Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
HILLHOUSE WASTE WATER TREATMENT WORKS, WOOD LANE, GREAT ALTCAR
Last published check: 20 Sept 2026, 19:25. Check the council record for more recent changes.
HILLHOUSE WASTE WATER TREATMENT WORKS, WOOD LANE, GREAT ALTCAR
This record has no verified map location.
ERECTION OF TWO WINDTURBINES AND ANCILLARY WORKS
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| ApplicationForm.pdfAPPLICATION FORMS | 2 Jul 2015 | View |
| 10012-006 Hillhouse Site Location Plan.pdfAPPROVED PLAN REF 10012 - 006 SITE LOCATION PLAN | 2 Jul 2015 | View |
| 10012-007 Hillhouse Site Plan.pdfAPPROVED PLAN REF 10012 - 007 SITE PLAN | 2 Jul 2015 | View |
| 10012-008 Hillhouse Turbine Elevation.pdfAPPROVED PLAN REF 10012 - 008 TURBINE ELEVATIONS | 2 Jul 2015 | View |
| 10012-014 Hillhouse Typical Transformer Building Elevation.pdfAPPROVED PLAN REF 10012 - 014 TYPICAL TRANSFORMER BUILDING | 2 Jul 2015 | View |
| Hillhouse WwTW Planning Design and Access Statement.pdfPLANNING DESIGN AND ACCESS STATEMENT | 2 Jul 2015 | View |
| Hillhouse WwTW SCC.pdfSTATEMENT OF COMMUNITY CONSULTATION | 2 Jul 2015 | View |
| Annex 1 Cultural Heritage.pdfANNEX 1 CULTURAL HERITAGE | 2 Jul 2015 | View |
| Annex 2 Geology Hydrology Hydrogeology and FRA.pdfANNEX 2 GEOLOGY, HYDROLOGY AND HYDROGEOLOGY AND FLOOD RISK ASSESSMENT | 2 Jul 2015 | View |
| Annex 3 Shadow Flicker.pdfANNEX 3 SHADOW FLICKER ASSESSMENT | 2 Jul 2015 | View |
| Annex 4 Traffic and Transport.pdfANNEX 4 TRAFFIC AND TRANSPORT ASSESSMENT | 2 Jul 2015 | View |
| Annex 5 Aviation.pdfANNEX 5 AVIATION | 2 Jul 2015 | View |
| Annex 6 Radcoms and Television.pdfANNEX 6 RADIO COMMUNICATIONS AND TELEVISION | 2 Jul 2015 | View |
| ES Vol 1 - NTS.pdfES VOLUME 1 NON TECHNICAL SUMMARY | 2 Jul 2015 | View |
| ES Vol 2 - Main Text.pdfES VOLUME 2 ENVIRONMENTAL STATEMENT | 2 Jul 2015 | View |
| ES Vol 3 Part 2 Fig 5.1 - ZTV and Viewpoint Locations.pdfES VOLUME 3 PART 2 FIG 5.1 ZTV AND VIEWPOINT LOCATIONS | 2 Jul 2015 | View |
| ES Vol 3 Part 1 Fig 4.4 Typical Transformer Building Elevation.pdfES VOLUME 3 PART 1 FIG 4.4 TYPICAL TRANSFORMER BUILDING | 2 Jul 2015 | View |
| ES Vol 3 Part 1 Fig 4.3 Turbine Elevation.pdfES VOLUME 3 PART 1 FIG 4.3 TURBINE ELEVATIONS | 2 Jul 2015 | View |
| ES Vol 3 Part 1 Fig 4.2 Site Plan.pdfES VOLUME 3 PART 1 FIG 4.2 SITE PLAN | 2 Jul 2015 | View |
| ES Vol 3 Part 1 Fig 4.1 Site Location Plan.pdfES VOLUME 3 PART 1 FIG 4.1 LOCATION PLAN | 2 Jul 2015 | View |
| ES Vol 3 Part 2 Fig 5.17a-5.17b - Viewpoint 4.pdfES VOLUME 3 PART 2 FIG 5.17A - 5.17B VIEWPOINTS | 2 Jul 2015 | View |
| ES Vol 3 Part 2 Fig 5.16a-5.16b - Viewpoint 3.pdfES VOLUME 3 PART 2 FIG 5.16A - 5.16B VIEWPOINTS | 2 Jul 2015 | View |
| ES Vol 3 Part 2 Fig 5.15a-5.15b - Viewpoint 2.pdfES VOLUME 3 PART 2 FIG 5.15A - 5.15B VIEWPOINTS | 2 Jul 2015 | View |
| ES Vol 3 Part 2 Fig 5.14a-5.14c - Viewpoint 1.pdfES VOLUME 3 PART 2 FIG 5.14A - 5.14C VIEWPOINTS | 2 Jul 2015 | View |
| ES Vol 3 Part 2 Fig 5.13 - Cumulative ZTV 8 - Hillhouse and Moss Lane.pdfES VOLUME 3 PART 2 FIG 5.13 CUMULATIVE ZTV 8 HILLHOUSE AND MOSS LANE | 2 Jul 2015 | View |
| ES Vol 3 Part 2 Fig 5.12 - Cumulative ZTV 7 - Hillhouse and Walkers Snacks.pdfES VOLUME 3 PART 2 FIG 5.12 CUMULATIVE ZTV 7 HILLHOUSE AND WALKERS SNACKS | 2 Jul 2015 | View |
| ES Vol 3 Part 2 Fig 5.11 - Cumulative ZTV 6 - Hillhouse and Simonswood Industrial Park.pdfES VOLUME 3 PART 2 FIG 5.11 CUMULATIVE ZTV 6 HILLHOUSE AND SIMONSWOOD INDUSTRIAL | 2 Jul 2015 | View |
| ES Vol 3 Part 2 Fig 5.10 - Cumulative ZTV 5 - Hillhouse and Red Cut Lane.pdfES VOLUME 3 PART 2 FIG 5.10 CUMULATIVE ZTV 5 HILLHOUSE AND RED CUT LANE | 2 Jul 2015 | View |
| ES Vol 3 Part 2 Fig 5.4 - ZTV and Visual Receptors.pdfES VOLUME 3 PART 2 FIG 5.4 ZTV AND VISUAL RECEPTORS | 2 Jul 2015 | View |
| ES Vol 3 Part 2 Fig 5.3 - ZTV with Relevant Designations and Green Belt.pdfES VOLUME 3 PART 2 FIG 5.3 ZTV WITH RELEVANT DESIGNATION AND GREENBELT | 2 Jul 2015 | View |
| ES Vol 3 Part 2 Fig 5.21a-5.21b - Viewpoint 8.pdfES VOLUME 3 PART 2 FIG 5.214A - 5.21C VIEWPOINTS | 2 Jul 2015 | View |
| ES Vol 3 Part 2 Fig 5.20a-5.20b - Viewpoint 7.pdfES VOLUME 3 PART 2 FIG 5.20A - 5.20C VIEWPOINTS | 2 Jul 2015 | View |
| ES Vol 3 Part 2 Fig 5.2 - Landscape Character Areas.pdfES VOLUME 3 PART 2 FIG 5.2 LANDSCAPE CHARACTER | 2 Jul 2015 | View |
| ES Vol 3 Part 2 Fig 5.19a-5.19b - Viewpoint 6.pdfES VOLUME 3 PART 2 FIG 5.19A - 5.19B VIEWPOINTS | 2 Jul 2015 | View |
| ES Vol 3 Part 2 Fig 5.18a-5.18b - Viewpoint 5.pdfES VOLUME 3 PART 2 FIG 5.18A - 5.18B VIEWPOINTS | 2 Jul 2015 | View |
| ES Vol 3 Part 2 Fig 5.9 - Cumulative ZTV 4 - Hillhouse and Fazakerley.pdfES VOLUME 3 PART 2 FIG 5.9 ZTV 4 HILLHOUSE AND FAZAKERLEY WWTW | 2 Jul 2015 | View |
| ES Vol 3 Part 2 Fig 5.8 - Cumulative ZTV 3 - Hillhouse and Port of Liverpool.pdfES VOLUME 3 PART 2 FIG 5.3 ZTV 3 HILLHOUSE AND PORT OF LIVERPOOL | 2 Jul 2015 | View |
| ES Vol 3 Part 2 Fig 5.7 - Cumulative ZTV 2 - Hillhouse and Seaforth.pdfES VOLUME 3 PART 2 FIG 5.7 ZTV 2 HILLHOUSE AND SEAFORTH | 2 Jul 2015 | View |
| ES Vol 3 Part 2 Fig 5.6 - Cumulative ZTV 1 Hillhouse and Burbo Bank.pdfES VOLUME 3 PART 2 FIG 5.6 ZTV 1 HILLHOUSE BURBO BANK | 2 Jul 2015 | View |
| ES Vol 3 Part 2 Fig 5.5 - Cumulative schemes within 15km.pdfES VOLUME 3 PART 2 FIG 5.5 CULULATIVE SCHEMES WITHIN THE 15KM STUDY AREA | 2 Jul 2015 | View |
| ES Vol 4 Appendix E - Noise.pdfES VOLUME 4 APPENDIX E NOISE | 2 Jul 2015 | View |
| ES Vol 4 Appendix Db - Ornithology.pdfES VOLUME 4 APPENDIX Db ORNITHOLOGY PLAN G5201.007 SHELDUCK FLIGHTLINES | 2 Jul 2015 | View |
| ES Vol 4 Appendix Da - Ornithology.pdfES VOLUME 4 APPENDIX Da ORNITHOLOGY | 2 Jul 2015 | View |
| ES Vol 4 Appendix C - Ecology.pdfES VOLUME 4 APPENDIX C ECOLOGY | 2 Jul 2015 | View |
| ES Vol 4 Appendix B - Landscape and Visual.pdfES VOLUME 4 APPENDIX B LANDSCAPE AND VISUAL | 2 Jul 2015 | View |
| ES Vol 4 Appendix A - EIA Screening and Scoping.pdfES VOLUME 4 APPENDIX A SCREENING AND SCOPING REQUESTS AND OPINIONS | 2 Jul 2015 | View |
| Site Notice.pdf09/07/2015 SITE NOTICE | 2 Jul 2015 | View |
| Item 8 Hillhouse WWTW LCC.2015.0061.pdfITEM 8 COMMITTEE REPORT 09/12/2015 | 2 Dec 2015 | View |
| Item 4 LCC.2015.0061 Hillhouse WWTW.pdfCOMMITTEE REPORT | Not published | View |
| LCC.2015.0061 Hillhouse Waste Water treatment notice.pdfDECISION NOTICE | 25 Jan 2016 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.