPART 2 DESIGN AND ACCESS STATEMENT28 Feb 2020View
Design and Access Statement Part 3.pdfPART 3 DESIGN AND ACCESS STATEMENT28 Feb 2020View
Non-Technical Statement.pdfNON TECHNICAL SUMMARY28 Feb 2020View
A582 Traffic Forecasting Report.pdfTRAFFIC FORECASTING REPORT14 Oct 2020View
CLHTM_LMVR_Final (July 2017).pdfCENTRAL LANCASHIRE HIGHWAYS&TRAFFIC MODEL-LMVR-FINAL (JULY 2017)14 Oct 2020View
J2 A6&A582 (Option 2 No Wigan Rd)_v3 - Basic Results Summary.docxJ2 A6 & A582 (OPTION 2 NO WIGAN ROAD) - BASIC RESULTS SUMMARY14 Oct 2020View
J5 A6 & M6 Option 2 No Wigan Road RA_v3 - Basic Results Summary.docxJ5 A6 & M6 OPTION 2 NO WIGAN ROAD - BASIC RESULTS SUMMARY14 Oct 2020View
J8 M65&M6_v2 flows_No Wigan Road_v3 - Basic Results Summary.docxJ8 M65 & M6 V2 FLOWS NO WIGAN ROADV3 - BASIC RESULTS SUMMARY14 Oct 2020View
J10_M65_Opt2_v3 - Basic Results Summary.docxJ10-M65-OPT 2-V3 - BASIC RESULTS SUMMARY14 Oct 2020View
B2237807_A582 Corridor Scheme_wk10.pdfRIVER LOSTOCK HYDRAULIC MODDELLING REPORT17 Nov 2020View
B2237807_A582 Corridor Scheme_MillBrook_v01.pdfMILLBROOK HYDRAULIC MODELLING REPORT17 Nov 2020View
A582 Cuerden Task_Strategic Modelling_Technical Note_V2.0a(1).pdf08/02/2021 STRATEGIC MODELLING TECHNICAL NOTE9 Feb 2021View
A582 Junction Assessment - Appendix B v1.0.pdf08/02/2021 JUNCTION ASSESSMENT - APPENDIX BV1.O9 Feb 2021View
A582 Linsig models_True DM scenario Basic result summary(1).pdf08/02/2021 LINSIG MODELS TRUE DM SCENARIO9 Feb 2021View
Future with Scheme Junction COBA Accident Rates V2 NEW TRUE DO MIN FLOWS(1).pdf08/02/2021 FUTURE WITH SCHEME JUNCTION COBA ACCIDENT RATES9 Feb 2021View
Junction Modelling Reports08/02/2021 JUNCTION MODELLING REPORTS9 Feb 2021View
A582 Cuerden Task_Strategic Modelling_Technical Note_.pdf04/06/2021 STRATEGIC MODELLING TECHNICAL NOTE DATED MAY 20214 Jun 2021View
A582 Junction Assessment - Appendix B v2.0.xlsx04/06/2021 A582 JUNCTION ASSESSMENT - APPENDIX B V2.04 Jun 2021View
J2 A6&A582 DS_v6.lsg3x04/06/2021 MODEL OUTPUT REPORTS A6-A582 RBT -14 Jun 2021View
J2 A6&A582 DS_v6.pdf04/06/2021 MODEL OUTPUT REPORTS A6-A582 RBT-24 Jun 2021View
J5 A6 & M6 DS_v6.lsg3x04/06/2021 MODEL OUTPUT REPORTS M6 J29 NORTH RBT -14 Jun 2021View
J5 A6 & M6 DS_v6.pdf04/06/2021 MODEL OUTPUT REPORTS M6 J29 NORTH RBT -24 Jun 2021View
