Council planning record

CONSTRUCTION AND OPERATION OF AN ANAEROBIC DIGESTION PLANT INCLUDING A MAIN RECEPTION BUILDING, BIOGAS HOLDER, ASSOCIATED STORAGE TANKS, 2 CHP ENGINES, STANDBY FLARE, SERVICE YARD, WEIGHBRIDGE AND OFFICES AND WATER MANAGEMENT LAGOON

FLETCHER BANK QUARRY, MANCHESTER ROAD, RAMSBOTTOM

Application GrantedReference: 14/13/0374Lancashire County Council

Last published check: 21 Sept 2026, 00:27. Check the council record for more recent changes.

Application location

FLETCHER BANK QUARRY, MANCHESTER ROAD, RAMSBOTTOM

This record has no verified map location.

Application summary

Status
Application Granted
Application type
Not published
Received
13 Aug 2013
Validated
13 Aug 2013
Determination deadline
Not published
Local authority
Lancashire County Council

Application overview

CONSTRUCTION AND OPERATION OF AN ANAEROBIC DIGESTION PLANT INCLUDING A MAIN RECEPTION BUILDING, BIOGAS HOLDER, ASSOCIATED STORAGE TANKS, 2 CHP ENGINES, STANDBY FLARE, SERVICE YARD, WEIGHBRIDGE AND OFFICES AND WATER MANAGEMENT LAGOON

Proposal details

Reference
14/13/0374
Agent
SLR CONSULTING LIMITED

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 71 of 71

DocumentPublishedAction
13.08.2013 Amended Application Forms.pdfAPPLICATION FORMS14 Aug 2013View
00304.00047.18.FBA2-1.0_Site Survey-Layout1.pdfPLAN FBA 2/1 SITE SURVEY14 Aug 2013View
00304.00047.18.FBA12-6.0_RL ZTV.pdfPLAN FBA 12/6 ZTV OF PROPOSED RESTORATION LANDFORM14 Aug 2013View
00304.00047.18.FBA12-5.0_AD2 ZTV.pdfPLAN FBA 12/5 ZTV ANAEROBIC DIGESTION PLANT PROPOSED RESTORATION LANDFORM AS SCREENING14 Aug 2013View
00304.00047.18.FBA12-3.0_POST-MEDIEVAL_ASSETS_LH.pdfFBA 12/3 POST MEDIEVAL MODERN ASSESTS14 Aug 2013View
00304.00047.18.FBA12-2.0_POST-MEDIEVAL_ASSETS_IN_SITE_BOUNDARY_LH.mxd.pdfPLAN FBA 12/2 POST MEDIEVAL ASSETS WITHIN SITE BOUNDARY14 Aug 2013View
00304.00047.18.FBA12-1.0_PREHISTORIC-MEDIEVAL_ASSETS_LH.pdfPLAN FBA 12/1 PREHISTORIC- MEDIEVAL ASSETS14 Aug 2013View
00304.00047.18.FBA1-1.0 Location Plan-Drawing 1.pdfSUPERSEDED PLAN FBA 1/1 LOCATION PLAN14 Aug 2013View
00304.00047.18.FBA6-3.0_ZTV_PR_LAND_ONLY.pdfPLAN FBA 6/3 PROPOSED RESTORATION LANDFORM14 Aug 2013View
00304.00047.18.FBA6-2.0_ZTV_AD_WITH_PR.pdfPLAN FBA 6/2 PROPOSED RESTORATION LANDFORM AS SCREENING14 Aug 2013View
00304.00047.18.FBA6-1.0_ZTV_AD_WITH_EX.pdfPLAN FBA 6/1 ZTV ANAEROBIC DIGESTION PLANT EXISTING LAND FORM14 Aug 2013View
00304.00047.18.FBA3-7.0 Illustrative Visualisations-Layout1.pdfPLAN FBA 3/7 ILLUSTRATIVE VISUALISATION14 Aug 2013View
00304.00047.18.FBA3-6.0 AD CHP Engines Containers-Layout1.pdfPLAN FBA 3/6 AD CHP ENGINE CONTAINERS14 Aug 2013View
00304.00047.18.FBA3-5.0 Indicative Process Building Internal Layout-Layout1.pdfPLAN FBA 3/5 INDICATIVE PROCESS BUILDING INTERNAL LAYOUT14 Aug 2013View
00304.00047.18.FBA3-4.0 Process AD Building Elevations-Layout1.pdfPLAN FBA 3/4 AD PROCESS BUILDING ELEVATIONS14 Aug 2013View
00304.00047.18.FBA3-3.0 Proposed AD Site Cross Sections-Layout1.pdfPLAN FBA 3/3 PROPOSED AD SITE CROSS SECTIONS14 Aug 2013View
00304.00047.18.FBA3-2.0 Proposed AD Site Layout_Layout1.pdfPLAN FBA 3/2 PROPOSED AD SITE LAYOUT14 Aug 2013View
00304.00047.18.FBA3-10.0 Revised Restoration Sections_Layout1.pdfAPPROVED PLAN FBA 3/10 REVISED RESTORATION SECTIONS14 Aug 2013View
00304.00047.18.FBA3-1.0_General_Arrangement_A3.pdfAPPROVED PLAN FBA 3/1 GENERAL ARRANGEMENTS14 Aug 2013View
00304.00047.18.FBA2-3.0_Application Site AD Plant-Layout1.pdfPLAN FBA 2/3 ANAEROBIC DIGESTION PLANT14 Aug 2013View
00304.00047.18.FBA2-2.0_Application Site Inert-Layout1.pdfPLAN FBA 2/2 REVISED RESTORATION SCHEME14 Aug 2013View
00304.0047.0.AQ3.0 Predicted short-term NO2 process contribution-lo-res.pdfPLAN AQ3 PREDICTED SHORT TERM N02 PROCESS CONTRIBUTION14 Aug 2013View
00304.0047.0.AQ2.0 Ecological receptors (within 2km)-lo-res.pdfPLAN AQ2 ECOLOGICAL RECEPTORS14 Aug 2013View
00304.0047.0.AQ1.0 Monitoring Locations-lo-res.pdfPLAN AQ1 DISCRETE HUMAN RECEPTORS AND N02 DIFFUSION LOCATIONS14 Aug 2013View
00304.00047.18.FBAL 2-2.0_AD_redline_Lancs-Layout1.pdfAPPROVED FBAL 2/2 APPLICATION SITE LANCASHIRE ANAEROBIC DIGESTION PLANT14 Aug 2013View
00304.00047.18.FBA7-2.0 Habitat Plan-200CM_RES_AERIAL.pdfPLAN FBA 7/2 HABITAT PLAN14 Aug 2013View
00304.00047.18.FBA7-1.0 Statutory _ Non-statutory Sites.mxd.pdfPLAN FBA 7/1 STATUTORY ANSD NON STATUTORY SITES14 Aug 2013View
00304.0047.0.AQ8.0 Predicted odour impact-lo-res.pdfPLAN AQ8 PREDICTED ODOUR IMPACT14 Aug 2013View
00304.0047.0.AQ7.0 Predicted long-term NOx and SO2 process contribution-lo-res.pdfPLAN AQ7 PREDICTED LONG TERM NO2 AND SO2 PROCESS CONTRIBUTIONS14 Aug 2013View
00304.0047.0.AQ6.0 Predicted 24-hour SO2 process contribution-lo-res..pdfPLAN AQ6 PREDICTED 24 HOURNSO2 PROCESS CONTRIBUTIONS14 Aug 2013View
00304.0047.0.AQ5.0 Predicted short-term SO2 process contribution.pdfPLAN AQ5 PREDICTED SHORT TERM SO2 PROCESS CONTRIBUTION14 Aug 2013View
