Council planning record

Carn Fearna Wind Farm - Erection and operation of a wind farm for a period of 50 years, comprising of 9 wind turbines, 5 (T1, T2, T3, T4 and T8) with a maximum blade tip height of 200m, and 4 (T5, T6, T7 and T9) with a maximum blade tip height of 180m, access tracks, borrow pits, substation, control building, and ancillary infrastructure. This case will be determined by the Energy Consents Unit. Please visit Energy Consents Unit at https://www.energyconsents.scot/ApplicationSearch.aspx?T=2 using reference number ECU00004851

Land 4KM North East Of Garve

Awaiting decisionReference: 25/01650/S36Highland

Last published check: 28 Sept 2026, 10:40. Check the council record for more recent changes.

Application location

Land 4KM North East Of Garve

This record has no verified map location.

View council map

Application summary

Status
Awaiting decision
Application type
Section 36
Received
25 Apr 2025
Validated
25 Apr 2025
Determination deadline
24 Aug 2025
Local authority
Highland

Application overview

Carn Fearna Wind Farm - Erection and operation of a wind farm for a period of 50 years, comprising of 9 wind turbines, 5 (T1, T2, T3, T4 and T8) with a maximum blade tip height of 200m, and 4 (T5, T6, T7 and T9) with a maximum blade tip height of 180m, access tracks, borrow pits, substation, control building, and ancillary infrastructure. This case will be determined by the Energy Consents Unit. Please visit Energy Consents Unit at https://www.energyconsents.scot/ApplicationSearch.aspx?T=2 using reference number ECU00004851

Proposal details

Reference
25/01650/S36
Ward
Wester Ross, Strathpeffer And Lochalsh
Agent
SLR Consulting

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 330 of 330

DocumentPublishedAction
CONFIRMATION OF RAISE OBJECTIONCOUNCIL CORRESPONDENCE · PDF6 Aug 2026View
REPORT OF HANDLINGCOMMITTEE REPORT · PDF6 Aug 2026View
FORESTRY TEAMCONSULTEE COMMENT · PDF20 Jul 2026View
ECOLOGYCONSULTEE COMMENT · PDF5 Mar 2026View
CONSERVATION HISTORIC ENVIRONMENT TEAMCONSULTEE COMMENT · PDF29 Jan 2026View
ACCESS OFFICERCONSULTEE COMMENT · PDF16 Jan 2026View
HISTORIC ENVIRONMENT TEAM ? ARCHAEOLOGYCONSULTEE COMMENT · PDF16 Jan 2026View
THC RESPONSE TO ECUCOUNCIL CORRESPONDENCE · PDF8 Dec 2025View
LANDSCAPE OFFICERCONSULTEE COMMENT · PDF27 Nov 2025View
ENVIRONMENTAL HEALTHCONSULTEE COMMENT · PDF19 Jun 2025View
TRANSPORT PLANNINGCONSULTEE COMMENT · PDF10 Jun 2025View
PRE-APPLICATION CONSULTATION REPORTSUPPORTING INFORMATION · PDF22 May 2025View
VOLUME 3A - FIGURE 1.1 - SITE LOCATIONENVIRONMENTAL IMPACT ASSESSMENT · PDF25 Apr 2025View
VOLUME 3A - FIGURE 7.8D - HUB HEIGHT ZTV 45KM A0SUPPORTING INFORMATION · PDF24 Apr 2025View
PSAD APPLICATION FORMPSAD Application Form · PDF24 Apr 2025View
PSAD APPLICATION FORMPSAD Application Form · PDF24 Apr 2025View
PRE-APPLICATION CONSULTATION REPORT APPENDICES - PART 1SUPPORTING INFORMATION · PDF24 Apr 2025View
PRE-APPLICATION CONSULTATION REPORT APPENDICES - PART 2SUPPORTING INFORMATION · PDF24 Apr 2025View
PRE-APPLICATION CONSULTATION REPORTSUPPORTING INFORMATION · PDF24 Apr 2025View
DESIGN STATEMENT - PART 6SUPPORTING INFORMATION · PDF24 Apr 2025View
DESIGN STATEMENT - PART 7SUPPORTING INFORMATION · PDF24 Apr 2025View
DESIGN STATEMENT - PART 8SUPPORTING INFORMATION · PDF24 Apr 2025View
PSAD APPLICATION FORMPSAD Application Form · PDF24 Apr 2025View
VOL 2 - CHAPTER 9 - ORNITHOLOGYENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 2 - CHAPTER 8 - ECOLOGYENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 2 - CHAPTER 7 - LANDSCAPE AND VISUAL IMPACT ASSESSMENTENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 2 - CHAPTER 6 - SCOPING AND CONSULTATIONENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 2 - CHAPTER 5 - EIA METHODOLOGYENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 2 - CHAPTER 4 - LEGISLATIVE AND POLICY FRAMEWORKENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 2 - CHAPTER 3 - DESCRIPTION OF THE DEVELOPMENTENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 2 - CHAPTER 2 - SITE DESCRIPTION AND DESIGN EVOLUTIONENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 2 - CHAPTER 1 - INTRODUCTIONENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 2 - CHAPTER 17 - SCHEDULE OF COMMITMENTSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 2 - CHAPTER 10 - GEOLOGY, HYDROLOGY, HYDROGEOLOGY AND PEATENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 2 - CHAPTER 11 - ARCHAEOLOGY AND CULTURAL HERITAGEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 2 - CHAPTER 12 - NOISE AND VIBRATIONENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 2 - CHAPTER 13 - SITE ACCESS, TRAFFIC AND TRANSPORTENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 2 - CHAPTER 14 - SOCIO-ECONOMICS, RECREATION, TOURISM AND LAND USEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 2 - CHAPTER 15 - AVIATIONENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 2 - CHAPTER 16 - OTHER CONSIDERATIONSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 1 - NON-TECHNICAL SUMMARYENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 1.1 - SITE LOCATIONENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 1.2 - APPLICATION BOUNDARYENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 2.1 - ENVIRONMENTAL DESIGNATIONSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 2.2a-c - SITE CONSTRAINTS - OVERVIEWENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 2.3 - WIND TURBINE LOCATION DESIGN EVOLUTIONENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 3.1 - SITE LAYOUTENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 3.10 - INDICATIVE TURBINE FOUNDATIONENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 3.2 - TURNING CIRCLE AT INCHBAE LODGEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 3.3 - INDICATIVE JUNCTION MAIN SITEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 3.4 - INDICATIVE JUNCTION OFF-SITE TURNING CIRCLEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 3.5 - INDICATIVE CONSTRUCTION COMPOUNDENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 3.6 - INDICATIVE TRACK DETAILENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 3.7 - TYPICAL WATERCOURSE CROSSINGENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 3.8a-c - WOODLAND FELLINGENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 3.9 - TYPICAL TURBINE ELEVATIONENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 3.11 - INDICATIVE CRANE HARDSTANDINGENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 3.12 - TYPICAL SUBSTATION COMPOUNDENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 3.13 - INDICATIVE CONTROL BUILDING ELEVATIONSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 3.14 - INDICATIVE CABLE TRENCH DETAILENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 8.1 - STATUTORY DESIGNATED SITES WITH ECOLOGICAL INTERESTENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 8.2a - PHASE 1 HABITAT SURVEY PLAN (THE SITE)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 8.2b - PHASE 1 HABITAT SURVEY PLAN (OFF-SITE TURNING CIRCLE)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 8.3 - NVC SURVEY PLANENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 8.4 - PEATLAND CONDITION ASSESSMENTENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 8.5 - PROTECTED TERRESTRIAL MAMMAL SURVEY RESULTSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 8.6 - BAT ACTIVITY SURVEY PLANENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 8.7a - POTENTIAL ROOST FEATURE PLAN (THE SITE)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 8.7b - POTENTIAL ROOST FEATURE PLAN (OFF-SITE TURNING CIRCLE)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 8.8 - FISH HABITAT SURVEY PLANENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 9.1 - STATUTORY DESIGNATED SITES WITH ORNITHOLOGICAL INTERESTSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 9.2 - VAMTAGE POINT LOCATIONS AND VIEWSHEDSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 9.3 - BREEDING BIRD SURVEY AREASENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 9.4a - FLIGHT ACTIVITY SURVEY RESULTS (YEAR 1) - WADERSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 9.4b - FLIGHT ACTIVITY SURVEY RESULTS (YEAR 1) - RAPTORS AND OWLENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 9.4c - FLIGHT ACTIVITY SURVEY RESULTS (YEAR 1) - OTHER SPECIESENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 9.5a - FLIGHT ACTIVITY SURVEY RESULTS (YEAR 2) - WADERSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 9.5b - FLIGHT ACTIVITY SURVEY RESULTS (YEAR 2) - RAPTORS AND OWLENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 9.5c - FLIGHT ACTIVITY SURVEY RESULTS (YEAR 2) - OTHER SPECIESENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 9.6a - MOORLAND BREEDING BIRD SURVEY RESULTS (YEAR 1)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 9.6b - MOORLAND BREEDING BIRD SURVEY RESULTS (YEAR 2)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 10.1a-c - LOCAL HYDROLOGYENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 10.2a-c - SOILSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 10.3a-c - SUPERFICIAL GEOLOGYENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 10.4a-c - PEATLAND CLASSIFICATIONENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 10.5a - BEDROCK GEOLOGYENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 10.6 - REGIONAL HYDROGEOLOGYENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 10.7a - AQUIFER CLASSIFICATION AND GROUNDWATER VULNERABILITY - OENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 10.7b - AQUIFER CLASSIFICATION AND GROUNDWATER VULNERABILITY - WENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 10.8a-e - GROUNDWATER DEPENDENT TERRESTRIAL ECOSYSTEMSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 12.1a-b - NOISE ASSESSMENT AND MONITORING LOCATIONSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 13.1 - STUDY AREA, TRAFFIC COUNT LOCATIONS AND ALIV ROUTEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 14.1 - LOCAL STUDY AREA AND LOCAL AREA OF INFLUENCEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
PSAD APPLICATION FORMPSAD Application Form · PDF24 Apr 2025View
VOL 3a - FIGURE 7.1 - SITE LOCATION AND STUDY AREASENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.2 - LANDFORMENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.3a - LANDSCAPE CHARACTER (45 KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.3b - LANDSCAPE CHARACTER (20 KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.4a - LANDSCAPE DESIGNATIONS (45 KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.4b - LANDSCAPE DESIGNATIONS (20 KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.5a - WILD LAND (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.5b - WILD LAND (20KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.6a - PRINCIPAL VISUAL RECEPTORS (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.6b - PRINCIPAL VISUAL RECEPTORS (20KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.8a - HUB HEIGHT ZTV WITH VIEWPOINTS (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.8b - HUB HEIGHT ZTV WITH VIEWPOINTS (20KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.8c - HUB HEIGHT ZTV WITH VIEWPOINTS (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.9a - BASELINE LIGHT POLLUTION WITH VIEWPOINTS (20KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.9b - TURBINE LIGHTING ZTVENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.9c - LIGHTING INTENSITY ZTVENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.14a - CUMULATIVE WIND FARMS (60KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.14b - CUMULATIVE WIND FARMS (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15aa - CUMULATIVE ZTV - STRATH OYKEL (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15b - CUMULATIVE ZTV - ACHANY (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15d - CUMULATIVE ZTV - ACHANY EXTENSION (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15g - CUMULATIVE ZTV - BHLARAIDH (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15h - CUMULATIVE ZTV - BHLARAIDH EXTENSION (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15j - CUMULATIVE ZTV - CORRIEMOILLIE (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15k - CUMULATIVE ZTV - CORRIMONY (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15q - CUMULATIVE ZTV - KIRKAN (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15u - CUMULATIVE ZTV - LOCHLUICHART AND EXTENSION (45KM RADIUSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15v - CUMULATIVE ZTV - LOCHLUICHART EXTENSION II (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15x - CUMULATIVE ZTV - MOY (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15z - CUMULATIVE ZTV - ROSEHALL (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 14.2a-b - ACCOMMODATION RECEPTORSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 14.3 - TOURISM AND RECREATION RECEPTORSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 16.1 - SHADOW FLICKER STUDY AREAENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 16.2 - SHADOW FLICKER RESULTSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.16-7.48 - CONTENTSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.16 - VIEWPOINT 1 - GARVEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.17 - VIEWPOINT 2 - GORSTANENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.18 - VIEWPOINT 3 - TARVIEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.19 - VIEWPOINT 4 - LITTLE WYVISENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.20 - VIEWPOINT 5 - AN CABARENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.21 - VIEWPOINT 6 - GLEN LEATHAD MOR (BEN WYVIS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.22 - VIEWPOINT 7 - VIEW ROCKENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.23 - VIEWPOINT 8 - LOCH KINELLANENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.24 - VIEWPOINT 9 - A834, JAMESTOWNENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.25 - VIEWPOINT 10 - MARYBANKENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.26 - VIEWPOINT 11 - KNOCKFARRELENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.27 - VIEWPOINT 12 - PEFFERY WAY AT FODDERTY CEMETERYENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.28 - VIEWPOINT 13 - TESCO DINGWALLENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.29 - VIEWPOINT 14 - CULBOKIEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.30 - VIEWPOINT 15 - A862, WEST OF INVERNESSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.31 - VIEWPOINT 16 - GREAT GLEN WAY NEAR LADYCAIRNENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.32 - VIEWPOINT 17 - INVERNESS CASTLEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.33 - VIEWPOINT 18 - MILTON OF LEYS PRIMARY SCHOOLENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
PSAD APPLICATION FORMPSAD Application Form · PDF24 Apr 2025View
VOL 3b - FIGURE 7.34 - VIEWPOINT 19 - CULLODEN BATTLEFIELDENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.35 - VIEWPOINT 20 - SIMPSONS GARDEN CENTREENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.36 - VIEWPOINT 21 - A9, BLACK ISLEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.37 - VIEWPOINT 22 - A835/B9169 CROSSROADSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.38 - VIEWPOINT 23 - A835, CONTINENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.39 - VIEWPOINT 24 - A835, SOUTH OF LOCH GARVEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.40 - VIEWPOINT 25 - A835, LOCH GLASCARNOCHENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.41 - VIEWPOINT 26 - A832, STRATH BRANENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.42 - VIEWPOINT 27 - A832, LOCHLUICHARTENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.43 - VIEWPOINT 28 - A832 NEAR TORRIEGORRIEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.44 - VIEWPOINT 29 - SGURR A' MHULINNENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.45 - VIEWPOINT 30 - BEINN A' BHA'ACH ARDENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.46 - VIEWPOINT 31 - AN COILEACHANENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.47 - VIEWPOINT 32 - AM FAOCHAGACHENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - FIGURE 7.48 - VIEWPOINT 33 - CNOC FYRISH MOMUMENTENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.49-7.81 - CONTENTSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.49 - VIEWPOINT 1 - GARVEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.50 - VIEWPOINT 2 - GORSTANENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.51 - VIEWPOINT 3 - TARVIEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.52 - VIEWPOINT 4 - LITTLE WYVISENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.53 - VIEWPOINT 5 - AN CABARENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.54 - VIEWPOINT 6 - GLAS LEATHAD MOR (BEN WYVIS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.55 - VIEWPOINT 7 - VIEW ROCKENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.56 - VIEWPOINT 8 - LOCH KINELLANENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.57 - VIEWPOINT 9 - A834, JAMESTOWNENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.58 - VIEWPOINT 10 - MARYBANKENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.59 - VIEWPOINT 11 - KNOCKFARRELENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.60 - VIEWPOINT 12 - PEFFREY WAY AT FODDERTY CEMETERYENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.61 - VIEWPOINT 13 - TESCO DINGWALLENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.62 - VIEWPOINT 14 - CULBOKIEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.63 - VIEWPOINT 15 - A862, WEST OF INVERNESSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.64 - VIEWPOINT 16 - GREAT GLEN WAY NEAR LADYCAIRNENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.65 - VIEWPOINT 17 - INVERNESS CASTLEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
PSAD APPLICATION FORMPSAD Application Form · PDF24 Apr 2025View
VOL 3c - FIGURE 7.66 - VIEWPOINT 18 - MILTON OF LEYS PRIMARY SCHOOLENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.67 - VIEWPOINT 19 - CULLODEN BATTLEFIELDENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.68 - VIEWPOINT 20 - SIMPSONS GARDEN CENTREENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.69 - VIEWPOINT 21 - A9, BLACK ISLEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.70 - VIEWPOINT 22 - A835/B9169 CROSSROADSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.71 - VIEWPOINT 23 - A835, CONTINENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.72 - VIEWPOINT 24 - A835, SOUTH END OF LOCH GARVEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.73 - VIEWPOINT 25 - A835, LOCH GLASCARNOCHENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.74 - VIEWPOINT 26 - A832, STRATH BARNENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.75 - VIEWPOINT 27 - A832, LOCHLUICHARTENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.76 - VIEWPOINT 28 - A832 NEAR TORRIEGORRIEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.77 - VIEWPOINT 29 - SGURR A' MHUILINNENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.78 - VIEWPOINT 30 - BEINN A' BHA'ACH ARDENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.79 - VIEWPOINT 31 - AN COILEACHANENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.80 - VIEWPOINT 32 - AM FAOCHAGACHENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - FIGURE 7.81 - VIEWPOINT 33 - CNOC FYRISH MONUMENTENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3d - FIGURE 11.4-11.13 - CONTENTSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3d - FIGURE 11.4 - CULTURAL HERITAGE VIEWPOINT 1 - HEIGHTS OF BRAE, CHAMBEREENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3d - FIGURE 11.5 - CULTURAL HERITAGE VIEWPOINT 2 - KNOCK FARRIL, FORTENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3d - FIGURE 11.6 - CULTURAL HERITAGE VIEWPOINT 3 - CLACHAN CORRACH, CHAMBEREENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3d - FIGURE 11.7 - CULTURAL HERITAGE VIEWPOINT 4 - FLODH MHOR, HENGE (SM1374ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3d - FIGURE 11.8 - CULTURAL HERITAGE VIEWPOINT 5 - LITTLE GARVE, BRIDGE OVERENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3d - FIGURE 11.9 - CULTURAL HERITAGE VIEWPOINT 6 - FAIRBURN (GDL00174)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3d - FIGURE 11.10 - CULTURAL HERITAGE VIEWPOINT 7 - FAIRBURN TOWER (LB14030)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3d - FIGURE 11.11 - CULTURAL HERITAGE VIEWPOINT 8 - CASTLE LEOD (GDL0094)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3d - FIGURE 11.12 - CULTURAL HERITAGE VIEWPOINT 9 - CASTLE LEOD (LB7826)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3d - FIGURE 11.13 - CULTURAL HERITAGE VIEWPOINT 10 - THE HENGE, 180m W OF TEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 1.1 - ACRONYMS, ABBREVIATIONS AND GLOSSARYENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 3.1 - OUTLINE CONSTRUCTION ENVIRONMENTAL MANAGEMENT PENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 3.2 - BORROW PIT ASSESSMENT REPORTENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 6.1 - SCOPING RESPONSE TABLEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.1 - LVIA METHODOLOGYENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.2 - RESIDENTIAL VISUAL AMENITY ASSESSMENT REPORTENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.3 - FIGURE 7.3.1 - 7.3.3 - WILD LAND VIEWPOINTSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 8.1 - HABITATS AND VEGETATIONENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 8.2 - TERRESTRIAL MAMMALSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 8.3 - BATSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 8.4 - FISHERIESENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 8.5 - OUTLINE NATURE ENHANCEMENT MANAGEMENT PLANENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 9.1 - ORNITHOLOGY METHODOLOGY AND RESULTSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 9.3 - COLLISION RISK MODEL ANALYSISENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 10.1 - PEAT LANDSLIDE HAZARD RISK ASSESSMENT - PART 1ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 10.1 - PEAT LANDSLIDE HAZARD RISK ASSESSMENT - PART 2ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 10.1 - PEAT LANDSLIDE HAZARD RISK ASSESSMENT - PART 3ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 10.1 - PEAT LANDSLIDE HAZARD RISK ASSESSMENT - PART 4ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 6.2 - SCOPING OPINION - FINAL - PART 1ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 6.2 - SCOPING OPINION - FINAL - PART 2ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
PSAD APPLICATION FORMPSAD Application Form · PDF24 Apr 2025View
PSAD APPLICATION SUMMARYCORRESPONDENCE · PDF24 Apr 2025View
MARINE DIRECTORATE - SCIENCE EVIDENCE DATA AND DIGITAL (MD-SEDD) - EIA CHECK LISENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
PLANNING STATEMENTSUPPORTING INFORMATION · PDF24 Apr 2025View
DESIGN STATEMENT - PART 1SUPPORTING INFORMATION · PDF24 Apr 2025View
DESIGN STATEMENT - PART 2SUPPORTING INFORMATION · PDF24 Apr 2025View
DESIGN STATEMENT - PART 3SUPPORTING INFORMATION · PDF24 Apr 2025View
DESIGN STATEMENT - PART 4SUPPORTING INFORMATION · PDF24 Apr 2025View
DESIGN STATEMENT - PART 5SUPPORTING INFORMATION · PDF24 Apr 2025View
VOL 2 - WRITTEN STATEMENT CONTENTSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURES SUPPORTING CHAPTERS 1-16 CONTENTSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3b - PROPOSED DEVELOPMENT VISUALISATIONS FOLLOWING NATURESCOT STANDARDS CONTENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3c - VISUALISATIONS FOLLOWING THE HIGHLAND COUNCIL STANDARDS CONTENTSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3d - CULTURAL HERITAGE VISUALISATIONS CONTENTSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.1-7.4.33 - CONTENTSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.3 - VIEWPOINT 3 - TARVIEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.4 - VIEWPOINT 4 - LITTLE WYVISENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.5 - VIEWPOINT 5 - AN CABARENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.6 - VIEWPOINT 6 - GLAS LEATHAD MOR (ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.1 - VIEWPOINT 1 - GARVEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.2 - VIEWPOINT 2 - GORSTANENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.7 - VIEWPOINT 7 - VIEW ROCKENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.8 - VIEWPOINT 8 - LOCH KINELLANENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.9 - VIEWPOINT 9 - A834, JAMESTOWNENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.10 - VIEWPOINT 10 - MARYBANKENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 12.2 - BACKGROUND NOISE SURVEY MEASUREMENT DATAENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 12.4 - SODAR DEPLOYMENT REPORTENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 12.5 - TRITON INSTALLATION PHOTO REPORTENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.11 - VIEWPOINT 11 - KNOCKFARRELENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.12 - VIEWPOINT 12 - PEFFERY WAY AT FENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.13 - VIEWPOINT 13 - TESCO DINGWALLENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.14 - VIEWPOINT 14 - CULBOKIEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.15 - VIEWPOINT 15 - A862, WEST OF INENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.16 - VIEWPOINT 16 - GREAT GLEN WAY NENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.17 - VIEWPOINT 17 - INVERNESS CASTLEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.18 - VIEWPOINT 18 - MILTON OF LEYS PENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.19 - VIEWPOINT 19 - CULLODEN BATTLEFENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.20 - VIEWPOINT 20 - SIMPSONS GARDENENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.21 - VIEWPOINT 21 - A9, BLACK ISLEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.22 - VIEWPOINT 22 - A835/B9169 CROSSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.23 - VIEWPOINT 23 - A835, CONTINENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.24 - VIEWPOINT 24 - A835, SOUTH ENDENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.25 - VIEWPOINT 25 - A835, LOCH GLASCENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.26 - VIEWPOINT 26 - A832, STRATH BRAENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.27 - VIEWPOINT 27 - A832, LOCHLUICHAENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.28 - VIEWPOINT 28 - A832 NEAR TORRIEENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.29 - VIEWPOINT 29 - SGURR A' MHUILINENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.30 - VIEWPOINT 30 - BEINN A' BHA'ACHENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.31 - VIEWPOINT 31 - AN COIEACHANENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.32 - VIEWPOINT 32 - AM FAOCHAGACHENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 7.4 - FIGURE 7.4.33 - VIEWPOINT 33 - CNOC FYRISH MONUENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 10.1 - PEAT LANDSLIDE HAZARD RISK ASSESSMENT - PART 5ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 10.2 - PEAT MANAGEMENT PLAN - PART 1ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 10.2 - PEAT MANAGEMENT PLAN - PART 2ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 10.3 - SCHEDULE OF WATERCOURSE CROSSINGSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 10.4 - PRIVATE WATER SUPPLY RISK ASSESSMENT (PWSRA)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 11.2 - DESIGNATED CULTURAL HERITAGE SETTINGS APPRAISAENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 12.1 - BASELINE NOISE SURVEY DETAILSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 12.3 - ETSU-R-97 ASSESSMENT GRAPHSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 13.1 - ROUTE SURVEY ACCESS REPORT - PART 1ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 13.1 - ROUTE SURVEY ACCESS REPORT - PART 2ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 13.1 - ROUTE SURVEY ACCESS REPORT - PART 3ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 10.2 - PEAT MANAGEMENT PLAN - PART 3ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 14.1 - SOCIO-ECONOMIC BENEFITSENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 14.2 - OUTLINE OUTDOOR MANAGEMENT PLAN - PART 1ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 14.2 - OUTLINE OUTDOOR MANAGEMENT PLAN - PART 2ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 14.2 - OUTLINE OUTDOOR MANAGEMENT PLAN - PART 3ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 14.2 - OUTLINE OUTDOOR MANAGEMENT PLAN - PART 4ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 15.1 - AVIATION LIGHTING AND MITIGATION REPORTENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 16.1 - CARBON CALCULATOR REPORTENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4 - TECHNICAL APPENDIX 11.1 - NON-DESIGNATED MONUMENT DATAENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4a - TECHNICAL APPENDICES TO SUPPORT EIA CHAPTERS 1-9ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 4b - TECHNICAL APPENDICES TO SUPPORT EIA CHAPTERS 10-16ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.7a - BLADE TIP ZTV WITH VIEWPOINTS (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.7b - BLADE TIP ZTV WITH VIEWPOINTS (20KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.7c - BLADE TIP ZTV WITH VIEWPOINTS (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.7d - BLADE TIP ZTV WITH VIEWPOINTS (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.10a - BLADE TIP ZTV WITH LANDSCAPE CHARACTER (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.10b - BLADE TIP ZTV WITH LANDSCAPE CHARACTER (20KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.11a - LANDSCAPE DESIGNATIONS WITH BLADE TIP ZTV (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.11b - LANDSCAPE DESIGNATIONS WITH BLADE TIP ZTV (20KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.12a - WILD LAND WITH BLADE TIP ZTV (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.12b - WILD LAND WITH BLADE TIP ZTV (20KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.13a - PRINCIPAL VISUAL RECEPTORS WITH BLADE TIP ZTV (45KM RADIENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.13b - PRINCIPAL VISUAL RECEPTORS WITH BLADE TIP ZTV (20KM RADIENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15a - CUMULATIVE ZTV - ABHAINN DUBH (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15ab - CUMULATIVE ZTV - STRATHRORY (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15c - CUMULATIVE ZTV - ACHEILIDH (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15e - CUMULATIVE ZTV - AUCHMORE AND AUCHMORE 2 (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15f - CUMULATIVE ZTV - BEINN THARSUINN AND BEINN AN OIGHREAN (ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15i - CUMULATIVE ZTV - COIRE NA CLOCHE (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15l - CUMULATIVE ZTV - CHRATHAICH (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15n - CUMULATIVE ZTV - FARR (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15m - CUMULATIVE ZTV - FAIRBURN (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15o - CUMULATIVE ZTV - GARVARY (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15p - CUMULATIVE ZTV - GLEN KYLLACHY (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15r - CUMULATIVE ZTV - LAIRG (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15s - CUMULATIVE ZTV - LAIRG II (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15t - CUMULATIVE ZTV - LOCH LIATH (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15w - CUMULATIVE ZTV - MEALL BUIDHE (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View
VOL 3a - FIGURE 7.15y - CUMULATIVE ZTV - NOVAR AND EXTENSION (45KM RADIUS)ENVIRONMENTAL IMPACT ASSESSMENT · PDF24 Apr 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Environmental Impact Assessment Received

    Published milestoneCouncil source
  2. Application Received Date

    Published milestoneCouncil source
  3. Application Validated Date

    Published milestoneCouncil source
  4. Standard Consultation Date

    Published milestoneCouncil source
  5. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Actual Committee Date

    Published milestoneCouncil source
  9. Decision Issued Date

    Published milestoneCouncil source
  10. Decision Made Date

    Published milestoneCouncil source
  11. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

S36 Raise Objection
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.