DEMOLITION OF PART OF THE SCHOOL BUILDINGS AND CONSTRUCTION OF A 2/3 STOREY BUILDING, EXTERNAL WALKWAY, GLAZED LINK ROOF, REMODELLED CARETAKER BUILDING, RECONFIGURATION OF PARKING AND EXTERNAL PLAY AREAS.

BOWLAND HIGH SCHOOL SAWLEY ROAD GRINDLETON

Application GrantedReference: 03/12/1059Lancashire County Council

Last published check: 21 Sept 2026, 01:40. Check the council record for more recent changes.

Application location

BOWLAND HIGH SCHOOL SAWLEY ROAD GRINDLETON

This record has no verified map location.

Application summary

Status
Application Granted
Application type
Not published
Received
22 Nov 2012
Validated
22 Nov 2012
Determination deadline
Not published
Local authority
Lancashire County Council

Application overview

DEMOLITION OF PART OF THE SCHOOL BUILDINGS AND CONSTRUCTION OF A 2/3 STOREY BUILDING, EXTERNAL WALKWAY, GLAZED LINK ROOF, REMODELLED CARETAKER BUILDING, RECONFIGURATION OF PARKING AND EXTERNAL PLAY AREAS.

Proposal details

Reference
03/12/1059
Parish
GRINDLETON
Agent
JWPC LTD

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 51 of 51

DocumentPublishedAction
ApplicationForm.pdfAPPLICATION FORM4 Dec 2012View
4266 L(1-)11 Proposed Caretaker Building_(01)_2012.11.26.pdf19/12/2012 SUPERCEDED PLAN L(1-)11 REV 01 PROPOSED CARETAKER BUILDING PLANS AND ELEVATIONS4 Dec 2012View
4266 L(1-)10 Existing Caretaker Building_(01)_2012.09.04.pdfPLAN L(1-)10 REV 01 EXISTING CARETAKER BUILDING PLANS AND ELEVATIONS4 Dec 2012View
4266 L(1-)06_ Proposed Roof Plan_Rev 01_2012.11.26.pdf19/12/2012 SUPERCEDED PLAN L(1-)06 REV 01 PROPOSED ROOF PLAN4 Dec 2012View
4266 L(1-)05_ Proposed First Floor Plan_Rev 13_2012.11.26.pdf19/12/2012 SUPERCEDED PLAN L(1-)05 REV 13 PROPOSED FIRST FLOOR PLAN4 Dec 2012View
4266 L(1-)04_ Proposed Upper Ground Floor Plan_Rev 13_2012.11.26.pdfPLAN L(00)10 REV 01 EXISTING STE PLAN4 Dec 2012View
4266 L(00) 10_ Existing Site Plan_01_2012.11.26.pdfPLAN L(00)10 REV 01 EXISTING STE PLAN4 Dec 2012View
4266 L(00) 03_ Proposed Site Plan_04_2012.11.26.pdf19/12/2012 SUPERCEDED PLAN L(00)03 REV 04 PROPOSED SITE PLAN4 Dec 2012View
4266 L(2-)03_Proposed Elevations_Rev 07_2012.11.22_COLOURED.pdfPLAN L(2-)03 REV 07 EXISTING ELEVATIONS SHEET 1 OF 24 Dec 2012View
4266 L(2-)02 Existing Elevation Sheet 2 of 2_(01)_2012.11.26.pdfPLAN L(2-)01 REV 01EXISTING ELEVATIONS SHEET 2 OF 24 Dec 2012View
4266 L(2-)01 Existing Elevation Sheet 1 of 2_(01)_2012.11.26.pdfPLAN L(2-)01 REV 01EXISTING ELEVATIONS SHEET 1 OF 24 Dec 2012View
Bowland 4266 L(2-)03_Proposed Elevations_Rev 08_2012.12.17.pdf19/12/2012 AMENDED 4266 L(2-)03_Proposed Elevations_Rev 0819 Dec 2012View
Bowland 4266 L(1-)11 Proposed Caretaker Building_(02)_2012.12.13.pdf19/12/2012 AMENDED 4266 L(1-)11 Proposed Caretaker Building_(02)19 Dec 2012View
Bowland 4266 L(1-)06_ Proposed Roof Plan_Rev 02_2012.12.13.pdf19/12/2012 AMENDED 4266 L(1-)06_ Proposed Roof Plan_Rev 0219 Dec 2012View
Bowland 4266 L(00) 15_ Proposed Landscape Layout_00_2012.12.13.pdf19/12/2012 AMENDED 4266 L(00) 15_ Proposed Landscape Layout_0019 Dec 2012View
Bowland 4266 L(00) 03_ Proposed Site Plan_05_2012.12.13.pdf19/12/2012 AMENED 4266 L(00) 03_ Proposed Site Plan19 Dec 2012View
Bowland 4054-E10 Proposed Elevations & External Lighting - PLANNING.pdf19/12/2012 AMENDED 4054-E10 Proposed Elevations & External Lighting19 Dec 2012View
4266 L(00) 03_ Proposed Site Plan_06_2013.01.16.pdf17/01/2013 AMENDED PLAN L(00)03 REV 06 PROPOSED SITE PLAN17 Jan 2013View
