Erection of an extension to the side (south) of the existing waste reception building (82 Maxted Close)(retrospective); Erection of a covered bay to the rear (north) of the existing waste reception building; Erection of a workshop building in the north-eastern corner of 86 Maxted Close (retrospective); Use of the existing 86 Maxted Close for uses ancillary to the waste process (vehicle parking, site access, office, workshop); Erection of a 2m close-boarded fence along road boundary of 86 Maxted Close; Relocation of portacabin offices from 82 Maxted Close to 86 Maxted Close; Amendment of condition 17 of HCC planning permission 4/2186/CMA to enable an increase in the number of vehicle movements to 200/day Monday – Friday and 140 on Saturdays; Increase of waste permitted on the site to 75,000 tonnes per annum.
Erection of an extension to the side (south) of the existing waste reception building (82 Maxted Close)(retrospective); Erection of a covered bay to the rear (north) of the existing waste reception building; Erection of a workshop building in the north-eastern corner of 86 Maxted Close (retrospective); Use of the existing 86 Maxted Close for uses ancillary to the waste process (vehicle parking, site access, office, workshop); Erection of a 2m close-boarded fence along road boundary of 86 Maxted Close; Relocation of portacabin offices from 82 Maxted Close to 86 Maxted Close; Amendment of condition 17 of HCC planning permission 4/2186/CMA to enable an increase in the number of vehicle movements to 200/day Monday – Friday and 140 on Saturdays; Increase of waste permitted on the site to 75,000 tonnes per annum.
Reference
PL\0106\08
Agent
AMEC Earth & Environmental
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.