Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Land adjacent to Oakwood and at Bungalow Yard, Watling Street, Bean, Dartford, Kent, DA2 8AH
Last published check: 21 Sept 2026, 06:49. Check the council record for more recent changes.
Land adjacent to Oakwood and at Bungalow Yard, Watling Street, Bean, Dartford, Kent, DA2 8AH
This record has no verified map location.
Erection of a storage building with mezzanine floor to facilitate a change of use from trailer and vehicle parking (sui generis) to clinical waste transfer station (sui generis) at Bungalow Yard together with change of use from clinical waste transfer station (sui generis) to trailer and vehicle par...
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Community Infrastructure Levy - Additional Information.pdfApplication Documents | 6 Dec 2022 | View |
| Arboricultural Survey - Redacted.pdfApplication Documents | 6 Dec 2022 | View |
| Archaeological Desk Based Assessment (SWAT).pdfApplication Documents | 6 Dec 2022 | View |
| Contaminated Land Desk Study and Appendix A - Redacted.pdfApplication Documents | 6 Dec 2022 | View |
| Contaminated Land Desk Study Appendix B.pdfApplication Documents | 6 Dec 2022 | View |
| Hydrogeological Risk Assessment to Inform a Sustainable Drainage Strategy.pdfApplication Documents | 6 Dec 2022 | View |
| Noise and Air Quality Quantative Statement.pdfApplication Documents | 6 Dec 2022 | View |
| Visual Impact Assessment.pdfApplication Documents | 6 Dec 2022 | View |
| Visual Impact Assessment Appendix 1 - Photograph Map.pdfApplication Documents | 6 Dec 2022 | View |
| Visual Impact Assessment Appendix 2 - Photos.pdfApplication Documents | 6 Dec 2022 | View |
| Transport Statement (LBA).pdfApplication Documents | 7 Dec 2022 | View |
| Transport Statement (LBA) Appendices.pdfApplication Documents | 7 Dec 2022 | View |
| Email from Agent dated 6 Jan 2023 re Revised Details.pdfApplication Documents | 6 Jan 2023 | View |
| Application Form - Redacted.pdfApplication Documents | 6 Jan 2023 | View |
| Planning Design and Access Statement.pdfApplication Documents | 6 Jan 2023 | View |
| Consultation Drainage Response (ECL)_Redacted.pdfApplication Documents | 7 Mar 2023 | View |
| Consultation Highways Authority Response (LBA)_Redacted.pdfApplication Documents | 7 Mar 2023 | View |
| Consultation Highways Authority Response (LBA) Appendices.pdfApplication Documents | 7 Mar 2023 | View |
| Response to Consultations (GSP).pdfApplication Documents | 7 Mar 2023 | View |
| Planning Design and Access Statement Addendum (GSP).pdfApplication Documents | 7 Sept 2023 | View |
| Drainage Surface Water Calculations (ECL) - Redacted.pdfApplication Documents | 7 Sept 2023 | View |
| Ecological Phase II Botanical Walkover File Note (Arbtech) - Redacted.pdfApplication Documents | 7 Sept 2023 | View |
| Preliminary Appraisal UPDATED (ArbTech) - Redacted.pdfApplication Documents | 7 Sept 2023 | View |
| Tolvik Full Report 2018 - Residual Waste in London and the South East - Redacted.pdfApplication Documents | 7 Sept 2023 | View |
| Transport Highway Road Safety Audit Stage 1 (LBA) - Redacted.pdfApplication Documents | 7 Sept 2023 | View |
| Transport Technical Note Update (LBA) - Redacted.pdfApplication Documents | 7 Sept 2023 | View |
| Transport Technical Note Update (LBA) Appendices.pdfApplication Documents | 7 Sept 2023 | View |
| Arboricultural Method Statement (Arbtech) - Redacted.pdfApplication Documents | 14 Sept 2023 | View |
| Arbtech AIA 02 Arboricultural Impact Assessment (Arbtech).pdfApplication Documents | 14 Sept 2023 | View |
| Arbtech TPP 02 Arboricultural Tree Protection Plan (Arbtech).pdfApplication Documents | 14 Sept 2023 | View |
| 01 Site Location Plan.pdfApplication Plans & Drawings | 6 Dec 2022 | View |
| 02 Existing Block Plan.pdfApplication Plans & Drawings | 29 Nov 2022 | View |
| 03 Existing Elevations Outline.pdfApplication Plans & Drawings | 6 Dec 2022 | View |
| 08 Oakwood Existing Block Plan.pdfApplication Plans & Drawings | 6 Dec 2022 | View |
| 09 Oakwood Proposed Block Plan.pdfApplication Plans & Drawings | 6 Dec 2022 | View |
| 25B Proposed Roof Plan.pdfApplication Plans & Drawings | 6 Dec 2022 | View |
| 04 C Proposed Block Plan.pdfApplication Plans & Drawings | 7 Sept 2023 | View |
| 05 C Proposed Floor Plan.pdfApplication Plans & Drawings | 7 Sept 2023 | View |
| 06 C Proposed Elevations 1 of 2.pdfApplication Plans & Drawings | 7 Sept 2023 | View |
| 07A Proposed Elevations 2 of 2.pdfApplication Plans & Drawings | 7 Sept 2023 | View |
| 10A Proposed Mezzanine Plan.pdfApplication Plans & Drawings | 7 Sept 2023 | View |
| 11 Proposed Overlay Block Plan.pdfApplication Plans & Drawings | 7 Sept 2023 | View |
| Delegated report EDC.23.0007.pdfDecision | 30 Nov 2023 | View |
| EDC 23 0007 Decision notice(1).pdfDecision | 30 Nov 2023 | View |
| Advert - Published.pdfPublicity | 26 Jan 2023 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.