4266 L(2-)03_Proposed Elevations_Rev 09_2013.07.24_COLOURED.PDF4266-l92-)03 PROPOSED ELEVATIONS SHEET 1 OF 26 Aug 2013View
4266 L(1-)11 Proposed Caretaker Building_(03)_2013.08.19.pdf4266 L(1-) 11 PROPOSED CARETAKER BUILDING PLANS AND ELEVATIONS20 Aug 2013View
4266 L(00)04_Contractors Compound__Rev T3_2013.08.23.pdfPLAN 4266 CONTRACTORS COMPOUND2 Sept 2013View
Plan bowland high.pdfPLAN L(1-)03 REV 12 PROPOSED LOWER GROUND FLOOR PLAN4 Sept 2013View
22.11.2012 Bowland High School Bat Method Statement Attachment.pdfBAT LICENCE METHOD STATEMENT4 Dec 2012View
16.10.2012 ADDITIONAL Bat report.pdfBAT INSPECTION AND EMERGENCE SURVEY REPORT4 Dec 2012View
01.10.12 Planning Support Statement.pdfSUPPORTING STATEMENT4 Dec 2012View
01.10.12 Covering Letter.pdf21/09/2012 COVERING LETTER ACCOMPANYING APPLICATION4 Dec 2012View
Simply Ecology LPG Grindleton Bat.pdfBATS: BUILDING SURVEY4 Dec 2012View
Bowland High School Bat Method Statement Attachment.pdf22/11/2012 BAT LICENCE METHOD STATEMENT4 Dec 2012View
BOW17-426 Bowland High school Bat report 151012.pdf.pdfBAT INSPECTION AND EMERGENCE SURVEY REPORT 211 Dec 2012View
685_Bowland High_LVIA_v2.pdfLANDSCAPE AND VISUAL IMPACT ASSESSMENT4 Dec 2012View
4266_Bowland High School_Design and Access Statement_2012.pdfDESIGN AND ACCESS STATEMENT4 Dec 2012View
4266- Bowland High School - Material Examples.pdf23.08.2013 SUPERCEDED MATERIAL EXAMPLES11 Dec 2012View
Survey, Bowland High School. 19.12.12..pdf20/12/2012 SURVEY DETAILS FOR TREES ARBORICULTURAL CONSULTANT3 Jan 2013View
Letter Bowland High School 19 12 12final.pdf20/12/2012 SITE ACCESS IMPROVEMENT DETAILS ARBORICULTURAL CONSULTANT3 Jan 2013View
Bowland High School Bat Method Statement 20 Dec 2012 FINAL.pdf21/12/2012 FINAL BAT METHOD STATEMENT3 Jan 2013View
FW_ Bowland High School 03.12.1059 Bat Survey Attachment.pdfBAT SURVEY8 Jan 2013View
Bowland parking statement.pdfPARKING STATEMENT9 Jan 2013View
Bus Stop Area.jpg17/01/2013 BUS STOP AREA17 Jan 2013View
Bow017 426 Bowland School response to consultation 170113 (2).pdf17/01/2013 BOWLAND ECOLOGY RESPONSE TO LCC AND NATURAL ENGLANDS RESPONSE17 Jan 2013View
2013-01-16-Drawing Issue Sht.pdf17.01.2013 NEW PLAN SCHEDULE17 Jan 2013View
Travel Plan.pdfTRAVEL PLAN17 Jan 2013View
Bus Stop markings 002.JPG17/01/2013 BUS STOP MARKINGS17 Jan 2013View
Bus Stop markings 001.JPG17/01/2013 BUS STOP MARKINGS17 Jan 2013View
BOW17_426 Bowland High school Bat Method Statement 5_8_13.pdfBAT METHOD STATEMENT6 Aug 2013View
4266- Bowland High School - Material Examples_version 1.01_2013.07.pdf23.08.2013 SUPERCEDED MATERIAL EXAMPLES6 Aug 2013View
BOW17_426 Bowland High school Bat Method Statement 15_8_13.pdfBAT LICENCE METHOD STATEMENT21 Aug 2013View
Amended Material Smaples.pdf23/08/2013 AMENDED MATERIAL SAMPLES23 Aug 2013View
Construction method statement 26 08 2013.pdfCONSTRUCTION METHOD STATEMENT2 Sept 2013View
Item 7 committee 04.09.2013 Bowland 03.12.1059.pdfCOMMITTEE REPORT 04 SEPTEMBER 2013 DEVELOPMENT CONTROL COMMITTEE3 Sept 2013View
03.12.1059 Bowland High School Noitce.pdfDECISION NOTICE6 Sept 2013View
Bowland 4266 Existing External Light Photos.pdf19/12/2012 AMENDED 4266 Existing External Light Photos19 Dec 2012View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Committee Date

    Published milestoneCouncil source
  4. Decision Issued Date

    Published milestoneCouncil source

Decision & conditions

Granted
03.12.1059 Bowland High School Noitce.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.