00304.0047.0.AQ4.0 Predicted long-term NO2 process contribution-lo-res.pdfPLAN AQ4 PREDICTED LONG TERM NO2 PROCESS CONTRIBUTION14 Aug 2013View
00304.00047.18.FBA3-8.0 Phasing of Infilling_Layout1.pdfAPPROVED PLAN FBA 3/8 PHASING OF FILLING14 Aug 2013View
SAVED FBA5-1.0 Regional Geology.mxd.pdfPLAN FBA 5/1 REGIONAL GEOLOGY14 Aug 2013View
SAVED FBA3-9.0 Revised Restoration Scheme_A3.pdfAPPROVED PLAN FBA 3/9 REVISED RESTORATION SCHEME14 Aug 2013View
14.13.0374 .FBAL2-4.0_Long_Sections_Through_Proposed_Lagoon_A2.pdfAPPROVED PLAN FBAL 2/4 LONG SECTIONS THROUGH PROPOSED LAGOON25 Nov 2013View
14-13-0374-146.pdfAPPROVED FBA 3/11 SECTION LINES6 May 2014View
00304.00047.18.FBA6-5.0_VP3_4.pdfPLAN FBA 6/5 VIEWPOINT 3 AND 614 Aug 2013View
00304.00047.18.FBA6-4.0_VP1_2.pdfPLAN FBA 6/4 VIEWPOINTS 1 AND 214 Aug 2013View
00304.00047.18.FBA5-2.0 Local Hydrogeology_Hydrology.mxd-lo-res.pdfHYDROLOGY14 Aug 2013View
00304.00047.18.FBA6-7.0_VP7.pdfPLAN FBA 6/7 VIEWPOINT 714 Aug 2013View
00304.00047.18.FBA6-6.0_VP5_6.pdfPLAN FBA 6/6 VIEWPOINTS 5 AND 614 Aug 2013View
130730 ES_Section9_Carbon_Climate Change_ISSUE.pdfSECTION 9 ENVIRONMENTAL STATEMENT14 Aug 2013View
130730 ES_Section8_Noise_ISSUE.pdfSECTION 8 ENVIRONMENTAL STATEMENT14 Aug 2013View
130730 ES_Section7_Ecology_ISSUE.pdfSECTION 7 ENVIRONMENTAL STATEMENT14 Aug 2013View
130730 ES_Section6_LVIA_ISSUE.pdfSECTION 6 ENVIRONMENTAL STATEMENT14 Aug 2013View
130730 ES_Section5_Hydrogeology_hydrology_ISSUE.pdfSECTION 5 ENVIRONMENTAL STATEMENT14 Aug 2013View
130730 ES_Section4_Policy_ISSUE.pdfSECTION 4 ENVIRONMENTAL STATEMENT14 Aug 2013View
130730 ES_Section3_Proposed Development_ISSUE.pdfSECTION 3 ENVIRONMENTAL STATEMENT14 Aug 2013View
130730 ES_Section2_Site Description_ISSUE.pdfSECTION 2 ENVIRONMENTAL STATEMENT14 Aug 2013View
130730 ES_Section12_Cultural Heritage_ISSUE.pdfSECTION 12 ENVIRONMENTAL STATEMENT14 Aug 2013View
130730 ES_Section11_Highways_ISSUE.pdfSECTION 11 ENVIRONMENTAL STATEMENT14 Aug 2013View
130730 ES_Section10_Air Quality_ISSUE.pdfSECTION 10 ENVIRONMENTAL STATEMENT14 Aug 2013View
130730 ES_Section1_Introduction_ISSUE.pdfSECTION 1 ENVIRONMENTAL STATEMENT14 Aug 2013View
130628 403.00034.00047 Appendix 12_3.pdfASSETS WITHIN ZTV OF RESTORED LANDFORM14 Aug 2013View
130628 403.00034.00047 Appendix 12_2.pdfGAZETTEER OF HERITAGE ASSETS WITHIN 2KM OF STUDY AREA14 Aug 2013View
130628 403.00034.00047 Appendix 12_1.pdfAPPENDIX 12A CULTURAL HERITAGE IMPACT ASSESSMENT METHODOLOGY14 Aug 2013View
Appendix 8-1-4.pdfAPPENDIX 8.1 GLOSSERY OF TERMINOLOGY14 Aug 2013View
Appendix 7-2.pdfAPPENDIX 7.2 SITES OF SPECIAL SCIENTIFIC INTEREST14 Aug 2013View
Appendix 7-1.pdfAPPENDIX 7.1 LANCASHIRE ENVIRONMENT RECORD NETWORK RECORDS14 Aug 2013View
Appendix 5.3.pdfAPPENDIX 5.3 CERTIFICATE OF ANALYSIS14 Aug 2013View
Appendix 5.2.pdfAPPENDIX 5.2 SCHEMATIC CROSS SECTION A-A14 Aug 2013View
Appendix 5.1.pdfAPPENDIX 5.1 GROUND WATER LEVELS MONITORED 28/05/199614 Aug 2013View
Appendix 11-1.pdfAPPENDIX 11.1 TRAFFIC ACCIDENT DATA14 Aug 2013View
Appendix 10_1.pdfDETAILED AIR QUALITY AND ODOUR IMPACT ASSESSMENT14 Aug 2013View
130730_NTS_Front Cover.pdfFRONT COVER NON TECHNICAL SUMMARY14 Aug 2013View
130730_ES_Front Cover and Contents.pdfFRONT COVER ENVIRONMENTAL STATEMENT14 Aug 2013View
130730 NTS_ISSUE.pdfNON TECHNICAL SUMMARY14 Aug 2013View
130730_Planning Supporting Statement_ISSUE.pdfPLANNING SUPPORTING STATEMENT14 Aug 2013View
Itenm 6 committee 27.11.2013 app 14.13.0374 Fletcher Bank.pdfREPORT ITEM 6 COMMITTEE 27/11/201327 Nov 2013View
14.13.0374 Fletcher Bank Notice.pdfDECISION NOTICE29 Nov 2013View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Committee Date

    Published milestoneCouncil source
  4. Decision Issued Date

    Published milestoneCouncil source

Decision & conditions

Granted
14.13.0374 Fletcher Bank Notice.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.