Council planning record

To replace the existing timber shop front and doors with a new timber shop front and doors. Toreplace the windows to the ground, first, second and third floors of the building with timber singleglazed sash or casement windows. The provision of a pair of timber French doors to the 1st Floorwest facing elevation of the building

1 East Parade, Hastings, TN34 3AL

DecidedReference: HS/FA/17/00167Hastings Borough Council

Last published check: 10 Oct 2026, 04:49. Check the council record for more recent changes.

Application location

1 East Parade, Hastings, TN34 3AL

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Full Planning Permission
Received
13 Mar 2017
Validated
13 Mar 2017
Determination deadline
Not published
Local authority
Hastings Borough Council

Application overview

To replace the existing timber shop front and doors with a new timber shop front and doors. Toreplace the windows to the ground, first, second and third floors of the building with timber singleglazed sash or casement windows. The provision of a pair of timber French doors to the 1st Floorwest facing elevation of the building

Proposal details

Reference
HS/FA/17/00167
Alternative references
EA75001
Ward
OLD HASTINGS

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 34 of 34

DocumentPublishedAction
OFFICERS REPORT - FINAL DELEGATED REPORTReport · PDF12 Apr 2018View
DecisionDecision · PDF12 Apr 2018View
CONSERVATION COMMENTConsultee Comment · PDF11 Apr 2018View
PROPOSED PLANSAmended Plans · PDF9 Oct 2017View
PROPOSED JOINERY DETAILAmended Plans · PDF9 Oct 2017View
WINDOWS AND DOORS SCHEDULEAmended Plans · PDF9 Oct 2017View
SITE NOTICE 2017 AMENDED PLANSOther · PDF9 Oct 2017View
SECTION DETAIL A1Drawing · PDF28 Jul 2017View
SECTION DETAIL IDrawing · PDF28 Jul 2017View
SECTION DETAIL JDrawing · PDF28 Jul 2017View
SECTION DETAIL CASEMENTDrawing · PDF28 Jul 2017View
WEST ELEVATIONDrawing · PDF28 Jul 2017View
EAST ELEVATIONDrawing · PDF28 Jul 2017View
NORTH ELEVATIONDrawing · PDF28 Jul 2017View
SECTION DETAIL ADrawing · PDF28 Jul 2017View
DRAWING SCHEDULEOther · PDF28 Jul 2017View
SECTION DETAIL E1Drawing · PDF28 Jul 2017View
SOUTH ELEVATIONDrawing · PDF28 Jul 2017View
160MM SASH SECTION DETAILS SUPERCEDEDDrawing · PDF23 Mar 2017View
144MM SASH SECTION DETAILS SUPERCEDEDDrawing · PDF23 Mar 2017View
WINDOW JOINERY SUPECEDEDBackGround Papers · PDF16 Mar 2017View
WINDOW BROCHUREBackGround Papers · PDF16 Mar 2017View
LAS FRONT PLAN ELEVATION SUPERCEDEDDrawing · PDF13 Mar 2017View
JOINERY DETAILS SUPERCEDEDDrawing · PDF13 Mar 2017View
JOINERY DETAILS 07A SUPERCEDEDDrawing · PDF13 Mar 2017View
EXISTING ELEVATIONS SUPERCEDEDDrawing · PDF13 Mar 2017View
PROPOSED ELEVATIONS SUPERCEDEDDrawing · PDF13 Mar 2017View
NUMBERED WINDOWS SUPERCEDEDDrawing · PDF13 Mar 2017View
EXISTING FIRST FLOOR PLAN SUPERCEDEDDrawing · PDF13 Mar 2017View
PROPOSED FIRST FLOOR WINDOW DOOR SUPERCEDEDDrawing · PDF13 Mar 2017View
DESIGN & ACCESS STATEMENTBackGround Papers · PDF13 Mar 2017View
BLOCK PLANDrawing · PDF13 Mar 2017View
LOCATION PLANDrawing · PDF13 Mar 2017View
APPLICATION FORMApplication Form · PDF13 Mar 2017View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Advertised In Press Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Standard Consultation Date

    Published milestoneCouncil source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Decision Made Date

    Published milestoneCouncil source
  8. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

GRANTED PERMISSION
Decision
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.