Council planning record

COMPLIANCE WITH CONDITIONS 4, COMPOUND AREAS, 7, REVERSING ALARMS, 9, ACCESS POINTS, 12, HIGHWAY SURFACING DETAILS, 13 BRIDLEWAY, 16, TOPSOIL, 20 FLOOD MITIGATION, 21 ARCHAEOLOGY, 24, LANDSCAPE PHASING, 26 ECOLOGY MEASURES AND 27 DELIVERY OF ECOLOGY MEASURES OF PERMISSION 05/10/0779

LYTHAM MOSS LYTHAM ST ANNES (M55 TO HEYHOUSES LINK)

Application OngoingReference: 05/10/0779/1Lancashire County Council

Application location

LYTHAM MOSS LYTHAM ST ANNES (M55 TO HEYHOUSES LINK)

This record has no verified map location.

Application summary

Status
Application Ongoing
Application type
Not published
Received
21 Oct 2016
Validated
21 Oct 2016
Determination deadline
Not published
Local authority
Lancashire County Council

Application overview

COMPLIANCE WITH CONDITIONS 4, COMPOUND AREAS, 7, REVERSING ALARMS, 9, ACCESS POINTS, 12, HIGHWAY SURFACING DETAILS, 13 BRIDLEWAY, 16, TOPSOIL, 20 FLOOD MITIGATION, 21 ARCHAEOLOGY, 24, LANDSCAPE PHASING, 26 ECOLOGY MEASURES AND 27 DELIVERY OF ECOLOGY MEASURES OF PERMISSION 05/10/0779

Proposal details

Reference
05/10/0779/1
Agent
LANCASHIRE COUNTY COUNCIL

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 38 of 38

DocumentPublishedAction
Application forms.pdfAPPLICATION FORMS27 Oct 2016View
D4996.016G Construction Management Plan.pdf14/11/2016 SUPERSEDED CONDITION 4 -CONSTRUCTION MANAGEMENT PLAN27 Oct 2016View
bbs-tek_brochure 1.pdfCONDITION 7 REVERSING ALARMS27 Oct 2016View
__www.ecogreenplanthire.co.uk_.pdfCONDITION 9 WHEEL WASH DETAILS AT ACCESS POINTS27 Oct 2016View
WheelWash-Systems.pdfCONDITION 9 WHEEL WASH DETAILS AT ACCESS POINTS27 Oct 2016View
D4996.016G Construction Management Plan(2).pdfCONDITION 9 MANAGEMENT PLAN27 Oct 2016View
HRA Surface Course Performance design for very heavily stressed sites.pdfCONDITION 12 HIGHWAY SURFACING27 Oct 2016View
D4996.017 Cropper Road Roundabout - Bridleway-Cycleway Link Proposals.pdfCONDITION 13 CROPPER RD ROUNDABOUT BRIDLEWAY27 Oct 2016View
Moss Road Sections dwg KD600_01.pdfCONDITION 13 MOSS ROAD SECTIONS BRIDLEWAY27 Oct 2016View
BHS Advice note 11_2015.pdfCONDITION 13 BHS ADVICE NOTES FOR HORSES27 Oct 2016View
D4996.016G Construction Management Plan(3).pdfCONDITION 13 CONSTRUCTION MANAGEMENT PLAN27 Oct 2016View
4996 014 M55 Link Road Condition 20 Compensatory Floodplain Soil Management Scheme.pdfCONDITION 20 FLOOD RISK MITIGATION27 Oct 2016View
5471.002.pdfCONDITION 21 ARCHAEOLOGY27 Oct 2016View
Figure 9.4 Landscape Strategy Sheet 1 of 3 @ A1.pdfCONDITION 24 LANDSCAPE STRATERGY SHEET 1 OF 327 Oct 2016View
Figure 9.5 Landscape Strategy Sheet 2 of 3 @ A1.pdfCONDITION 24 LANDSCAPE STRATERGY SHEET 2 OF 327 Oct 2016View
Figure 9.6 Landscape Strategy Sheet 3 of 3 @ A1.pdfCONDITION 24 LANDSCAPE STRATERGY SHEET 3 OF 327 Oct 2016View
Figure 9.7 Landscape Sections Sheet 1 of 2 @ A1.pdfCONDITION 24 LANDSCAPE SECTIONS SHEET 1 OF 227 Oct 2016View
Figure 9.7 Landscape Sections Sheet 2 of 2 @ A1.pdfCONDITION 24 LANDSCAPE SECTIONS SHEET 2 OF 227 Oct 2016View
Part 1 Habitat Creation Plan.pdfCONDITION 27 PART 1 HABITAT CREATION PLAN27 Oct 2016View
Part 2 Habitat Creation Plan.pdfCONDITION 27 PART 2 HABITAT CREATION PLAN27 Oct 2016View
Part 3 Habitat Creation Plan.pdfCONDITION 27 PART 3 HABITAT CREATION PLAN27 Oct 2016View
Part 4 Habitat Creation Plan.pdfCONDITION 27 PART 4 HABITAT CREATION PLAN27 Oct 2016View
Part 5 Habitat Creation Plan.pdfCONDITION 27 PART 5 HABITAT CREATION PLAN27 Oct 2016View
Part 6 Habitat Creation Plan.pdfCONDITION 27 PART 6 HABITAT CREATION PLAN27 Oct 2016View
Part 7 Habitat Creation Plan.pdfCONDITION 27 PART 7 HABITAT CREATION PLAN27 Oct 2016View
Part 8 Habitat Creation Plan.pdfCONDITION 27 PART 8 HABITAT CREATION PLAN27 Oct 2016View
Part 9 Habitat Creation Plan.pdfCONDITION 27 PART 9 HABITAT CREATION PLAN27 Oct 2016View
Part 10 Habitat Creation Plan.pdfCONDITION 27 PART 10 HABITAT CREATION PLAN28 Oct 2016View
Part 1 Ecology Mitigation Measures.pdfCONDITION 26 PART 1 ECOLOGY MITIGATION MEASURES10 Nov 2016View
Part 2 Ecology Mitigation Measures.pdfCONDITION 26 PART 2 ECOLOGY MITIGATION MEASURES10 Nov 2016View
Part 3 Ecology Mitigation Measures.pdfCONDITION 26 PART 3 ECOLOGY MITIGATION MEASURES10 Nov 2016View
Part 4 Ecology Mitigation Measures.pdfCONDITION 26 PART 4 ECOLOGY MITIGATION MEASURES10 Nov 2016View
14.11.2016 amended plan Construction Management.pdf14/11/2016 AMENDED CONDITION 4 CONSTRUCTION MANAGEMENT PLAN29 Nov 2016View
05 10 0779 1 LCC ecology response 15 11 16.pdf15/11/2016 ECOLOGY COMMENTS16 Nov 2016View
05.10.0779.1 ea comments.pdf08/12/2016 ENVIRONMENT AGENCY COMMENTS8 Dec 2016View
0779.1 suds comments.pdf16/12/2016 FLOOD AUTHORITY COMMENTS16 Dec 2016View
10_0779_1-LAAS.pdf04/02/2019 LANCASHIRE ARCHAEOLOGICAL ADVISORY SERVICE COMMENTS4 Feb 2019View
5.10.0779.1 Heyhouse Link Report.pdfDELEGATED REPORT28 May 2020View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source

Decision & conditions

-
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.