Scotland · Local authority

Highland
Planning applications.

Explore collected planning applications and decisions for Highland. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
1,574Searchable applications
636Recorded as pending
95%Approval rate · 785 approved or refused records
40Refused applications

745 approved · 40 refused · 42 withdrawn. Received dates in our records: 21 Dec 2021 to 24 Sept 2026. Most recent record check: 28 Sept 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas30 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Under Consideration26/04116/PAN

    Coire Mashie Project - Beauly-Denny Overhead Line Diversion works - Install and operate two new 400 kV steel lattice towers, together with two sections of approximately 0.4km of new overhead line (including a temporary diversion requiring 1.16km requiring new temporary towers) to facilitate the tie-in of the existing Beauly-Denny overhead line into the proposed Coire Mashie 400 kV substation.

    Land 1.3KM SE Of Strathmashie Cottage Strathmashie Laggan

    Received 15 Sept 2026
  2. Under Consideration26/04120/PAN

    Fasnakyle to Bingally 132kV connection - Construction and operation of a new section of OHL between the existing Tower 201 and the proposed new Tower 200R, within the proposed new CSE compound. Removal of approximately 440m of OHL at the Beauly-Denny tie in between Tower 201 and Tower 64. Upgrades to the existing access track, the use of temporary working areas around the proposed Cable Sealing End compound and the towers, and the establishment of a temporary construction compound.

    SSE Fasnakyle Switching Station Cannich

    Received 18 Sept 2026
  3. Under Consideration26/04126/PAN

    Provision of new accommodation for 631 capacity (600 roll) secondary school, to replace part of the existing school at Fortrose Academy. The proposed development includes part demolition of existing school blocks, with new build accommodation to current standards. The proposal will also include new landscaping, external spaces, building services and the creation of a new sports pitch

    Fortrose Academy Academy Street Fortrose IV10 8TW

    Received 17 Sept 2026
  4. Under Consideration26/04128/PAN

    Erection of sawmill facility (Class 5 and 6) including log storage and drying with associated development

    Land 550M East Of West Fraser Dalcross

    Received 18 Sept 2026
  5. Under Consideration26/04140/SCRE

    Erection of secondary school including construction of a replacement sports block with associated landscaping and parking

    Inverness High School Montague Row Inverness IV3 5DZ

    Received 17 Sept 2026
  6. Under Consideration26/04141/SCRE

    Provision of new accommodation for 631 pupil capacity (600 roll) secondary school, to replace part of the existing school at Fortrose Academy. The proposed development includes part demolition of existing school blocks, with new build accommodation to current standards. The proposal will also include new landscaping, external spaces, building services and the creation of new sports pitch

    Fortrose Academy Academy Street Fortrose IV10 8TW

    Received 17 Sept 2026
  7. Under Consideration26/01602/PAR

    Alteration of an existing access/track for vehicular access for forestry timber extraction Class 22

    Land 45M SE Of 4 Church Place Dulnain Bridge

    Received 16 Sept 2026
  8. Under Consideration26/04172/PNO

    Peatland Restoration Class 20A

    Backlass Estate Halkirk Caithness

    Received 22 Sept 2026
  9. Awaiting decision26/03370/PAR

    Demolition of house - Class 70

    Garten Lawn Acharacle PH36 4JY

    Received 16 Sept 2026
  10. Under Consideration26/04176/SCRE

    Road Improvement Works along the A838 between its junction with the A836and the Sallachy Wind Farm access at Corrykinloch

    Land 3500M NW Of Burnside West Shinness Lairg

    Received 21 Sept 2026
  11. Awaiting decision26/03341/PAR

    Demolition of house Class 70

    Kila 79 Grampian Road Aviemore PH22 1RH

    Received 16 Sept 2026
  12. Under Consideration26/04201/PNO

    Peatland Restoration - Class 20A

    Shurrery Estate Nr Halkirk Caithness KW14 7RB

    Received 23 Sept 2026
  13. Under Consideration26/04210/PNO

    Prior Notification of Peatland Restoration under class 20A - Rumsdale Estate Peatland Restoration - Phase 1 - 4

    Rumsdale Estate Halkirk Caithness

    Received 23 Sept 2026
  14. Under Consideration26/04222/PNO

    Prior Notification of Peatland Restoration under class 20A - Altnaharra Phase 2

    2km North Of Mudale Farm Altnaharra IV27 4UE

    Received 24 Sept 2026

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Highland

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Highland, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage