Variation of Conditions 1 (Approved Plans), 7 (underground services), 8 (foul and surface water drainage), 12 (finished ground floor slab levels), and 18 (schedule of materials and samples) of previously approved application DC/15/1702 (Erection of 300 dwellings, 2 x football pitches, MUGA and NEAP with associated access, parking and landscape works pursuant to outline planning permission DC/09/2138 (as amended by DC/11/2004) (Approval of Reserved Matters)), to allow the submission of water neutrality information to be secured under Condition 1 to demonstrate Phases 8, 10, 11, 12 and 13 are water neutral, and Variation of Conditions 7, 8, 12, and 18 to enable details pertaining to those conditions to be secured associated to Phase 8.
Land East of A24 Worthing Road Horsham West Sussex
Variation of Conditions 1 (Approved Plans), 7 (underground services), 8 (foul and surface water drainage), 12 (finished ground floor slab levels), and 18 (schedule of materials and samples) of previously approved application DC/15/1702 (Erection of 300 dwellings, 2 x football pitches, MUGA and NEAP with associated access, parking and landscape works pursuant to outline planning permission DC/09/2138 (as amended by DC/11/2004) (Approval of Reserved Matters)), to allow the submission of water neutrality information to be secured under Condition 1 to demonstrate Phases 8, 10, 11, 12 and 13 are water neutral, and Variation of Conditions 7, 8, 12, and 18 to enable details pertaining to those conditions to be secured associated to Phase 8.
Reference
DC/24/1996
Alternative references
PP-13659404
Ward
Denne
Parish
Denne NC (pre HPC)
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.