J8 M65&M6 DS_v6.lsg3x04/06/2021 MODEL OUTPUT REPORTS M6 J29 SOUTH RBT -14 Jun 2021View
J8 M65&M6 DS_v6.pdf04/06/2021 MODEL OUTPUT REPORTS M6 J29 SOUTH RBT - 24 Jun 2021View
J10_M65_DS_v5.lsg3x04/06/2021 MODEL OUTPUT REPORTS M65 TERMINUS -14 Jun 2021View
J10_M65_DS_v5.pdf04/06/2021 MODEL OUTPUT REPORTS M65 TERMINUS -24 Jun 2021View
Future with Scheme Junction COBA Accident Rates V3 NEW DMA & DMC flows.xlsx04/06/2021 ACCIDENT ANALYSIS4 Jun 2021View
Chapter 1 Introduction.pdfES CHAPTER 1 INTRODUCTION28 Feb 2020View
Chapter 2 Background.pdfES CHAPTER 2 BACKGROUND28 Feb 2020View
Chapter 3 Description of the scheme.pdfES CHAPTER 3 DESCRIPTION OF SCHEME28 Feb 2020View
Chapter 4 Assessment Methodology.pdfES CHAPTER 4 ASSESSMENT METHODOLOGY28 Feb 2020View
Chapter 5 Landscape and Viaul Impact.pdf12/09/2020 SUPERSEDED ES CHAPTER 5 LANDSCAPE AND VISUAL IMPACT28 Feb 2020View
Chapter 6 Ecology.pdfES CHAPTER 6 ECOLOGY28 Feb 2020View
Chapter 7 Cultural Heitage.pdfES CHAPTER 7 CULTURAL HERITAGE28 Feb 2020View
Chapter 8 Air Quality.pdfES CHAPTER 8 AIR QUALITY28 Feb 2020View
Chapter 9 Noise and Vibration.pdfES CHAPTER 9 NOISE AND VIBRATION28 Feb 2020View
Chapter 10 Soils Geology Hydrogeology.pdfES CHAPTER 10 SOIL GEOLOGY AND HYDRGEOLOGY28 Feb 2020View
Chapter 11 Water Environment.pdfES CHAPTER 11 WATER ENVIRONMENT28 Feb 2020View
Chapter 12 Traffic and Transport.pdf12/09/2020 SUPERSEDED ES CHAPTER 12 TRAFFIC AND TRANSPORT28 Feb 2020View
Chapter 13 Effects on all Trvellers.pdfES CHAPTER 13 EFFECTS ON ALL TRAVELLERS28 Feb 2020View
Chapter 14 Private and Community Assets.pdfES CHAPTER 14 PRIVATE AND COMMUNITY ASSETS28 Feb 2020View
Chapter 15 Cumulative lmpact.pdfES CHAPTER 15 CUMULATIVE IMPACT28 Feb 2020View
Chapter 16 Summary.pdfES CHAPTER 16 SUMMARY28 Feb 2020View
Chapter 17 Environmental Action Plan.pdfES CHAPTER 17 ENVIRONMENTAL ACTION PLAN28 Feb 2020View
Chapter 18 Glossary.pdfES CHAPTER 18 GLOSSARY28 Feb 2020View
App 1-3.1 Preferred Route Report.pdfAPPENDIX 1-3.1 PREFERRED ROUTE REPORT28 Feb 2020View
App 1-3.2 Planning Policy Reference.pdfAPPENDIX 1-3.2 PLANNING POLICY REFERENCE28 Feb 2020View
App 1-3.3 CLM02-DEV-010-065 Sections.pdfAPPENDIX 1-3.3 CLM02-DEV-010-065 SECTIONS28 Feb 2020View
APP1-3~4.PDFAPPENDIX 1-3.4 CLM02-DEV-010-065 JUNCTIONS28 Feb 2020View
App 4.1 Scoping Opinion Letter.pdfAPPENDIX 4.1 SCOPING OPINION LETTER28 Feb 2020View
App 4.1 Scoping Report_Part1.pdfAPPENDIX 4.1 PART 1 SCOPING REPORT28 Feb 2020View
App 4.1 Scoping Report_Part2.pdfAPPENDIX 4.1 PART 2 SCOPING REPORT28 Feb 2020View
App 4.1 Scoping Report_Part3.pdfAPPENDIX 4.1 PART 3 SCOPING REPORT28 Feb 2020View
App 4.1 Scoping Report_Part4.pdfAPPENDIX 4.1 PART 4 SCOPING REPORT28 Feb 2020View
App 4.1 Scoping Report_Part5.pdfAPPENDIX 4.1 PART 5 SCOPING REPORT28 Feb 2020View
App 4.1 Scoping Report_Part6.pdfAPPENDIX 4.1 PART 6 SCOPING REPORT28 Feb 2020View
App 4.1 Scoping Report_Part7.pdfAPPENDIX 4.1 PART 7 SCOPING REPORT28 Feb 2020View
App 4.2 Consultation Report.pdfAPPENDIX 4.2 CONSULTATION REPORT28 Feb 2020View
App4.3 Consultation Statement.pdfAPPENDIX 4.3 CONSULTATION STATEMENT28 Feb 2020View
APP51F~1.PDFAPPENDIX 5.1 FIGURE 5.1 ZONE OF THEORETICAL VISABILITY2 Mar 2020View
APP51F~2.PDFAPPENDIX 5.1 FIGURE 5.2 LANDSCAPE AND VISUAL CONSTRAINTS2 Mar 2020View
APP51F~3.PDFAPPENDIX 5.1 FIGURE 5.3 LANDSCAPE CHARACTER PLAN2 Mar 2020View
APP51F~4.PDFAPPENDIX 5.1 FIGURE 5.4 LOCAL LANDSCAPE CHARACTER PLAN2 Mar 2020View
D2ABEA58.PDFAPPENDIX 5.1 FIGURE 5.5 REPRESENTIVE PHOTOGRAPHS2 Mar 2020View
274FDCCC.PDFAPPENDIX 5.1 FIGURE 5.6 VISUAL RECEPTORS AND EFFECTS2 Mar 2020View
5EDBF3EC.PDFAPPENDIX 5.1 FIGURE 5.7 PHOTOMONTAGE LOCATION PLAN2 Mar 2020View
APPEND~1.PDFAPPENDIX 5.2 LANDSCAPE AND VISUAL IMPACT METHODOLOGY3 Mar 2020View
APPEND~2.PDFAPPENDIX 5.3 LANDSCAPE RECEPTOR SCHEDULE2 Mar 2020View
APPEND~3(6).PDFAPPENDIX 5.3 VISUAL RECEPTOR SCHEDULE2 Mar 2020View
APPEND~4.PDFAPPENDIX 5.4 PHOTOMONTAGE METHODOLOGY2 Mar 2020View
1D52D7D8.PDFAPPENDIX 5.4 PART 1 PHOTOMONTAGE2 Mar 2020View
1810EC00.PDFAPPENDIX 5.4 PART 2 PHOTOMONTAGE2 Mar 2020View
04FE2BFC.PDFAPPENDIX 5.4 PART 3 PHOTOMONTAGE2 Mar 2020View
434BE920.PDFAPPENDIX 5.5 ARBORICULTURAL IMPACT ASSESSMENT2 Mar 2020View
APP61E~1.PDFAPPENDIX 6.1 PART 1 ECOLOGICAL CONSTRAINTS2 Mar 2020View
APP61E~2.PDFAPPENDIX 6.1 PART 2 ECOLOGICAL CONSTRAINTS2 Mar 2020View
App 6.2 Phase 1 Appendix B.pdfAPPENDIX 6.2 PHASE 1 APPENDIX B2 Mar 2020View
APP62P~2.PDFAPPENDIX 6.2 PHASE 1 APPENDIX C1 PART 12 Mar 2020View
APP62P~3.PDFAPPENDIX 6.2 PHASE 1 APPENDIX C1 PART 22 Mar 2020View
