Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Wales · Local authority
Explore collected planning applications and decisions for Isle of Anglesey County Council. Search an address, application reference or proposal to find a record.
3,378 approved · 261 refused · 253 withdrawn. Received dates in our records: 31 Mar 2009 to 2 Oct 2026. Most recent record check: 12 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Welsh Government / DataMapWales. Contains public sector information licensed under the Open Government Licence v3.0.
Plot C7, Parc Cybi, Caergybi / Holyhead
Received 16 Mar 2022Pen Lon Quirt, Dwyran
Received 16 Mar 2022Tyddyn Berllan, Llanerchymedd
Received 25 Feb 2022Glan Hafren, Llantrisant
Received 25 Feb 2022The Old Court House, Lon Cei Bont, Porthaethwy / The Old Court House, Beach Road, Menai Bridge
Received 25 Feb 2022Dinas Bach, 5 Ystad y Fron, Aberffraw
Received 16 Mar 2022Glan Y Don, Ffordd Cynan/St George's Road, Porthaethwy/Menai Bridge
Received 16 Mar 20221 Parc Gwyddoniaeth Menai, Lon Graig, Gaerwen
Received 17 Mar 20221 Lon Gamfa , Porthaethwy/Menai Bridge
Received 17 Mar 20226 Stanley Avenue, Y Fali / Valley
Received 17 Mar 2022Llanfair Farm, Dwyran
Received 18 Mar 2022Haulfryn, 27 Cae Mair, Biwmares/Beaumaris
Received 18 Mar 2022Rhyd y Bont, Four Mile Bridge.
Received 18 Mar 2022Morven, Lon Goch, Amlwch
Received 28 Feb 202226 Ystad Nant Bychan, Moelfre / 26 Nant Bychan Estate, Moelfre
Received 28 Feb 2022Castellor, Cemaes
Received 28 Feb 2022Long Mynd, Ravenspoint Road, Bae Trearddur / Trearddur Bay
Received 28 Feb 2022Bryn Allgo, Moelfre
Received 28 Feb 20222 Cefn Rhosydd, Lon Dalar, Bodedern
Received 28 Feb 2022Bryniau Mawr, Allt Bron Philip, Llanddona
Received 1 Mar 2022Old Bon Marche, Rhosneigr
Received 1 Mar 2022Ocean's Edge, Lon Isallt, Bae Treaddur Bay
Received 1 Mar 20224 Marine Terrace, Stryd Fawr/High Street, Rhosneigr
Received 21 Mar 2022Pen y Maen, Fron Deg, Llandegfan
Received 21 Mar 2022Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Wales differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Isle of Anglesey County Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage