England · County council

Kent County Council
Planning applications.

Explore collected planning applications and decisions for Kent County Council. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
5,036Searchable applications
110Recorded as pending
100%Approval rate · 4,631 approved or refused records
20Refused applications

4,611 approved · 20 refused · 205 withdrawn. Most recent record check: 14 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areasNo boundary records available in this collection
Article 4 direction areasNo boundary records available in this collection

A boundary map is not available for this authority yet. Use council conservation-area and Article 4 guidance above where linked.

Download Article 4 coverage for all authorities (CSV)

Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.

More application records

  1. DeterminedGR/08/138/R12

    Details of building recording pursuant to condition (12) of planning permission GR/08/138 for replacement secondary school

    Northfleet Technology College, Colyer Road, Northfleet, Gravesend, Kent, DA11 8BG

    Received Not published
  2. DeterminedKCC/CA/0032/2015

    Section 73 application to vary condition 11 (hours of usage) of planning permission CA/14/174

    Simon Langton Grammar School For Boys, Simon Langton Grammar School For Boys, Langton Lane, Canterbury, Kent, CT4 7AS

    Received Not published
  3. DeterminedDO/09/259

    Installation of a covered walkway

    The Downs C Of E Primary School, Owen Square, Walmer, Deal, Kent, CT14 7TL

    Received Not published
  4. DeterminedKCC/SW/0026/2017

    Provision of a 4 classroom (10 bay modular unit) incorporating toilets and store rooms. To directly replace 3 number timber framed and clad buildings, that are beyond economical repair

    Speech & Language Centre, Adj Minterne Community Junior School, Minterne Avenue, Sittingbourne, Kent, ME10 1SB

    Received Not published
  5. DeterminedKCC/TW/0318/2011

    Details of all materials to be used externally and Construction Method Statement pursuant to conditions 3 & 20 of planning permission TW/09/1033

    The Skinners School, St Johns Road, Tunbridge Wells, Kent, TN4 9PG

    Received Not published
  6. DeterminedKCC/DO/0047/2023

    New external access ramp and entrance, replacement of the conservatory roofs with solid panels, additional glazing to the ground floor and repairs to curtain walling, roof repairs and louvre screens to new roof level plant and safety enclosure

    Dover Discovery Centre, Market Square, Dover, Kent, CT16 1PH

    Received Not published
  7. DeterminedTM/06/3682/R3

    Details of Landscape Scheme pursuant to condition 3 of planning permission TM/06/3682

    The Judd School, Brook Street, Tonbridge, Kent, TN9 2PN

    Received Not published
  8. DeterminedKCC/TH/0144/2021

    Details of a Construction Management Strategy (Condition 16) and details of a Road Condition Survey of Newlands Lane (Condition 17) pursuant to planning permission TH/18/467

    Foreland Fields School, Newlands Lane, Ramsgate, Kent CT12 6RH

    Received Not published
  9. DeterminedSH/08/1227

    Construction of office extension on rear of existing school building

    St. Martins CE Primary School, Horn Street, Folkestone, Kent, CT20 3JJ

    Received Not published
  10. DeterminedKCC/TW/0253/2013

    Construction of stand alone classroom block of four classrooms with associated facilities. Extension of existing staff room. Construction of new access ramp and steps to existing school

    St James' CEJ School, Sandrock Road, Tunbridge Wells, Kent, TN2 3PR

    Received Not published
  11. DeterminedKCC/SW/0265/2016

    The construction and operation of an Incinerator Bottom Ash (IBA) Recycling Facility on land adjacent to the Kemsley Sustainable Energy Plant

    Kemsley IBA Recycling Facility, Ridham Avenue, Sittingbourne, Kent, ME10 2TD

    Received Not published
  12. WithdrawnKCC/SW/0247/2017

    Redevelopment of an existing waste management facility and inclusion of additional land into a waste management use (part retrospective)