8B561FB4.PDFAPPENDIX 6.2 PART 1 PHASE 1 HABITAT REPORT2 Mar 2020View
F10FC868.PDFAPPENDIX 6.2 PART 2 PHASE 1 HABITAT REPORT2 Mar 2020View
Appendix 6.3 Hedgerow Report.pdfAPPENDIX 6.3 HEDGEROW REPORT2 Mar 2020View
Appendix 6.4 Aquatic Report.pdfAPPENDIX 6.4 AQUATIC REPORT2 Mar 2020View
Appendix 6.5 GCN Report.pdfAPPENDIX 6.5 GREAT CRESTED NEWT REPORT2 Mar 2020View
A41824D4.PDFAPPENDIX 6.6 REPTILE SURVEY REPORT2 Mar 2020View
999BC50C.PDFAPPENDIX 6.7 BREEDING BIRDS REPORT2 Mar 2020View
E2D7E4C0.PDFAPPENDIX 6.7 PART 1 BREEDING BIRDS APPENDIX B2 Mar 2020View
BBC28640.PDFAPPENDIX 6.7 PART 2 BREEDING BIRDS APPENDIX B2 Mar 2020View
43AC99C8.PDFAPPENDIX 6.7 PART 3 BREEDING BIRDS APPENDIX B2 Mar 2020View
DB2125E4.PDFAPPENDIX 6.8 WINTERING BIRDS REPORT2 Mar 2020View
7C8C1370.PDFAPPENDIX 6.8 PART 1 WINTERING BIRDS APPENDIX B2 Mar 2020View
5EFCEDC4.PDFAPPENDIX 6.8 PART 2 WINTERING BIRDS APPENDIX B2 Mar 2020View
46BA8418.PDFAPPENDIX 6.8 PART 3 WINTERING BIRDS APPENDIX B2 Mar 2020View
F7363694.PDFAPPENDIX 6.14 NATIONAL VEGETATION CLASSIFICATION SURVEY REPORT2 Mar 2020View
24ED9F10.PDFAPPENDIX 6.15 IMPACTS SCREENING TABLE2 Mar 2020View
3A558BB8.PDFAPPENDIX 6.16 ECOLOGY OPTIONS REPORT2 Mar 2020View
APPEND~2.PDFAPPENDIX 9.2 APPENDIX H DAY2 Mar 2020View
APPEND~4(2).PDFAPPENDIX 9.2 NOISE TECHNICAL2 Mar 2020View
APPEDI~1.PDFAPPENDIX 10.1 PART 1 CAUSEWAY GI REPORT2 Mar 2020View
APPEDI~2.PDFAPPENDIX 10.1 PART 2 CAUSEWAY GI REPORT2 Mar 2020View
APPEDI~3.PDFAPPENDIX 10.1 PART 3 CAUSEWAY GI REPORT2 Mar 2020View
33BDD150.PDFAPPENDIX 10.2 PART 1 INDEX DATASHEET2 Mar 2020View
57A9B544.PDFAPPENDIX 10.2 PART 2 A HISTORIC MAPPING SLICE2 Mar 2020View
3D19AC84.PDFAPPENDIX 10.2 PART 3 A SITE SENSITIVITY MAPPING SLICE2 Mar 2020View
8D523828.PDFAPPENDIX 10.2 PART 4 B CONTEXT DATASHEET2 Mar 2020View
CB593A18.PDFAPPENDIX 10.2 PART 5 B HISTORIC MAPPING SLICE2 Mar 2020View
7BC10A04.PDFAPPENDIX 10.2 PART 6 B SITE SENSITVITY MAP SLICE2 Mar 2020View
28956730.PDFAPPENDIX 10.2 PART 7 B7 11 12 15 HISTORICAL SEGMENT2 Mar 2020View
6046DC20.PDFAPPENDIX 10.2 PART 8 C CONTEXT DATASHEET2 Mar 2020View
AFECC914.PDFAPPENDIX 10.2 PART 9A C HISTORICAL MAPPING SLICE2 Mar 2020View
EF618104.PDFAPPENDIX 10.2 PART 9B C HISTORICAL MAPPING SLICE2 Mar 2020View
APP102~1.PDFAPPENDIX 10.2 PART 10 C SITE SENSITIVITY MAPPING SLICE2 Mar 2020View
APP102~2.PDFAPPENDIX 10.2 PART 11 C9 C10 C13 C14 HISTORICAL SEGMENTS2 Mar 2020View
APP102~3.PDFAPPENDIX 10.2 PART 12 D CONTEXT DATASHEET2 Mar 2020View
APP102~4.PDFAPPENDIX 10.2 PART 13 D HISTORICAL MAPPING SLICE2 Mar 2020View
A1099DA4.PDFAPPENDIX 10.2 PART 14 D SITE SENSITIVITY MAPPING SLICE2 Mar 2020View
1F008B54.PDFAPPENDIX 10.2 PART 15 E CONTEXT DATA SHEET2 Mar 2020View
6E777CE0.PDFAPPENDIX 10.2 PART 16A E HISTORICAL MAPPING SLICE2 Mar 2020View
F3F40EE4.PDFAPPENDIX 10.2 PART 16B E HISTORICAL MAPPING SLICE2 Mar 2020View
8997FE1C.PDFAPPENDIX 10.2 PART 17 SITE SENSITIVITY SLICE2 Mar 2020View
5C5F3F0C.PDFAPPENDIX 10.2 PART 18 E2 E3 E6 E7 HISTORICAL SEGMENTS2 Mar 2020View
BC9549CC.PDFAPPENDIX 10.2 PART 19 F CONTEXT DATASHEET2 Mar 2020View
7D98A3CC.PDFAPPENDIX 10.2 PART 20A F HISTORICAL MAPPING SLICE2 Mar 2020View
12019560.PDFAPPENDIX 10.2 PART 20B F HISTROICAL MAPPING SLICE2 Mar 2020View
6F6BC9D4.PDFAPPENDIX 10.2 PART 21 F SITE SENSITIVITY SLICE2 Mar 2020View
Appendix 10.3 CLEA .pdfAPPENDIX 10.3 CLEA2 Mar 2020View
APPEND~3(3).PDFAPPENDIX 10.5 SITE SOILS REPORT2 Mar 2020View
APPENI~1.PDFAPPENDIX 11.3 WATER FRAMEWORK DIRECTIVE COMPLIANCE ASSESSMENT2 Mar 2020View
APPEND~2.PDFAPPENDIX 12 PART 2 TRAFFIC AND TRANSPORT2 Mar 2020View
APP131~1.PDFAPPENDIX 13.1 DRIVER STRESS CALCULTATIONS2 Mar 2020View
APP132~1.PDFAPPENDIX 13.2 CLM02-DEV-040-001 EXISTING NMU NETWORK2 Mar 2020View
APP133~1.PDFAPPENDIX 13.3 CLM02-DEV-040-004 NMU SURVEY RESULTS2 Mar 2020View
APP134~1.PDFAPPENDIX 13.4 CLM02-DEV-040-002 PT FACILITIES (REV B)2 Mar 2020View
APP135~1.PDFAPPENDIX 13.5 CLM02-DEV-040-005 CONSTRUCTION MITIGATION2 Mar 2020View
APP136~1.PDFAPPENDIX 13.6 CLM02-DEV-040-003 NMU OPERATION MITIGATION2 Mar 2020View
Appendix 15.1(1).pdfAPPENDIX 15.1 CUMULATIVE IMPACT2 Mar 2020View
APPEND~3(5).PDFAPPENDIX 16.1 ENVIRONMENTAL MASTER PLAN SHEETS 7-92 Mar 2020View
APPEND~4(3).PDF12/09/2020 SUPERSEDED APPENDIX 16.2 CROSS SECTION SHEET 12 Mar 2020View
86B38CA4.PDF12/09/2020 SUPERSEDED APPENDIX 16.2 CROSS SECTION SHEET 22 Mar 2020View
E21D2194.PDF12/09/2020 SUPERSEDED APPENDIX 16.2 CROSS SECTION SHEET 32 Mar 2020View
3AC6DEBC.PDF12/09/2020 SUPERSEDED APPENDIX 16.2 CROSS SECTION SHEET 42 Mar 2020View
3E3FAD18.PDF12/09/2020 SUPERSEDED APPENDIX 16.2 CROSS SECTION SHEET 52 Mar 2020View
FD1245C8.PDF12/09/2020 SUPERSEDED APPENDIX 16.2 CROSS SECTION SHEET 62 Mar 2020View
00C596A8.PDF12/09/2020 SUPERSEDED APPENDIX 16.2 CROSS SECTION SHEET 72 Mar 2020View
5520F45C.PDF12/09/2020 SUPERSEDED APPENDIX 16.2 CROSS SECTION SHEET 82 Mar 2020View
45C1235C.PDF12/09/2020 SUPERSEDED APPENDIX 16.2 CROSS SECTION SHEET 102 Mar 2020View
91C0C414.PDFAPPENDIX 16.3 DESIGN REPORT2 Mar 2020View
B2CBC814.PDFAPPENDIX 16.3 DESIGNERS RISK ASSESSMENT2 Mar 2020View
C7B8D58C.PDFAPPENDIX 16.3 OUTLINE MAINTENANCE2 Mar 2020View
E33FB528.PDFAPPENDIX 16.4 IMPACTS TABLE2 Mar 2020View
APPEND~1.PDFAPP 6.10 BAT ROOST POTENTIAL REPORT18 Jun 2020View
APPEND~2.PDFAPP 6.11 BAT ACTIVITY REPORT18 Jun 2020View
APPEND~1.PDFAPP 7.1 CULTURAL HERITAGE DESK BASE ASSESSMENT18 Jun 2020View
APPEND~1.PDFAPP 8.1 - 8.6 AIR QUALITY18 Jun 2020View
APPEND~1.PDFAPP 9.1 NOISE FIGURES18 Jun 2020View
APPEND~3(7).PDFAPP 9.2 APPENDIX H NIGHT18 Jun 2020View
APPEND~2.PDFAPP 9.2 APPENDIX H DAY18 Jun 2020View
APPEND~2.PDFAPP 10.4 SOIL CHEMICAL18 Jun 2020View
APPEND~1.PDFAPP 11.1 FLOOD RISK ASSESSMENT18 Jun 2020View
APPEND~2.PDFAPP 11.2 HEWRAT ASSESSMENT18 Jun 2020View
APPEND~1.PDFAPP 12 PART 1 TRAFFIC AND TRANSPORT18 Jun 2020View
APPEND~1.PDFAPP 14.1 FIGURES18 Jun 2020View
APPEND~2.PDFAPP 14.2 AGRICULTURAL LAND CLASSIFICATION18 Jun 2020View
Appendix 15.1(2).pdfAPP 15.1 CUMULATIVE IMPACT18 Jun 2020View
APPEND~2.PDFAPP 15.2 OTHER DEVELOPMENT18 Jun 2020View
APPEND~1.PDF12/09/2020 SUPERSEDED APP 16.1 ENVIRONMENTAL MASTER PLAN SHEETS 1-318 Jun 2020View
APPEND~2.PDF12/09/2020 SUPERSEDED APP 16.1 ENVIRONMENTAL MASTER PLAN SHEETS 4-618 Jun 2020View
Appendix 12.7 Accident Rates.pdf12/09/2020 APPENDIX 12.7 ACCIDENT RATES15 Sept 2020View
Appendix 12.8 CTMP.pdf12/09/2020 APPENDIX 12.8 CTMP15 Sept 2020View
Appendix 12.9 Cuerden Technical Note.pdf12/09/2020 APPENDIX 12.9 CUERDEN TECHNICAL NOTE15 Sept 2020View
Appendix 12.10 LinSig Modelling Technical Note.pdf12/09/2020 APPENDIX 12.10 LINSIG MODELLING TECHNICAL NOTE15 Sept 2020View
Appendix 16.1 EMP Sheet 1-3 Updated.pdf12/09/2020 AMENDED APPENDIX 16.1 EMP SHEET 1-3 UPDATED15 Sept 2020View
Appendix 16.1 EMP Sheet 4-6 Updated.pdf12/09/2020 AMENDED APPENDIX 16.1 EMP SHEET 4-6 UPDATED15 Sept 2020View
Appendix 16.1 EMP Sheet 7-9 Updated.pdf12/09/2020 APPENDIX 16.1 EMP SHEET 7-9 UPDATED15 Sept 2020View
Appendix 16.2 Cross Sections Sheet 1 -10.pdf12/09/2020 AMENDED APPENDIX 16.2 CROSS SECTIONS SHEET 1 - 1015 Sept 2020View
Chapter 5 Landscape and Visual Impact- Updated.pdf12/09/2020 AMENDED CHAPTER 5 LANDSCAPE AND VISUAL IMPACT - UPDATED15 Sept 2020View
Chapter 12 Traffic and Transport - updated.pdf12/09/2020 AMENDED CHAPTER 12 TRAFFIC AND TRANSPORT - UPDATED15 Sept 2020View
Appendix 5.3 Visual Receptor Schedule - Updated.pdf12/09/2020 APPENDIX 5.3 VISUAL RECEPTOR SCHEDULE13 Oct 2020View
Appendix 5.4 Viewpoint_05- Updated.pdf12/09/2020 APPENDIX 5.4 VIEWPOINT 05 UPDATED13 Oct 2020View
Appendix 5.5 Arboricultural Impact Assessment- Updated.pdf12/09/2020 APPENDIX 5.5 ARBORICULTURAL IMPACT ASSESSMENT13 Oct 2020View
Appendix 11.1 Flood Risk Assessment_Update.pdf12/09/2020 APPENDIX 11.1 FLOOD RISK ASSESSMENT13 Oct 2020View
Appendix 12.5 – J unction Modelling Results- Addition.pdf12/09/2020 APPENDIX 12.5 JUNCTION MODELLING RESULTS- ADDITION13 Oct 2020View
Site Notice.docxSITE NOTICE18 Mar 2020View
NATIONAL_GRID_NW_GW1B_3NWP_023144_1_3252.pdf17/03/2020 CADENT GAS COMMENTS17 Mar 2020View
17.03.2020 Cadent Gas Comments.pdf17/03/2020 CADENT GAS COMMENTS25 Mar 2020View
Penwortham Way.pdf17/03/2020 PLAN 1 ATTACHMENT TO CADENT GAS COMMENTS25 Mar 2020View
NW_GW1B_3NWP_023144.png17/03/2020 PLAN 2 ATTACHMENT TO CADENT GAS COMMENTS25 Mar 2020View
NW_GW1B_3NWP_023144.pdf17/03/2020 PLAN 3 ATTACHMENT TO CADENT GAS COMMENTS25 Mar 2020View
HE Response Notice - A582 Dualling Scheme HR1(1).pdf01/04/2020 HIGHWAYS ENGLAND COMMENTS2 Apr 2020View
LCC.2020.0014 Archaeology Comments.pdf02/04/2020 ARCHAEOLOGY COMMENTS3 Apr 2020View
LCC.2020.0014 Natural England Comments.pdf03/04/2020 NATURAL ENGLANDS COMMENTS3 Apr 2020View
LCC.2020.0014 HSE Comments.pdf16/04/2020 HEALTH & SAFETY EXECUTIVE COMMENTS17 Apr 2020View
LCC_2020_0014 A582 South Ribble Western - Landscape_Redacted.pdf20/04/2020 LANDSCAPE COMMENTS - JACOBS (REDACTED)20 Apr 2020View
NATIONAL_GRID_NW_GW1B_3NWP_023144_1_3252(1).pdf17/04/2020 CADENT GAS COMMENTS21 Apr 2020View
OHL NO Objection Development Project 20-04-2020 11-05-38.pdf20/04/2020 NATIONAL GRID COMMENTS21 Apr 2020View
ZQ177 - ZQ178.pdfPLAN ZQ177 - ZQ178 ATTACHMENT TO NATIONAL GRID COMMENTS21 Apr 2020View
ZQ178 - ZQ179.pdfPLAN ZQ178 - ZQ179 ATTACHMENT TO NATIONAL GRID COMMENTS21 Apr 2020View
ZQ179 - ZQ180.pdfPLAN ZQ179 - ZQ180 ATTACHMENT TO NATIONAL GRID COMMENTS21 Apr 2020View
LCC_2020_0014 A582 South Ribble Western - Ecology_Redacted.pdf23/04/2020 ECOLOGY COMMENTS - JACOBS24 Apr 2020View
LCC.2020.0014 EA Comments.pdf01/05/2020 ENVIRONMENT AGENCY COMMENTS1 May 2020View
LCC.2020.0014 Sent Letters - LCC A582 Dualling.pdf07/05/2020 SOUTH RIBBLE BOROUGH COUNCIL COMMENTS11 May 2020View
LCC.2020.0014 Highways Englands comments.pdf26/05/2020 HIGHWAY ENGLANDS COMMENTS AND ATTACHMENT26 May 2020View
LCC.2020.0014 Email with additional Highways Englands comments.pdf26/05/2020 ATTACHMENT TO HIGHWAYS ENGLANDS COMMENTS26 May 2020View
LCC.2020.0014 Network Rail comments.pdf27/05/2020 NETWORK RAIL COMMENTS27 May 2020View
HE Response Notice - A582 Dualling Scheme HR3(1).pdf22/07/2020 HIGHWAYS ENGLAND COMMENTS23 Jul 2020View
328820 NE Response.pdf25/09/2020 NATURAL ENGLAND COMMENTS25 Sept 2020View
LCC.2020.0014 Jacobs - Landscape advice update 07-10-20_Redacted(1).pdf07/10/2020 LANDSCAPE FURTHER COMMENTS - JACOBS7 Oct 2020View
Archaeology Comments.pdf08/10/2020 ARCHAEOLOGY COMMENTS8 Oct 2020View
LCC.2020.0014 Environment Agency comments.pdf16/10/2020 ENVIRONMENT AGENCY COMMENTS16 Oct 2020View
LCC.2020.0014 22.10.2020 Highways England Comments_Redacted.pdf22/10/2020 HIGHWAYS ENGLAND COMMENTS22 Oct 2020View
LCC.2020.0014 Highways England Comments.pdf10/11/2020 HIGHWAYS ENGLANDS COMMENTS11 Nov 2020View
HE Response Notice - A582 Dualling Scheme HR_Redacted.pdf07/12/2020 HIGHWAYS ENGLAND FURTHER COMMENTS7 Dec 2020View
LCC.2020.0014 EA Comments(1).pdf04/02/2021 ENVIRONMENT AGENCY COMMENTS5 Feb 2021View
HE Response Notice - A582 Dualling Scheme HR_Redacted(1).pdf31/03/2021 HIGHWAYS ENGLAND COMMENTS1 Apr 2021View
0014 HE Response Notice - A582 Dualling Scheme HR_Redacted.pdf27/05/2021 HIGHWAYS ENGLAND COMMENTS27 May 2021View
HE Response Notice - A582 Dualling Scheme FINAL_Redacted.pdf08/09/2021 HIGHWAYS ENGLAND FURTHER COMMENTS9 Sept 2021View
Residents Letter.docxRESIDENTS LETTER18 Mar 2020View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source

Decision & conditions

-
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.