Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Gas Pressure Reducing Station, Battle Road, St Leonards-on-sea
Last published check: 21 Sept 2026, 05:47. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
Application for a Certificate of Proposed Lawful development for the replacement of the existing underground HP-MP system at Battle PRS, East Sussex, with a new above ground regulator skid, housed in a kiosk with separate filter/heat exchanger skid, new above ground boiler house and full E&I associated installation works. Additional works to replace the current redundant HP-HP heating system with new heat exchangers and package boiler house to coincide with a complete E&I upgrade of the HP-HP system to include a new combined Boiler house/Control room. When new systems are commissioned the existing underground control room will be demolished/infilled. New footpaths, site access and roadway construction to be installed as per design. Installation of Paladin 358 Security Fence around the site to replace the current chain link fence that surrounds the site.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsGas Pressure Reducing Station, Battle Road, St Leonards-on-sea
This record has no verified map location.
View council map| Document | Published | Action |
|---|---|---|
| PLAN FOR DECISIONDecision · PDF | 22 Aug 2024 | View |
| DecisionDecision · PDF | 22 Aug 2024 | View |
| FINAL DELEGATED REPORTReport · PDF | 22 Aug 2024 | View |
| DESIGN AND ACCESS STATEMENTOther · PDF | 1 Aug 2024 | View |
| PRELIMINARY ECOLOGY APPRAISALOther · PDF | 22 Jul 2024 | View |
| LOCATION PLANDrawing · PDF | 22 Jul 2024 | View |
| BLOCK PLANDrawing · PDF | 22 Jul 2024 | View |
| ELEVATIONS SHEET 1 OF 3Drawing · PDF | 22 Jul 2024 | View |
| Application FormApplication Form · PDF | 22 Jul 2024 | View |
| ELEVATIONS SHEET 2 OF 3Drawing · PDF | 22 Jul 2024 | View |
| ELEVATIONS SHEET 3 OF 3Drawing · PDF | 22 Jul 2024 | View |
| GENERAL ARRANGEMENTDrawing · PDF | 22 Jul 2024 | View |
| PROPOSED GA SHEET 4 OF 4Drawing · PDF | 22 Jul 2024 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.