ApprovedCouncil status: Decided

Construction of a new Visitor Centre on Hastings Pier for a digital archive, heritage interpretation, multifunctional education/community space (D1), shop (A1), kiosk and bar (A4) and external stairs to a roof-top viewing terrace. Construction of new substructure to support the Visitor Centre. Alterations to the Old Pavilion into a restaurant, bar and kiosk (A3, A4, A5) that provides workplace-based training and apprenticeships. The Pier has previously been granted full planning consent (HS/FA/11/00341) and listed building consent (HS/LB/11/00342 ) to carry out essential structural repairs to the pier structure, remove debris and fire damaged building remnants from above deck and install new railings.

Hastings Pier, The Pier, Hastings, TN34 1LA

Hastings Borough CouncilReference HS/LB/13/00783Listed Building Consent

Last published check: 14 Nov 2026, 16:48. Check the council record for more recent changes.

Open council website

Status and dates

Last published check: 14 Nov 2026, 16:48 (UK)

  1. DoneReceived7 Oct 2013
  2. DoneValidated7 Oct 2013
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedGRANTED PERMISSION2 Dec 2013

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (9)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Last Advertised In Press Date

    Published milestoneCouncil source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Decision Made Date

    Published milestoneCouncil source
Application type
Listed Building Consent
Ward
CASTLE Pre 18
Documents
30 published

Proposal

Construction of a new Visitor Centre on Hastings Pier for a digital archive, heritage interpretation, multifunctional education/community space (D1), shop (A1), kiosk and bar (A4) and external stairs to a roof-top viewing terrace. Construction of new substructure to support the Visitor Centre. Alterations to the Old Pavilion into a restaurant, bar and kiosk (A3, A4, A5) that provides workplace-based training and apprenticeships. The Pier has previously been granted full planning consent (HS/FA/11/00341) and listed building consent (HS/LB/11/00342 ) to carry out essential structural repairs to the pier structure, remove debris and fire damaged building remnants from above deck and install new railings.

Reference
HS/LB/13/00783
Alternative references
FO35140T
Ward
CASTLE Pre 18
Agent
dRMM Architects

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • OLD PAVILLION PROPOSED BALUSTRADEDrawing2 Apr 2015View
  • PROPOSED BALUSTRADE TYPES AND OVERALL ARRANGEMENTDrawing2 Apr 2015View
  • PROPOSED BALUSTRADEDrawing2 Apr 2015View
  • OLD PAVILION PROPOSED BALUSTRADEDrawing2 Apr 2015View
  • OLD PAVILION PROPOSED BALUSTRADEDrawing2 Apr 2015View
  • SUPPORTING STATEMENTOther2 Apr 2015View
  • DecisionDecision2 Dec 2013View
  • FINAL DELEGATED REPORTReport2 Dec 2013View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

GRANTED PERMISSION
Decision
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.