Variation of Condition 1 of previously approved application DC/20/1165 (Variation of Condition 1 of approved application DC/19/0295 (Hybrid application for the erection of petrol filling station with convenience store and sandwich bar, car wash, jet wash and car parking; motorcycle showroom and workshop with associated car parking; outline planning permission for flexible employment space (B1b/B1c/B2/B8) totalling 4,627sqm with associated car parking and appearance reserved); new access to the site from A272 and pedestrian link to footbridge over A29.) Relating to the site layout plan for Phase 1). To increase size of building for the provision of additional display space. Two car park spaces revised to electric charging spaces.
Land Off Platts Roundabout Newbridge Road Billingshurst West Sussex
Variation of Condition 1 of previously approved application DC/20/1165 (Variation of Condition 1 of approved application DC/19/0295 (Hybrid application for the erection of petrol filling station with convenience store and sandwich bar, car wash, jet wash and car parking; motorcycle showroom and workshop with associated car parking; outline planning permission for flexible employment space (B1b/B1c/B2/B8) totalling 4,627sqm with associated car parking and appearance reserved); new access to the site from A272 and pedestrian link to footbridge over A29.) Relating to the site layout plan for Phase 1). To increase size of building for the provision of additional display space. Two car park spaces revised to electric charging spaces.
Reference
DC/23/1892
Alternative references
PP-12483672
Ward
Billingshurst
Parish
Billingshurst PC
Agent
- Alder King Planning Consultants
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.