Hybrid application seeking: 1) Full Planning permission for Development of a reservoir for raw water storage, A pumped storage reservoir, with the minimum required total storage capacity of 8,700 million litres (Ml), to support the planned bulk supply transfer of at least 21Ml/d in extreme (currently defined as 1:200 year) drought conditions; Construction of an earth embankment adjacent to Staunton Country Park ; Construction of an overflow discharge/spillway at the south-western side of the reservoir and associated works; Construction of a new junction on the B2149 Manor Lodge Road and a new junction on Swanmore Road. Provision of viewing areas on the southern embankment and western edge of the reservoir. 2) Outline application for (matters to be considered outlined in Table 2.2 in the submitted Development Specification) control house partially incorporated within landscaped earth mounding adjacent to the south west embankment; together with provision of other earth embankments. Construction of a visitor centre / cafe, with storage areas and welfare facilities to the northwest of the reservoir to be used for recreational and education purposes; Provision of picnic area(s) and children's play area(s). Access routes from both junctions to the visitor car park; visitor car park comprising 193 car parking spaces and between 70 and 75 overflow spaces plus spaces for staff, coach/minibus and disabled drivers sited to the north west of the reservoir. Creation of a permanent wetland on the northern side of the reservoir and construction of bird watching hide/screen(s); recreational facilities for public amenity. Provision of perimeter tracks and a network of bridleways, cycle paths and footpaths; Construction of a slipway on the western bank of the reservoir for operational use only and a small section of the proposed pipeline (210m). (Approved 15.10.2021). Request to discharge conditions 4, 6, 9, 10, 12 (received 22.9.22). Request to discharge conditions 5, 29 (received 26.9.22). Request to discharge conditions 21, 22, 23 [Phase 1] (received 8.12.22) Request to discharge conditions 21, 22, 23 [Subsequent phases] (received 3.5.23) Request to discharge condition 4 [Phasing] (received 29.2.24). Request to discharge conditions 5, 6, 9, 10, 12, 27, 36 and 39 (received 11.3.24). Request to discharge conditions 5, 12, 20 relating to Temporary Worker Accommodation (received 16.4.24). Request to discharge condition 26 (Drowning Risk Review)(received 24.5.24). Request to discharge condition 32 (Construction Phase Flood Risk & Drainage Plan)(received 30/05/2024). Request to discharge condition 28 (Landscaping for Wetlands Phase 2)(received 7.6.24). Request to discharge condition 20 (Construction Lighting Strategy)(17.06.24). Request to discharge condition 36 (Ecological mitigation, compensation and enhancement measures)(18/06/24). Request to discharge condition 32 (Phase 3 Drainage Management Plan) (28.06.24). Request to discharge condition 35 (On site emergency plan)(24.7.24) Request to discharge condition 28 (Landscaping - Phase 3)(8.8.24) Request to discharge condition 25 (Enhancement & Interpretation of Historic Environment)(8.8.24) Request to discharge condition 13 (Access Scheme, received 22/01/2025)
Havant Thicket, adjacent to Sir George Staunton Country Park, Middle Park Way, Havant
Hybrid application seeking: 1) Full Planning permission for Development of a reservoir for raw water storage, A pumped storage reservoir, with the minimum required total storage capacity of 8,700 million litres (Ml), to support the planned bulk supply transfer of at least 21Ml/d in extreme (currently defined as 1:200 year) drought conditions; Construction of an earth embankment adjacent to Staunton Country Park ; Construction of an overflow discharge/spillway at the south-western side of the reservoir and associated works; Construction of a new junction on the B2149 Manor Lodge Road and a new junction on Swanmore Road. Provision of viewing areas on the southern embankment and western edge of the reservoir. 2) Outline application for (matters to be considered outlined in Table 2.2 in the submitted Development Specification) control house partially incorporated within landscaped earth mounding adjacent to the south west embankment; together with provision of other earth embankments. Construction of a visitor centre / cafe, with storage areas and welfare facilities to the northwest of the reservoir to be used for recreational and education purposes; Provision of picnic area(s) and children's play area(s). Access routes from both junctions to the visitor car park; visitor car park comprising 193 car parking spaces and between 70 and 75 overflow spaces plus spaces for staff, coach/minibus and disabled drivers sited to the north west of the reservoir. Creation of a permanent wetland on the northern side of the reservoir and construction of bird watching hide/screen(s); recreational facilities for public amenity. Provision of perimeter tracks and a network of bridleways, cycle paths and footpaths; Construction of a slipway on the western bank of the reservoir for operational use only and a small section of the proposed pipeline (210m). (Approved 15.10.2021). Request to discharge conditions 4, 6, 9, 10, 12 (received 22.9.22). Request to discharge conditions 5, 29 (received 26.9.22). Request to discharge conditions 21, 22, 23 [Phase 1] (received 8.12.22) Request to discharge conditions 21, 22, 23 [Subsequent phases] (received 3.5.23) Request to discharge condition 4 [Phasing] (received 29.2.24). Request to discharge conditions 5, 6, 9, 10, 12, 27, 36 and 39 (received 11.3.24). Request to discharge conditions 5, 12, 20 relating to Temporary Worker Accommodation (received 16.4.24). Request to discharge condition 26 (Drowning Risk Review)(received 24.5.24). Request to discharge condition 32 (Construction Phase Flood Risk & Drainage Plan)(received 30/05/2024). Request to discharge condition 28 (Landscaping for Wetlands Phase 2)(received 7.6.24). Request to discharge condition 20 (Construction Lighting Strategy)(17.06.24). Request to discharge condition 36 (Ecological mitigation, compensation and enhancement measures)(18/06/24). Request to discharge condition 32 (Phase 3 Drainage Management Plan) (28.06.24). Request to discharge condition 35 (On site emergency plan)(24.7.24) Request to discharge condition 28 (Landscaping - Phase 3)(8.8.24) Request to discharge condition 25 (Enhancement & Interpretation of Historic Environment)(8.8.24) Request to discharge condition 13 (Access Scheme, received 22/01/2025)
Reference
APP/20/00990
Alternative references
PP-08891458
Agent
Adams Hendry Consulting Ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.