T1; Copper Beech situated as detailed in the application is to have the following work carried out: The trees crown is to be reduced from the church to achieve a 2m clearance of the gutter line of the wall facing the tree. The lowest branch extending towards the seating area of the garden below to be removed and the remaining crown over this area to be reduced by approximately 1-2m. The whole crown raised to 4m above ground level and reduced away from the vicarage to achieve a 3m clearance from the building. The remaining crown to be thinned by approximately 20% incorporating a crown clean.Prior to the work commencing a site meeting will be had with the operatives who are to carry out the work to discuss the planned operation.
St Thomas Of Canterbury Presbytery 96 Pyle Street Newport Isle Of Wight PO30 1UH
T1; Copper Beech situated as detailed in the application is to have the following work carried out: The trees crown is to be reduced from the church to achieve a 2m clearance of the gutter line of the wall facing the tree. The lowest branch extending towards the seating area of the garden below to be removed and the remaining crown over this area to be reduced by approximately 1-2m. The whole crown raised to 4m above ground level and reduced away from the vicarage to achieve a 3m clearance from the building. The remaining crown to be thinned by approximately 20% incorporating a crown clean.Prior to the work commencing a site meeting will be had with the operatives who are to carry out the work to discuss the planned operation.
Reference
20/02273/TW
Alternative references
PP-09379007
Ward
Newport Central
Parish
Newport & Carisbrooke Community Council
Agent
Les Burden Grounds Maintenance
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.