Council planning record

Discharge of conditions relating to approval 19/00572/FULL.

Hull Maritime Museum Queen Victoria Square Kingston Upon Hull HU1 3DX

UnknownReference: 21/01718/CONDETHull City Council

Last published check: 10 Oct 2026, 00:47. Check the council record for more recent changes.

Application location

Hull Maritime Museum Queen Victoria Square Kingston Upon Hull HU1 3DX

This record has no verified map location.

View council map

Application summary

Status
Unknown
Application type
Discharge of condtions
Received
17 Dec 2021
Validated
17 Dec 2021
Determination deadline
Not published
Local authority
Hull City Council

Application overview

Discharge of conditions relating to approval 19/00572/FULL.

Proposal details

Reference
21/01718/CONDET
Alternative references
PP-10464433
Ward
St Andrews And Dockland
Agent
Purcell

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 119 of 119

DocumentPublishedAction
DECISION NOTICEDecision25 Sept 2023View
CYCLE SHELTERDrawing · PDF22 Aug 2023View
PROPOSED GROUND FLOOR PLANDrawing · PDF22 Aug 2023View
EMAIL FROM AGENTCorrespondence · PDF22 Aug 2023View
FLOOD RESILIANCEReport · PDF22 Aug 2023View
EMAIL FROM CONSERVATIONCorrespondence · PDF22 Aug 2023View
EMAIL FROM AGENTCorrespondence · PDF22 Aug 2023View
CYCLE HOOPSDrawing · PDF22 Aug 2023View
EMAIL FROM AGENTCorrespondence · PDF22 Aug 2023View
GAS SOLENOID VALVESDrawing · PDF17 Dec 2021View
THERMOSTATIC MIXING VALVES EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
EXTRACT GRILLE EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
EXTERNAL LOUVRES EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
ELECTRIC WATER HEATERS EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
TRACE HEATING EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
WATER HEATER EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
SUPPLY FANS EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
CHILLER EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
ELECTRIC RANEL HEATERS EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
SHOWER MIXING VALVES EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
CWS SOLENOID VALVES EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
PRESSURE INDEPEDNDENT CONTROL VALVES EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
GAS SUB METERS EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
PRESSURE REDUCING VALVES EQUIPMNT SCHEDULEDrawing · PDF17 Dec 2021View
MOTORISED DAMPER SCHEDULE EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
DOR TRANSFER GRILLE SCHEDULE EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
FOIL CAN UNITS EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
MOTORISED COILS EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
DE-HUMIDIFIERS EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
DIFFERENTIAL PRESSURE CONTROL VALVES EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
PLAN SCHEDULEDrawing · PDF17 Dec 2021View
AIR HANDLING UNITS EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
SCHEDULEDrawing · PDF17 Dec 2021View
GROUND FLOOR PLAN AS EXISTINGDrawing · PDF17 Dec 2021View
A SUMMARY OF THE ATTACHMENTS IN THE PROPOSALBackGround Papers · PDF17 Dec 2021View
APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form · PDF17 Dec 2021View
COVERING LETTEROther · PDF17 Dec 2021View
COURTROOM VENTILATOR DIFFUSER DETAILDrawing · PDF17 Dec 2021View
GROUND FLOOR PROPOSEDDrawing · PDF17 Dec 2021View
CAFE ALTERATIONS AND DETAILSDrawing · PDF17 Dec 2021View
PROPOSED GENERAL AND EMERGENCY LIGHTINGDrawing · PDF17 Dec 2021View
SMALL POWER AND DATA LAYOUTDrawing · PDF17 Dec 2021View
PROPOSED FIRE ALARM GROUND FLOORDrawing · PDF17 Dec 2021View
SECURITY GROUND FLOORDrawing · PDF17 Dec 2021View
PROPOSED DISTRIBUTION STRATEGY GROUND FLOORDrawing · PDF17 Dec 2021View
SMALL POWER AND DATA LAYOUT FIRST FLOORDrawing · PDF17 Dec 2021View
GENERAL AND EMERGENCY LIGHTING FIRST FLOORDrawing · PDF17 Dec 2021View
PROPOSED DISTRIBUTION STRATEGY FIRST FLOORDrawing · PDF17 Dec 2021View
PROPOSED DISTRIBUTION STRATEGY FIRST FLOORDrawing · PDF17 Dec 2021View
SECURITY FIRST FLOORDrawing · PDF17 Dec 2021View
PROPOSED FIRE ALARM FIRST FLOORDrawing · PDF17 Dec 2021View
PROPOSED DISTRIBUTION STRATEGY FIRST FLOORDrawing · PDF17 Dec 2021View
PROPOSED DISTRIBUTION STRATEGY SECOND FLOORDrawing · PDF17 Dec 2021View
PROPOSED DISTRIUBTION STRATEGY SECOND FLOORDrawing · PDF17 Dec 2021View
GENERAL AND EMERGENCY LIGHTING SECOND FLOORDrawing · PDF17 Dec 2021View
SMALL POWER AND DATA LAYOUT SECOND FLOORDrawing · PDF17 Dec 2021View
SECURITY SECOND FLOORDrawing · PDF17 Dec 2021View
LIGHTING BASEMENTDrawing · PDF17 Dec 2021View
PROPOSED FIRE ALARM SECOND FLOORDrawing · PDF17 Dec 2021View
SMALL POWER AND DATA LAYOUT BASEMENTDrawing · PDF17 Dec 2021View
DISTRIBUTION STRATEGY THIRD FLOORDrawing · PDF17 Dec 2021View
SECURITY BASEMENTDrawing · PDF17 Dec 2021View
PROPOSED FIRE ALARM BASEMENTDrawing · PDF17 Dec 2021View
ABOVE GROUND DRAINAGE LAYOUT FIRST FLOORDrawing · PDF17 Dec 2021View
DOMESTIC WATER SERVICES LAYOUT FIRST FLOORDrawing · PDF17 Dec 2021View
DOMESTIC WATER SERVICES LAYOUT GROUND FLOORDrawing · PDF17 Dec 2021View
ABOVE GROUND DRAINAGE LAYOUT GROUND FLOORDrawing · PDF17 Dec 2021View
VENTILATION LAYOUT GROUND FLOORDrawing · PDF17 Dec 2021View
HEATING LAYOUT GROUND FLOORDrawing · PDF17 Dec 2021View
VENTILATION LAYOUT FIRST FLOORDrawing · PDF17 Dec 2021View
ABOVE GROUND DRAINAGE LAYOUT SECOND FLOORDrawing · PDF17 Dec 2021View
DOMESTIC WATER SERVICES LAYOUT BASEMENTDrawing · PDF17 Dec 2021View
HEATING LAYOUT FIRST FLOORDrawing · PDF17 Dec 2021View
DOMESTIC WATER SERVICES LAYOUT SECOND FLOORDrawing · PDF17 Dec 2021View
VENTILATION LAYOUT SECOND FLOORDrawing · PDF17 Dec 2021View
HEATING LAYOUT SECOND FLOORDrawing · PDF17 Dec 2021View
ABOVE GROUND DRAINAGE LAYOUT BASEMENTDrawing · PDF17 Dec 2021View
GAS LAYOUT BASEMENT LEVELDrawing · PDF17 Dec 2021View
VENTILATION LAYOUT BASEMENT LEVELDrawing · PDF17 Dec 2021View
PROPOSEDCHILLED WATER LAYOUT BASEMENT LEVELDrawing · PDF17 Dec 2021View
ABOVE GROUND LEVEL DRAINAGE LAYOUT ROOF LEVELDrawing · PDF17 Dec 2021View
HEATING LAYOUT BASEMENT LEVELDrawing · PDF17 Dec 2021View
DOMESTIC WATER SERVICES LAYOUT DOME LEVELDrawing · PDF17 Dec 2021View
HEATING LAYOUT DOME LEVELDrawing · PDF17 Dec 2021View
CONTROL PANEL SCHEMATICDrawing · PDF17 Dec 2021View
VENTILATION LAYOUT ROOF LEVELDrawing · PDF17 Dec 2021View
BOILER PLANTROOM LAYOUT BASEMENT LEVELDrawing · PDF17 Dec 2021View
ABOVE GROUND DRAINAGE SCHEMATICDrawing · PDF17 Dec 2021View
GAS SERVICES SCHEMATICDrawing · PDF17 Dec 2021View
CHILLED WATER SCHEMATICDrawing · PDF17 Dec 2021View
HOT AND COLD WATER SCHEMATIC 2 OF 2Drawing · PDF17 Dec 2021View
HTLW SCHEMATIC 3 OF 3Drawing · PDF17 Dec 2021View
HTLW SCHEMATIC 2 OF 3Drawing · PDF17 Dec 2021View
LHTWR SCHEMATIC 1 OF 3Drawing · PDF17 Dec 2021View
HOT AND COLD WATER SCEHAMTIC 2 OF 3Drawing · PDF17 Dec 2021View
VENTILTION SCHEMATIC 3 OF 6Drawing · PDF17 Dec 2021View
VENTILATION SCHEMATIC 4 OF 6Drawing · PDF17 Dec 2021View
DOOR AIR CURTAINS EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
SUPPLY DIFFUSER EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
FABRIC DUCTWORK EQUIPMENT UPDATEDrawing · PDF17 Dec 2021View
VENTILATION SCHEMATIC 6 OF 6Drawing · PDF17 Dec 2021View
ATTENUATOR SCHEDULE EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
COMMISSIONING SET ISSUEDrawing · PDF17 Dec 2021View
AIR DIRT SEPRATOR EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
DOSING POTS EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
RADIATORS EQUIPMENT SCHEDULESDrawing · PDF17 Dec 2021View
VENTILATION SCHEMATIC 1 OF 6Drawing · PDF17 Dec 2021View
VENTILATION SCHEMATIC 5 OF 6Drawing · PDF17 Dec 2021View
VENTILATION SCHEMATIC 2 OF 6Drawing · PDF17 Dec 2021View
SCHEDULE OF BUILDERS WORKDrawing · PDF17 Dec 2021View
EQUIPMENT BOILER SCHEDULEDrawing · PDF17 Dec 2021View
CIRCULATION PUMPS EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
WATER HEATERS EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
PROPOSED CHILLED WATER LAYOUTDrawing · PDF17 Dec 2021View
FLUE INSTSLLATION EQUIPMENT LAYOUTDrawing · PDF17 Dec 2021View
TRENCH HEATING EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
PRESSURATION UNIT EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
EXTRACT FANS EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View
HEAT RECOVERY UNITS EQUIPMENT SCHEDULEDrawing · PDF17 Dec 2021View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Decision Made Date

    Published milestoneCouncil source

Decision & conditions

Conditions Discharged
DECISION NOTICE

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.