    Land at, and adjacent to, Site D, Oare Creek, Faversham, Kent, ME13 7TX

    Received Not published
  13. DeterminedKCC/TM/0126/2022

    Details of a sustainable surface water drainage scheme (Condition 4), details of an effective outfall for surface water (Condition 5), and details of a Construction Management Plan (Condition 8) pursuant to planning permission TM/22/203

    The Judd School, Brook Street, Tonbridge, Kent TN9 2PN

    Received Not published
  14. DeterminedKCC/DA/0082/2022

    Change of use of industrial yard to create a facility for the collection and distribution of hazardous wastes (including liquid waste oils/petrochemicals, liquid waste coolants, automotive wastes and packaged hazardous wastes); installation of new offices, weighbridge, laboratory, oil storage tanks,...

    Unit 6, Rod End Estate, Northfleet Industrial Estate, Lower Road, Northfleet, Kent DA11 9SN

    Received Not published
  15. DeterminedKCC/AS/0430/2010

    Details pursuant to condition 4 (external materials) of planning permission AS/09/867 for extension, adaptation and alteration of the school building

    Beaver Green Primary School, Cuckoo Lane, Ashford, Kent, TN23 5EA

    Received Not published
  16. DeterminedSE/10/613

    Removal of external fire escape and erection of new 2 storey entrance hall. Construction of single storey lean-to structure incorporating WCs and small music room. Replacement of temporary timber reception classroom with permanent single storey structure. Construction of single storey timber link be...

    St Lawrence CEP School, Stone Street, Seal, Sevenoaks, Kent, TN15 0LN

    Received Not published
  17. DeterminedKCC/DO/0046/2020

    Details of materials pursuant to condition 3 of planning permission DO/19/1120

    Dover Grammar School For Boys, Astor Avenue, Dover, Kent CT17 0DQ

    Received Not published
  18. DeterminedKCC/AS/0031/2021

    Proposed renewal of temporary planning permission for an existing 2 classroom (5 bay) modular unit for a further period of 5 years

    Repton Manor Primary School, Repton Avenue, Ashford, Kent, TN23 3RX

    Received Not published
  19. DeterminedKCC/GR/0228/2023

    Details of the proposed tree and shrub planting to include details of native species and those suitable for bee pollination, size and method of planting pursuant to Condition 10 of planning permission GR/23/0603

    Thamesview School, Thong Lane, Gravesend, Kent DA12 4LF

    Received Not published
  20. DeterminedKCC/SW/0091/2014

    Proposal for a 4 classroom extension, new hall, link corridor, additional toilets, TA room and new playground

    Queenborough Primary School and Nursery, Edward Road, Queenborough, Kent, ME11 5DF

    Received Not published
  21. WithdrawnKCC/TM/0335/2010

    Erection of one solar panel to provide power to control gates at Royal Rise entrance to school property

    Hillview School for Girls, Brionne Gardens, Tonbridge, Kent, TN9 2HE

    Received Not published
  22. DeterminedCA/08/271/R10,13,14,17

    Details of surface water drainage (10), details of below ground excavations (13), details of access, turning & parking (14) and a survey detailing the condition of local roads (17)

    Community College Whitstable, Bellevue Road, Whitstable, Kent, CT5 1PX

    Received Not published
  23. DeterminedKCC/MA/0198/2014

    Proposed demolition of existing sports hall and support facility and the proposed erection of a new sports hall and support facility

    Maidstone Grammar School for Girls, Buckland Road, Maidstone, Kent, ME16 0SF

    Received Not published
  24. DeterminedKCC/MA/0013/2019

    Installation of a barrel-vault canopy (Width: 2.5m Length: 26.5m) to provide a covered walkway at Park Way Primary School. The purpose of the walkway is to link the main school building to a new two classroom modular building to be constructed under Permitted Development

    Park Way Primary School, South Park Road, Maidstone, Kent, ME15 7AH

    Received Not published

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Kent County Council

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Kent County Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage