Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Wales · Local authority
Explore collected planning applications and decisions for Isle of Anglesey County Council. Search an address, application reference or proposal to find a record.
3,378 approved · 261 refused · 253 withdrawn. Received dates in our records: 31 Mar 2009 to 2 Oct 2026. Most recent record check: 10 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Welsh Government / DataMapWales. Contains public sector information licensed under the Open Government Licence v3.0.
Trigfa, Ffordd Bangor Road, Benllech
Received 3 Aug 2021Bryn Tirion Isaf, Talwrn
Received 3 Aug 2021Bwthyn Lleiniog, Penmon, Biwmares / Lleiniog Cottage, Penmon, Beaumaris
Received 4 Aug 2021Morglawdd / Ynys Halen, Caergybi / Breakwater / Salt Island, Holyhead
Received 4 Aug 2021Mount View, Warren Road, Rhosneigr
Received 4 Aug 2021Hafod Y Plas, Four Mile Bridge
Received 5 Aug 2021Hafod y Plas, Pontrhydybont/Fourmile Bridge
Received 5 Aug 2021Hafod y Plas, Pontrhydybont/Fourmile Bridge
Received 6 Aug 2021Neuadd, Cemlyn, Cemaes
Received 6 Aug 2021Pont Crug Uchaf, Llanddaniel
Received 5 Aug 2021Penybont, Valley
Received 6 Aug 2021Yr Hen Ficerdy, Llanddaniel
Received 9 Aug 2021Outbuilding 1, Lleiniog, Penmon
Received 9 Aug 2021Bodafon, Lon Refail, Llanfairpwll
Received 13 Apr 2022Ty Crochan, Llwyn Onn, Llanedwen
Received 13 Apr 202214 Stryd Fawr/High Street, Llangefni
Received 14 Apr 2022Y Stablau, Lon St Ffraid ,Bae Trearddur Bay
Received 14 Apr 2022The Walled Garden, Stâd Ravens Point, Bae Trearddur / The Walled Garden, Ravens Point Estate, Trearddur Bay
Received 14 Apr 2022Communications Apparatus, Brynrefail
Received 9 Aug 20214 Lon y Gamfa, Porthaethwy / Menai Bridge
Received 6 Aug 2021Tyddyn Du, Y Fali / Valley
Received 10 Aug 2021Cae Llwyd, Rhydwyn
Received 8 Nov 2022Parc Gwyliau Plas Coch / Plas Coch Holiday Park, Llanedwen
Received 8 Nov 2022Twyn Haf, Lon Penrhyngarw, Bae Trearddur / Trearddur Bay
Received 8 Nov 2022Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Wales differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Isle of Anglesey County Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage