Two silver birches located along the left fence of the property looking outwards.T1 Silver BirchReduce the overall height by approximately 2m and the lateral spread by 1.5m leaving a final height of approximately 7m above ground level and a final spread of 4m. The proposed works are to provide adequate clearance from the property and allow for general tree maintenance.T2 Silver BirchRemove deadwood from the upper section of the canopy and reduce the lateral spread by approximately 1.5-2m leaving an overall height of approximately 4m and a final spread of 3.5m. The proposed works are to provide adequate clearance from the property and allow for general tree maintenance.Both works have been assessed and will be carried out by the Joshua Tree, Potters Bar.
13 Elmroyd Avenue Potters Bar Hertfordshire EN6 2ED
Two silver birches located along the left fence of the property looking outwards.T1 Silver BirchReduce the overall height by approximately 2m and the lateral spread by 1.5m leaving a final height of approximately 7m above ground level and a final spread of 4m. The proposed works are to provide adequate clearance from the property and allow for general tree maintenance.T2 Silver BirchRemove deadwood from the upper section of the canopy and reduce the lateral spread by approximately 1.5-2m leaving an overall height of approximately 4m and a final spread of 3.5m. The proposed works are to provide adequate clearance from the property and allow for general tree maintenance.Both works have been assessed and will be carried out by the Joshua Tree, Potters Bar.
Reference
26/1132/TRC
Alternative references
PP-15144943
Ward
Bentley Heath & The Royds
Parish
No Parish
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.