ApprovedCouncil status: Permitted

Application for the proposed increase in waste processing throughput from 75,000 tpa (tonnes per annum) to 200,000 tpa together with associated infrastructure to include; increase in shed size to 2460m²; removal of baling shed and construction of 200m² vehicle workshop; construction of 1050m² building for the processing of inert material; double stacked portacabin office; alterations to the site layout to allow for the separation of commercial and industrial waste processing areas and inert waste processing areas along with other ancillary works

Unit 1, Colne Way Industrial Estate, Colne Way, Watford, Hertfordshire, WD25 9WY

Hertfordshire County CouncilReference PL/0170/20

Last published check: 13 Nov 2026, 20:08. Check the council record for more recent changes.

Status and dates

Last published check: 13 Nov 2026, 20:08 (UK)

  1. DoneReceived7 Aug 2020
  2. DoneValidated2 Nov 2021
  3. ClosedConsultationEnded 28 Jan 2022
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedPermitted3 Mar 2023

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (5)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Start of Public Consultation

    Published milestoneCouncil source
  4. Public Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Date

    Published milestoneCouncil source
Documents
42 published

Proposal

Application for the proposed increase in waste processing throughput from 75,000 tpa (tonnes per annum) to 200,000 tpa together with associated infrastructure to include; increase in shed size to 2460m²; removal of baling shed and construction of 200m² vehicle workshop; construction of 1050m² building for the processing of inert material; double stacked portacabin office; alterations to the site layout to allow for the separation of commercial and industrial waste processing areas and inert waste processing areas along with other ancillary works

Reference
PL/0170/20
Agent
Chris Lee

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Decision Notice.pdfDecision Notice and associated report3 Mar 2023View
  • Affinity Water response PL017020.pdfConsultation responses4 Jan 2022View
  • Thames Water response PL017020.pdfConsultation responses6 Dec 2021View
  • Watford Borough Council response PL007020.pdfConsultation responses18 Jan 2022View
  • Environment Agency response.pdfConsultation responses15 Feb 2022View
  • Landscape comments.pdfConsultation responses5 Apr 2022View
  • Highways Authority Response_PL-0170-20.pdfConsultation responses5 Jul 2022View
  • Noise and Vibration Assessment_ISSUED(11.02.22).pdfFurther information received15 Feb 2022View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permitted
Decision Notice.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.