WithdrawnCouncil status: Withdrawn

Construction of a new rail station consisting of two platforms connected by a pedestrian footbridge with adjoining staircases and two 16-person capacity lift shafts; and associated infrastructure comprising vehicle parking; public announcement system; drainage; security and lighting infrastructure; ...

Land to the north & south of A299 (Hengist Way), including existing railway line and part of the existing A299 (Hengist Way), Cliffsend, Kent (Thanet Parkway Station)

Kent County CouncilReference KCC/TH/0105/2018

Last published check: 22 Oct 2026, 22:35. Check the council record for more recent changes.

Open council website

Status and dates

Last published check: 22 Oct 2026, 22:35 (UK)

  1. Not publishedReceivedNo date on council record
  2. DoneValidated26 Jun 2018
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. ClosedWithdrawnWithdrawn

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (3)
  1. Date Valid

    Published milestoneCouncil source
  2. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  3. Decision Date

    Published milestoneCouncil source
Documents
92 published

Proposal

Construction of a new rail station consisting of two platforms connected by a pedestrian footbridge with adjoining staircases and two 16-person capacity lift shafts; and associated infrastructure comprising vehicle parking; public announcement system; drainage; security and lighting infrastructure; ...

Reference
KCC/TH/0105/2018
Alternative references
KCC/TH/0105/2018
Agent
AECOM Infrastructure & Environment UK Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Agents Covering Letter.pdfApplication Documents7 Jun 2018View
  • Application Form.pdfApplication Documents7 Jun 2018View
  • Design and Access Statement.pdfApplication Documents7 Jun 2018View
  • THPA ACM ZZ ZZ DR SE 00053 P01 Rail and Station General Arrangement Plan Sheet 3 of 6.pdfApplication Documents8 Jun 2018View
  • Public Consultation Report.pdfApplication Documents8 Jun 2018View
  • ES Chapter 9 Appendix 9 A Cultural Heritage Baseline.pdfApplication Documents8 Jun 2018View
  • THPA ACM ZZ ZZ DR HY 00025 P02 Station Access Arrangement Plan Sheet 2.pdfApplication Documents8 Jun 2018View
  • THPA ACM ZZ ZZ DR SE 00063 P01 Footbridge Typical Section.pdfApplication Documents8 Jun 2018View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Withdrawn After Validation
Withdrawn Letter from Applicant dated 5 November 2019.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.