Council planning record

Details of a revised Construction Environment Management Plan (CEMP) (Condition 4); details of the proposed overbridge, roads, footways, footpaths, verges, junctions, street lighting, sewers, drains, retaining structures, service routes, surface water outfall, embankments, visibility splays, accesse...

A249 Grovehurst Road Junction, Sittingbourne, Kent, ME10 2FF

DeterminedReference: KCC/SW/0224/2022Kent County Council

Last published check: 21 Sept 2026, 06:51. Check the council record for more recent changes.

Application location

A249 Grovehurst Road Junction, Sittingbourne, Kent, ME10 2FF

This record has no verified map location.

Application summary

Status
Determined
Application type
Not published
Received
Not published
Validated
5 Jan 2023
Determination deadline
Not published
Local authority
Kent County Council

Application overview

Details of a revised Construction Environment Management Plan (CEMP) (Condition 4); details of the proposed overbridge, roads, footways, footpaths, verges, junctions, street lighting, sewers, drains, retaining structures, service routes, surface water outfall, embankments, visibility splays, accesse...

Proposal details

Reference
KCC/SW/0224/2022
Alternative references
SW/21/505738/RVRB
Agent
Systra Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 212 of 212

DocumentPublishedAction
A249 Grovehurst Road DoC 4 6 9 10 15 Cover Letter.pdfApplication Documents1 Dec 2022View
ApplicationFormRedacted.pdfApplication Documents1 Dec 2022View
New Bridge over the A249 - Structures Options Report.PDFApplication Documents1 Dec 2022View
Geotechnical Design Report - Grovehurst Wing Wall Design.pdfApplication Documents1 Dec 2022View
Geotechnical Design Report - Pile Design for Bridge Foundation.pdfApplication Documents1 Dec 2022View
Archaeological Evaluation Report.pdfApplication Documents1 Dec 2022View
Drainage Strategy & Flood Risk Assessment.pdfApplication Documents1 Dec 2022View
Technical Note - Drainage Strategy Addendum.pdfApplication Documents1 Dec 2022View
Construction Environmental Management Plan - Biodiversity.pdfApplication Documents1 Dec 2022View
Y00025-REP-GEO0010 P01 GDR - Earthworks.pdfApplication Documents5 Jan 2023View
Y00025-REP-GEO0010 P01 GDR - Earthworks Appendix A.pdfApplication Documents5 Jan 2023View
Y00025-REP-GEO0010 P01 GDR - Earthworks Appendix B1.pdfApplication Documents5 Jan 2023View
Y00025-REP-GEO0010 P01 GDR - Earthworks Appendix B2.pdfApplication Documents5 Jan 2023View
Y00025-REP-GEO0010 P01 GDR - Earthworks Appendix B3 1.pdfApplication Documents5 Jan 2023View
Y00025-REP-GEO0010 P01 GDR - Earthworks Appendix B3 2.pdfApplication Documents5 Jan 2023View
Y00025-REP-GEO0010 P01 GDR - Earthworks Appendix B4.pdfApplication Documents5 Jan 2023View
Y00025-REP-GEO0010 P01 GDR - Earthworks Appendix C - Redacted.pdfApplication Documents5 Jan 2023View
Y00025-REP-GEO0010 P01 GDR - Earthworks Appendix D.pdfApplication Documents5 Jan 2023View
Y00025-REP-GEO0010 P01 GDR - Earthworks Appendix E.pdfApplication Documents5 Jan 2023View
Y00025-SPC-GEO0002 P02 - Earthworks and Foundation Performance Specification.pdfApplication Documents5 Jan 2023View
Y00025-SPC-GEO0002 P02 - Earthworks and Foundation Performance Specification Appendix A1 1.pdfApplication Documents5 Jan 2023View
Y00025-SPC-GEO0002 P02 - Earthworks and Foundation Performance Specification Appendix A1 2.pdfApplication Documents5 Jan 2023View
Y00025-SPC-GEO0002 P02 - Earthworks and Foundation Performance Specification Appendix A2.pdfApplication Documents5 Jan 2023View
Y00025-SPC-GEO0002 P02 - Earthworks and Foundation Performance Specification Appendix B.pdfApplication Documents5 Jan 2023View
GB01T22A77 RPT 3000 08 T2 Construction Environmental Management Plan.pdfApplication Documents18 Apr 2023View
Drainage Strategy & Flood Risk Assessment.pdfApplication Documents25 Apr 2023View
Discharge of conditions 4, 6, 9, 10, 15 - Additional Information.pdfApplication Documents25 Apr 2023View
Addendum to the Construction Environmental Management Plan Biodiversity -Management of Non-native invasive species.pdfApplication Documents15 Jun 2023View
109617-TN-500-03 v3 Technical Note - Drainage Strategy Addendum - SUDS Management Plan.pdfApplication Documents6 Jul 2023View
SW Drainage Summary June 2023.pdfApplication Documents6 Jul 2023View
GB01T22A77-TN-500-10 Drainage - IDB Note.pdfApplication Documents6 Jul 2023View
J6_01060 Jackson Fencing - Euroguard Flatform Medium Fencing.pdfApplication Plans & Drawings1 Dec 2022View
J6_04031 Jackson Fencing - Euroguard Flatform Gates.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-100-001 Rev 0 - Information Boards.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-100-002 Rev 0 - Advanced Scheme Boards.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-100-003 Rev 0 - Permit Board.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-100-004 Rev 0 - Business Open Board.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-400-001 Rev 0 - Safety Barrier Post Footings.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-400-002 Rev 0 - Pedestrian Guardrail Vertical Bar Infill.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-500-023 Rev 0 - Junction Box Type 1.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-500-024 Rev 0 - Junction Box Type 2.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-500-025 Rev 0 -- Junction Pit Type 1.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-500-026 Rev 0 - Junction Pit Type 2.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-500-027 Rev 0 - Duct in Footway.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-500-028 Rev 0 - Duct in Carriageway.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-600-002 Rev 0 - Carriageway Widening.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-700-001 Rev 0 - Pavement Interface.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-700-008 Rev 0 - Permanent Reinstatements.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-1100-001 Rev 0 - Kerbs Channels and Edgings.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-1100-004 Rev 0 - Vehicular Crossing.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-1100-005 Rev 0 - Pedestrian Ramps.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-1100-012 Rev 0 - Footway Construction.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-1100-016 Rev 0 - Crossing Layout.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-1100-017 Rev 0 - Refuge Island.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-1100-019 Rev 0 - Vehicle Crossing.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-1100-020 Rev 0 - Reinstatements.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-1200-001 Rev 0 - Concrete Bases.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-1200-002 Rev 0 - Concrete Bases.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-1200-005 Rev 0 - Sign Erection Details.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-1200-007 Rev 0 - Roundabout Signs.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-1200-010 Rev 0 - Maintenance Bay.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-1200-011 Rev 0 - Traffic Signal Controller Cabinet Installation.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-1200-012 Rev 0 - Feeder Pillars.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-1200-013 Rev 0 - Traffic Signal Pole Retention Socket.pdfApplication Plans & Drawings1 Dec 2022View
KCC-HTW-1200-016 Rev 0 - Give Way Markings.pdfApplication Plans & Drawings1 Dec 2022View
Marshalls -TSBB003 - Beany Bridgedeck Std Install.pdfApplication Plans & Drawings1 Dec 2022View
PD-ENGRTR101-Iss-B - N2 Single Sided Flexbeam details.pdfApplication Plans & Drawings1 Dec 2022View
VGAS 3B Standard Arrangement Drawings of M20 Anchorage Unit Type 3.pdfApplication Plans & Drawings1 Dec 2022View
VGSN 1000-04C Standard Arrangement Drawings of VGSN 1000 Series Steel Parapet System.pdfApplication Plans & Drawings1 Dec 2022View
VGSN 1000-09 - Mesh Option 1.pdfApplication Plans & Drawings1 Dec 2022View
VGSN 1000-16B - Tranzflex.pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-001-01_T0 (Location Plan).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-001-02_T0 (GA Overview).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-100-01 to 05_T0 (Existing Layout).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-101-01 to 05_T0 (General Arrangement).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-102-01 to 05_T0 (Contours).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-103-01 to 12_T0 (Visibility Splays).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-103-13 to 18_T0 (Forward and Right Visibility).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-103-19 to 22_T0 (Junction intervisibility).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-104-01 to 07_T0 (Swept Paths).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-105-01 to 08_T1 (Departures and Relaxations).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-107-01_T0 (Bund Cut & Existing Contours).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-108-01 to 05_T0 (Cut & Fill).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-109-01 to 05_T0 (Land Ownership).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-109-06 to 10_T0 (Land Take).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-112-01_T0 (Proposed Speed Limits).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-115-01 to 05_T0 (Future Maintenance).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-200-01 to 05_T1 (Site Clearance).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-300-01 to 05_T0 (Fencing).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-400-01 to 05_T0 (VRS).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-700-01 to 05_T0 (Road Pavements).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-1100-01to05_T1 (Kerbs, Footways & Paved Areas).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-1200-01 to 05_T0 (Signs).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-1201-01 to 05_T0 (Road Markings).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-1203-01 to 05_T0 (TROs).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-2600-01 to 11_T0 (Cross Sections).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-2700-01 to 05_T0 (Existing Utilities).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-2701-01 to 05_T1 (Proposed Utility Diversions).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-2702-01_T0 [Overhead Cable Cross Sections].pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-SD-700-01_T1 (Road Pavement Details).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-RPT-000-01 (Highway Design Report - KCC).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-RPT-400-01 (VRS Risk Assessment).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-RPT-1200-01 (Technical Note on Skidding Resistance).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-RPT-1202-01_D0 (Sign Schedule).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-SCH-105-01 to 03 (Departures and Relaxations Schedule).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-ske-09_T0 (Cross-sections for Earthworks Design).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-ske-34 & 35 (Cross-sections for Earthworks Design).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-ske-2701-01_D2 (Existing Utilities_National Grid).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-ske-2701-02_D2 (Proposed Utility Diversions_Southern Water).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-ske-2701-03_D2 (Proposed Utility Diversions_UKPN).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-ske-2701-04_D2 (Proposed Utility Diversions_BT).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-ske-2701-05_D2 (Proposed Utility Diversions_SGN).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-ske-2701-06_D2 (Proposed Utility Diversions_Virgin Media).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-ske-2701-07_D2 (Proposed Utility Diversions_Combined).pdfApplication Plans & Drawings1 Dec 2022View
2283-DFL-HLG-XX-CA-EO-14001-S3-P01 Lighting & Electrical Details.pdfApplication Plans & Drawings1 Dec 2022View
2283-DFL-HLG-XX-CA-EO-14002-S3-P01 Lighting & Electrical Details.pdfApplication Plans & Drawings1 Dec 2022View
2283-DFL-HLG-XX-DR-EO-13001-S3_P01 Lighting Layout Sheet 1.pdfApplication Plans & Drawings1 Dec 2022View
2283-DFL-HLG-XX-DR-EO-13002-S3_P01 Lighting Layout Sheet 2.pdfApplication Plans & Drawings1 Dec 2022View
2283-DFL-HLG-XX-DR-EO-14001-S3_P01 Duct & Electrical Layout Sheet 1.pdfApplication Plans & Drawings1 Dec 2022View
2283-DFL-HLG-XX-DR-EO-14002-S3_P01 Duct & Electrical Layout Sheet 2.pdfApplication Plans & Drawings1 Dec 2022View
2283-DFL-HLG-XX-SC-EO-14001-S3-P01 Electrical Schematic Sheet 1 of 2.pdfApplication Plans & Drawings1 Dec 2022View
2283-DFL-HLG-XX-SC-EO-14002-S3-P01 Electrical Schematic Sheet 2 of 2.pdfApplication Plans & Drawings1 Dec 2022View
Power to Illuminated Signs - Designers Notes.pdfApplication Plans & Drawings1 Dec 2022View
KCC-ITS-2021-0179-S-0_B (Signals Overview).pdfApplication Plans & Drawings1 Dec 2022View
KCC-ITS-2021-0179-S-1_B (Signals Sheet 1).pdfApplication Plans & Drawings1 Dec 2022View
KCC-ITS-2021-0179-S-1_B (Signals Sheet 2).pdfApplication Plans & Drawings1 Dec 2022View
KCC-ITS-2021-0179-S-1_B (Signals Sheet 3).pdfApplication Plans & Drawings1 Dec 2022View
KCC-ITS-2021-0179-S-1_B (Signals Sheet 4).pdfApplication Plans & Drawings1 Dec 2022View
KCC-ITS-2021-0179-S-1_B (Signals Sheet 5).pdfApplication Plans & Drawings1 Dec 2022View
Traffic Systems General Specification Issue 5.1.pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-SD-1600-010 General Notes & Drawing Register.pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-SD-1600-020 General Arrangement.pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-SD-1600-030 Wingwall Base Slab Setting Out Plan.pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-SD-1600-40 Steelwork (Deck) General Arrangement Sheet 1 of 2.pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-SD-1600-41 Steelwork (Deck) General Arrangement Sections & Details Sheet 2 of 2.pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-SD-1600-080 General Arrangement of Bridge Deck.pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-SD-1600-100 General Arrangement of Wingwalls (North).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-SD-1600-110 General Arrangement of Wingwalls (South).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-SD-1600-170 Construction Sequence (Sheet 1 of 2).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-SD-1600-180 Construction Sequence (Sheet 2 of 2).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-SD-1600-190 General Arrangement of North Abutment Wall.pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-SD-1600-250 - RC Details of Wing Wall (NW1).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-SD-1600-251 - RC Details of Wing Wall (NW2).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-SD-1600-252 - RC Details of Wing Wall (NE1).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-SD-1600-253 - RC Details of Wing Wall (NE2).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-SD-1600-260 - RC Details of Wing Wall (SW1).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-SD-1600-261 - RC Details of Wing Wall (SW2).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-SD-1600-262 - RC Details of Wing Wall (SE1).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-SD-1600-263 - RC Details of Wing Wall (SE2).pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-SD-1600-270 General Arrangement of North Abutment Pilecap.pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-SD-1600-271 General Arrangement of South Abutment Pilecap.pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-dwg-sd-600-01_T0 Standard Details - Typical Earthworks Section.pdfApplication Plans & Drawings1 Dec 2022View
109617-DWG-500-06 Proposed Drainage Rev T1.pdfApplication Plans & Drawings1 Dec 2022View
109617-DWG-500-07 Proposed Drainage Rev T1.pdfApplication Plans & Drawings1 Dec 2022View
109617-DWG-500-08 Proposed Drainage Rev T1.pdfApplication Plans & Drawings1 Dec 2022View
109617-DWG-500-09 Proposed Drainage Rev T1.pdfApplication Plans & Drawings1 Dec 2022View
109617-DWG-500-10 Proposed Drainage Rev T1.pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-511-01-T1 Drainage Standard Details.pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-511-02-T1 Drainage Standard Details.pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-511-03-T1 Drainage Standard Details.pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-511-04-T1 Drainage Standard Details.pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-511-05-T1 Drainage Standard Details.pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-511-06-T1 Drainage Standard Details.pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-3000-01 & 02 rev02 Proposed Landcsape Planting Specification.pdfApplication Plans & Drawings1 Dec 2022View
GB01T22A77-DWG-502-01-T1 Drainage Sections North Sheet 1 of 3.pdfApplication Plans & Drawings25 Apr 2023View
GB01T22A77-DWG-502-02-T1 Drainage Sections North Sheet 2 of 3.pdfApplication Plans & Drawings25 Apr 2023View
GB01T22A77-DWG-502-03-T1 Drainage Sections North Sheet 3 of 3.pdfApplication Plans & Drawings25 Apr 2023View
GB01T22A77-DWG-502-04-T1 Drainage Long Sections Northern-East Sheet 1 of 2.pdfApplication Plans & Drawings25 Apr 2023View
GB01T22A77-DWG-502-05-T1 Drainage Long Sections Northern-East Sheet 2 of 2.pdfApplication Plans & Drawings25 Apr 2023View
GB01T22A77-DWG-502-06-T1 Drainage Long Sections Swaleway Sheet 1 of 2.pdfApplication Plans & Drawings25 Apr 2023View
GB01T22A77-DWG-502-07-T1 Drainage Long Sections Swaleway Sheet 2 of 2.pdfApplication Plans & Drawings25 Apr 2023View
GB01T22A77-DWG-502-08-T1 Drainage Long Sections Sheet 1 of 4.pdfApplication Plans & Drawings25 Apr 2023View
GB01T22A77-DWG-502-09-T1 Drainage Long Sections Sheet 2 of 4.pdfApplication Plans & Drawings25 Apr 2023View
GB01T22A77-DWG-502-10-T1 Drainage Long Sections Sheet 3 of 4.pdfApplication Plans & Drawings25 Apr 2023View
GB01T22A77-DWG-502-11-T1 Drainage Long Sections Sheet 4 of 4.pdfApplication Plans & Drawings25 Apr 2023View
GB01T22A77-DWG-501-01-C0 Attenuation Cross Sections.pdfApplication Plans & Drawings6 Jul 2023View
GB01T22A77-DWG-503-01-C0 Drainage Long Profiles Sheet 1 of 3.pdfApplication Plans & Drawings6 Jul 2023View
GB01T22A77-DWG-503-02-C0 Drainage Long Profiles Sheet 2 of 3.pdfApplication Plans & Drawings6 Jul 2023View
GB01T22A77-DWG-503-03-C0 Drainage Long Profiles Sheet 3 of 3.pdfApplication Plans & Drawings6 Jul 2023View
GB01T22A77-DWG-504-01-C0 Drainage Long Profiles Sheet 1 of 9.pdfApplication Plans & Drawings6 Jul 2023View
GB01T22A77-DWG-504-02-C0 Drainage Long Profiles Sheet 2 of 9.pdfApplication Plans & Drawings6 Jul 2023View
GB01T22A77-DWG-504-03-C0 Drainage Long Profiles Sheet 3 of 9.pdfApplication Plans & Drawings6 Jul 2023View
GB01T22A77-DWG-504-04-C0 Drainage Long Profiles Sheet 4 of 9.pdfApplication Plans & Drawings6 Jul 2023View
GB01T22A77-DWG-504-05-C0 Drainage Long Profiles Sheet 5 of 9.pdfApplication Plans & Drawings6 Jul 2023View
GB01T22A77-DWG-504-06-C0 Drainage Long Profiles Sheet 6 of 9.pdfApplication Plans & Drawings6 Jul 2023View
GB01T22A77-DWG-504-07-C0 Drainage Long Profiles Sheet 7 of 9.pdfApplication Plans & Drawings6 Jul 2023View
GB01T22A77-DWG-504-08-C0 Drainage Long Profiles Sheet 8 of 9.pdfApplication Plans & Drawings6 Jul 2023View
GB01T22A77-DWG-504-09-C0 Drainage Long Profiles Sheet 9 of 9.pdfApplication Plans & Drawings6 Jul 2023View
GB01T22A77-DWG-511-02-C0 Drainage Construction Details Sheet 2 of 6.pdfApplication Plans & Drawings6 Jul 2023View
GB01T22A77-DWG-511-04-C0 Drainage Construction Details Sheet 4 of 6.pdfApplication Plans & Drawings6 Jul 2023View
GB01T22A77-DWG-511-05-C0 Drainage Construction Details Sheet 5 of 6.pdfApplication Plans & Drawings6 Jul 2023View
GB01T22A77-DWG-511-06-C0 Drainage Construction Details Sheet 6 of 6.pdfApplication Plans & Drawings6 Jul 2023View
GB01T22A77-DWG-512-01-C0 Drainage Construction Details Sheet 1 of 2.pdfApplication Plans & Drawings6 Jul 2023View
GB01T22A77-DWG-512-02-C0 Drainage Construction Details Sheet 2 of 2.pdfApplication Plans & Drawings6 Jul 2023View
GB01T22A77-DWG-512-01-C0 Drainage Standard Details NH.pdfApplication Plans & Drawings6 Jul 2023View
KCC-HTW-500-001 Rev 0 Precast Concrete Circular Chamber Types 1 & 2.pdfApplication Plans & Drawings6 Jul 2023View
KCC-HTW-500-002 Rev 0 Precast Concrete Circular Chamber Types 3 & 4.pdfApplication Plans & Drawings6 Jul 2023View
KCC-HTW-500-009 Rev 0 Precast Gully.pdfApplication Plans & Drawings6 Jul 2023View
KCC-HTW-500-031 Rev 0 SUDS Detail.pdfApplication Plans & Drawings6 Jul 2023View
KCC-HTW-500-051 Rev 0 Pipe Details.pdfApplication Plans & Drawings6 Jul 2023View
GB01T22A77-DWG-511-03-C1 Drainage Standard Details.pdfApplication Plans & Drawings3 Oct 2023View
109617-DWG-500-06-C2 Proposed Drainage Layout.pdfApplication Plans & Drawings3 Oct 2023View
109617-DWG-500-07-C1 Proposed Drainage Layout.pdfApplication Plans & Drawings3 Oct 2023View
109617-DWG-500-08-C2 Proposed Drainage Layout.pdfApplication Plans & Drawings3 Oct 2023View
109617-DWG-500-09-C1 Proposed Drainage Layout.pdfApplication Plans & Drawings3 Oct 2023View
109617-DWG-500-10-C1 Proposed Drainage Layout.pdfApplication Plans & Drawings3 Oct 2023View
109617-SCH-500-01 Drainage Schedule C3.pdfApplication Plans & Drawings3 Oct 2023View
230809 Drainage Network North v9A Results 09-08-2023.pdfApplication Plans & Drawings3 Oct 2023View
230809 Drainage Network North-East v9A Results 09-08-2023.pdfApplication Plans & Drawings3 Oct 2023View
230809 Drainage Network Swale Way v9A Results 09-08-2023.pdfApplication Plans & Drawings3 Oct 2023View
Drainage check for increased M5-60 Aug2023.pdfApplication Plans & Drawings3 Oct 2023View
SW 21 505738 RVRB Decision notice.pdfDecision23 Oct 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Valid

    Published milestoneCouncil source
  2. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  3. Decision Date

    Published milestoneCouncil source

Decision & conditions

Details Approved
SW 21 505738 RVRB Decision notice.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.