TG1; Bay group: Remove all smaller-diameter stems growing on top of the wall as far back as the boundary wooden panel fence north. Smaller stems manage as coppice and retain the more established upright trunks further back from the wall on the neighbouring boundary fenceline. T2; Bay tree: reduced in height by 40% to the points it previously has been reduced to. T3, Muli stem bay: remove three stems interfering with the house and making contact with the roof. T4; Beech: Re-coppice at the low level where the two main stems converge, to be retained and managed as low-level screening. T5; Strawberry tree: prune to allow space for adjacent greengage. T6; Holm oak: This is a pollard tree at the height it has previously been reduced to, continuing this pollard form throughout the lower branches.
TG1; Bay group: Remove all smaller-diameter stems growing on top of the wall as far back as the boundary wooden panel fence north. Smaller stems manage as coppice and retain the more established upright trunks further back from the wall on the neighbouring boundary fenceline. T2; Bay tree: reduced in height by 40% to the points it previously has been reduced to. T3, Muli stem bay: remove three stems interfering with the house and making contact with the roof. T4; Beech: Re-coppice at the low level where the two main stems converge, to be retained and managed as low-level screening. T5; Strawberry tree: prune to allow space for adjacent greengage. T6; Holm oak: This is a pollard tree at the height it has previously been reduced to, continuing this pollard form throughout the lower branches.
Reference
25/00137/TW
Alternative references
PP-13734196
Ward
Shanklin South
Parish
Shanklin
Agent
Greenscapes Garden and Land Mangement Ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.