Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Wales · Local authority
Explore collected planning applications and decisions for Isle of Anglesey County Council. Search an address, application reference or proposal to find a record.
3,378 approved · 261 refused · 253 withdrawn. Received dates in our records: 31 Mar 2009 to 2 Oct 2026. Most recent record check: 10 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Welsh Government / DataMapWales. Contains public sector information licensed under the Open Government Licence v3.0.
Glan Y Gors, Pencarnisiog
Received 25 Aug 2021Gwenallt, Llansadwrn
Received 17 Sept 2021Glan Aber, Llanfairpwllgwyngyll
Received 25 Aug 20218 Lon Cei Bont, Porthaethwy / 8 Beach Road, Menai Bridge
Received 16 Sept 2021Coleg Menai, Llangefni
Received 16 Sept 2021Coleg Menai, Ffordd y Coleg, Llangefni
Received 16 Sept 2021Bryn Ednyfed, Holyhead Road, Caergeiliog
Received 17 Sept 2021Lon Newydd / Bridge Street, Llangefni
Received 16 Sept 2021Cwm Derri, Dulas
Received 16 Sept 2021Lark Rise, Ffordd Penclip, Porthaethwy / Lark Rise, Druid Road, Menai Bridge
Received 26 Aug 2021Gwydryn Newydd, Llanfairpwll
Received 26 Aug 2021Bloc E/Block E, Stad Diwydiannol Penrhos Industrial Estate, Caergybi/Holyhead
Received 26 Aug 2021Parc Carafan Plas Uchaf Caravan Park, Tyn Y Gongl
Received 26 Aug 2021Cefn Mawr Uchaf , Llangaffo
Received 25 Aug 2021Llwyn Onn, Tyn Lon
Received 26 Aug 2021The Old Pottery, Lon Paran Lane, Rhosneigr
Received 26 Aug 2021Cae Llwyd, Ffordd Porth Y Felin Road, Caergybi/Holyhead
Received 20 Sept 2021Deck, Carreglefn
Received 27 Aug 2021Erw Fawr, Llanynghenedl
Received 27 Aug 2021Yr Hen Efail, Lon Capel, Dwyran
Received 27 Aug 2021Craig Beuno, Ffordd Cildwrn, Llangefni / Craig Beuno, Cildwrn Road, Llangefni
Received 27 Aug 2021Coleg Menai, Llangefni
Received 27 Aug 202123 Ty'n Berllan, Bryngwran
Received 20 Sept 2021White Cottage, Lon Traeth Llydan, Rhosneigr
Received 20 Sept 2021Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Wales differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Isle of Anglesey County Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage