Council planning record

DEMOLITION OF 4 RESIDENTIAL PROPERTIES, CHANGE OF USE OF THE LAND TO FORM PART OF A WASTEWATER TREATMENT WORKS, REMOVAL OF EXISTING BOUNDARY FENCE, CONSTRUCTION OF NEW BOUNDARY FENCE, CONSTRUCTION OF STONE SURFACED VEHICLE PARKING AREA, AND LANDSCAPING.

8-12 SPRING LANE AND BLACKBURN WASTE WATER TREATMENT WORKS, SAMLESBURY

Application GrantedReference: LCC/2018/0002Lancashire County Council

Last published check: 15 Sept 2026, 00:37. Check the council record for more recent changes.

Application location

8-12 SPRING LANE AND BLACKBURN WASTE WATER TREATMENT WORKS, SAMLESBURY

This record has no verified map location.

Application summary

Status
Application Granted
Application type
Not published
Received
13 Dec 2017
Validated
3 Jan 2018
Determination deadline
Not published
Local authority
Lancashire County Council

Application overview

DEMOLITION OF 4 RESIDENTIAL PROPERTIES, CHANGE OF USE OF THE LAND TO FORM PART OF A WASTEWATER TREATMENT WORKS, REMOVAL OF EXISTING BOUNDARY FENCE, CONSTRUCTION OF NEW BOUNDARY FENCE, CONSTRUCTION OF STONE SURFACED VEHICLE PARKING AREA, AND LANDSCAPING.

Proposal details

Reference
LCC/2018/0002
Parish
SAMLESBURY
Agent
UNITED UTILITIES PLC

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 15 of 15

DocumentPublishedAction
03.01.2018 Amended Forms.pdfAPPROVED APPLICATION FORMS9 Jan 2018View
Fig C5a Location Map.pdfAPPROVED FIG C5A LOCATION PLAN9 Jan 2018View
TS4078 - Blackburn WwTW Existing Site and Location Plans 01 REV B.PDFAPPROVED PLAN 01 REV B LOCATION PLAN AND EXISTING SITE PLAN9 Jan 2018View
TS4078 - Blackburn WwTW Proposed Site Plan and Elevations 02 REV C.PDFAPPROVED PLAN 02 REV C PROPOSED SITE PLAN AND ELEVATIONS9 Jan 2018View
633_00_97_9400_A_LANDSCAPE.PDFAPPROVED PLAN 663/00/97/9400 REV A LANDSCAPING9 Jan 2018View
Supporting Statement.pdfAPPROVED SUPPORTING STATEMENT9 Jan 2018View
4875 001 Tree Survey.pdfAPPROVED TREE SURVEY9 Jan 2018View
11136 Spring Lane Samlesbury (R).pdfAPPROVED ASBESTOS SURVEY REPORT9 Jan 2018View
Bat Method Statement - Blackburn WwTW v1.pdfAPPROVED BAT METHOD SURVEY9 Jan 2018View
ESL- Blackburn WwTW - Barn Owl Mitigation.pdfAPPROVED OWL MITIGATION SURVEY9 Jan 2018View
Fig C6.1 Survey Results (2014).pdfAPPROVE FIG C6.1 SURVEY RESULTS 20149 Jan 2018View
Fig C6.2 Survey Results (2017).pdfAPPROVED FIG C6.2 SURVEY RESULT 20179 Jan 2018View
Fig E3 Specification for Mit-comp.pdfAPPROVED FIG E3 SPECIFICATION FOR MIT-COMP9 Jan 2018View
LCC.2018.0002 Blackburn WWTW Report.pdfDELEGATED REPORT23 Mar 2018View
LCC.2018.0002 Blackburn WWTW Notice.pdfDECISION NOTICE23 Mar 2018View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Committee Date

    Published milestoneCouncil source
  4. Decision Issued Date

    Published milestoneCouncil source

Decision & conditions

Granted
LCC.2018.0002 Blackburn WWTW Notice.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.