ApprovedCouncil status: Determined

Proposed new electric substation and switchgear enclosure; provision of a new gate within the existing boundary wall to provide a vehicular access to the substation; relocation of existing pedestrian gate and relocation and replacement of the guard rail between the pedestrian access and the road

Mayfield Grammar School, Pelham Road, Gravesend, Kent, DA11 0JE

Kent County CouncilReference KCC/GR/0102/2018

Last published check: 22 Oct 2026, 22:46. Check the council record for more recent changes.

Status and dates

Last published check: 22 Oct 2026, 22:46 (UK)

  1. Not publishedReceivedNo date on council record
  2. DoneValidated12 Jun 2018
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedGranted with Conditions23 Aug 2018

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (3)
  1. Date Valid

    Published milestoneCouncil source
  2. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  3. Decision Date

    Published milestoneCouncil source
Documents
9 published

Proposal

Proposed new electric substation and switchgear enclosure; provision of a new gate within the existing boundary wall to provide a vehicular access to the substation; relocation of existing pedestrian gate and relocation and replacement of the guard rail between the pedestrian access and the road

Reference
KCC/GR/0102/2018
Alternative references
GR/18/681
Agent
Bailey Partnership

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Supporting Statement (2).pdfApplication Documents13 Jun 2018View
  • Application form (2).pdfApplication Documents13 Jun 2018View
  • MGS-BPC-XX-XX-DR-A-050004_P1 Site Plan Electric Substation & New Gates in existing wall.pdfApplication Plans & Drawings17 Aug 2018View
  • MGS BPC XX XX DR A 050001 P1 Site Plan New Electric Substation and Switchgear Enclosure.pdfApplication Plans & Drawings13 Jun 2018View
  • MGS BPC XX XX DR A 050003 P1 Block Plan New Electric Substation and Switchgear Enclosure.pdfApplication Plans & Drawings13 Jun 2018View
  • MGS BPC XX XX DR A 050002 P1 Layout Plan Section and Elevations New Electric Substation and Switchgear Enclosure.pdfApplication Plans & Drawings13 Jun 2018View
  • DECISION NOTICE_KCC-GR-0102-2018(6)(1).pdfDecision23 Aug 2018View
  • SITE NOTICE_KCC-GR-0102-2018.docPublicity22 Jun 2018View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Granted with Conditions
DECISION NOTICE_KCC-GR-0102-2018(6)(1).pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.