Council planning record

**5 DAY NOTICE**Beech tree - T1 Beech - remove the large primary stem extending to the North and bifurcating at approx. 3 metres above ground level. The remaining crown is to have the top reduced by 4 to 5 metres from the highest point in the central leader down to strong growth points. The sides of the crown are to be reduced by 2 to 3 metres from the tips also to strong growth points leaving at least 2 to three bifurcations from the pruning point back into the crown enabling the retention of as much potential foliage as possible. This should leave the tree with a smaller crown at lower formed crown better able to manage high winds. A rough indication is attached in the annotated picture attached to this consent.All reductions points are to be to strong growth point that are at least one third the diameter of the adjacent pruning point. This being in line with BS 3998 standard. Amended description

Farringford Cottage Bedbury Lane Freshwater Isle Of Wight PO40 9PB

UnknownReference: 24/00579/TWIsle of Wight Council

Application location

Farringford Cottage Bedbury Lane Freshwater Isle Of Wight PO40 9PB

This record has no verified map location.

View council map

Application summary

Status
Unknown
Application type
Tree Works in Conservation Area
Received
15 Apr 2024
Validated
15 Apr 2024
Determination deadline
Not published
Local authority
Isle of Wight Council

Application overview

**5 DAY NOTICE**Beech tree - T1 Beech - remove the large primary stem extending to the North and bifurcating at approx. 3 metres above ground level. The remaining crown is to have the top reduced by 4 to 5 metres from the highest point in the central leader down to strong growth points. The sides of the crown are to be reduced by 2 to 3 metres from the tips also to strong growth points leaving at least 2 to three bifurcations from the pruning point back into the crown enabling the retention of as much potential foliage as possible. This should leave the tree with a smaller crown at lower formed crown better able to manage high winds. A rough indication is attached in the annotated picture attached to this consent.All reductions points are to be to strong growth point that are at least one third the diameter of the adjacent pruning point. This being in line with BS 3998 standard. Amended description

Proposal details

Reference
24/00579/TW
Alternative references
PP-12973830
Ward
Freshwater South
Parish
Freshwater

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 7 of 7

DocumentPublishedAction
TREE WORKS DECISION NOTICE APPROVALDecision Notice · PDF17 Apr 2024View
ReportsReports · PDF17 Apr 2024View
APPLICATIONFORMREDACTEDApplication Form - Public Copy · PDF15 Apr 2024View
PHOTOSSupporting Information15 Apr 2024View
PHOTOSSupporting Information15 Apr 2024View
PHOTOSSupporting Information15 Apr 2024View
LOCATION PLANPlan - Location15 Apr 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Statutory Decision Date

    Published milestoneCouncil source

Decision & conditions

No Objection
TREE WORKS DECISION NOTICE APPROVAL
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.