Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
15 Godwin Road, Hastings, TN35 5JR
Last published check: 28 Sept 2026, 19:43. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceAddition of round window in front gable for loft room. Addition of Velux window for loft room in front pitched roof. Rear dormer with frameless safety glass Juliette balcony. Small roof light window on dormer for ensuite. Replace UPVC double glazed windows with wood double glazed sash windows throughout. Replacement of small UPVC double glazed window in back bedroom (facing into side return) with same size wooden double glazed casement window. Replace front door with wood door in style of original Victorian front door with stained glass glazed panels. Addition of a bin store at bottom of steps in front garden (as per 11 Godwin Road) and replacement of Victorian tiles on front garden path. Replacement of UPVC French window to rear with wooden Victorian style double glazed French windows. Addition of oriel window (same dimensions as current window) in kitchen facing onto side return. Removal of rear windows in kitchen and downstairs WC and installation of Crittal style doors or bi fold doors double glazed. Replacement of door facing into garden (and opening on to a 6 foot drop) in back bedroom with Victorian style timber double glazed French windows and Victorian style wrought iron Juliette balcony. Repositioning of retaining wall in rear garden
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details15 Godwin Road, Hastings, TN35 5JR
This record has no verified map location.
View council map| Document | Published | Action |
|---|---|---|
| FINAL DELEGATED REPORTReport · PDF | 20 Jul 2022 | View |
| DecisionDecision · PDF | 20 Jul 2022 | View |
| Site NoticeSite Notice | 15 Apr 2022 | View |
| HERITAGE STATEMENTOther · PDF | 12 Apr 2022 | View |
| WASTE MINIMISATIONOther · PDF | 25 Mar 2022 | View |
| BLOCK PLANDrawing · PDF | 25 Mar 2022 | View |
| LOCATION PLANDrawing · PDF | 25 Mar 2022 | View |
| PHOTOMONTAGE - PROPOSED WORKSOther · PDF | 25 Mar 2022 | View |
| EXISTING FLOOR PLANSDrawing · PDF | 25 Mar 2022 | View |
| EXISTING ELEVATIONSDrawing · PDF | 25 Mar 2022 | View |
| PROPOSED FLOOR PLANSDrawing · PDF | 25 Mar 2022 | View |
| EXISTING SECTIONDrawing · PDF | 25 Mar 2022 | View |
| PROPOSED ELEVATIONSDrawing · PDF | 25 Mar 2022 | View |
| PROPOSED SECTIONDrawing · PDF | 25 Mar 2022 | View |
| Application FormApplication Form · PDF | 25 Mar 2022 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.