For ease of reference the condition and drawings related to the condition are listed below. 3xiv- wall type drawings GA400,401,402,403,404,405,406 3xviii- schedule of works D1009-J4-schedule of work 3xix- schedule of works D1009-J4-schedule of work 3xx- schedule of works D1009-J4-schedule of work; reflected plans GA420, 421,422, 423, 424, 425, 426 3xxi- structural engineer drawings 3213-01, 02, 03, 04, 05, 06, 07 3xxii- schedule of works D1009-J4-schedule of work 3xxiii- door schedule D1009-J4-door and frame schedule 5- door elevations CO300revC 11- door schedule D1009-J4-door and frame schedule 14i- ground floor plan GA402 14ii- lower ground plan GA401 18- skirting schedules CO500, 501 19- wall type drawings GA400,401,402,403,404,405,406 24- schedule of works D1009-J4-schedule of work Additional drawings being submitted for the sake of completeness when reviewing the schedule of work but which do not directly relate to specific conditions. GA407- roof plan GA410, 411, 412, 413, 414, 415, 416- low level electrical plans CO301- door details CO502, 503- door lining schedule CO504- architrave schedule of Listed Building Consent HS/LB/11/00230Discharge of conditions 1 - 24
For ease of reference the condition and drawings related to the condition are listed below. 3xiv- wall type drawings GA400,401,402,403,404,405,406 3xviii- schedule of works D1009-J4-schedule of work 3xix- schedule of works D1009-J4-schedule of work 3xx- schedule of works D1009-J4-schedule of work; reflected plans GA420, 421,422, 423, 424, 425, 426 3xxi- structural engineer drawings 3213-01, 02, 03, 04, 05, 06, 07 3xxii- schedule of works D1009-J4-schedule of work 3xxiii- door schedule D1009-J4-door and frame schedule 5- door elevations CO300revC 11- door schedule D1009-J4-door and frame schedule 14i- ground floor plan GA402 14ii- lower ground plan GA401 18- skirting schedules CO500, 501 19- wall type drawings GA400,401,402,403,404,405,406 24- schedule of works D1009-J4-schedule of work Additional drawings being submitted for the sake of completeness when reviewing the schedule of work but which do not directly relate to specific conditions. GA407- roof plan GA410, 411, 412, 413, 414, 415, 416- low level electrical plans CO301- door details CO502, 503- door lining schedule CO504- architrave schedule of Listed Building Consent HS/LB/11/00230Discharge of conditions 1 - 24
Reference
HS/CD/13/00298
Alternative references
WE36036
Ward
CASTLE Pre 18
Agent
John McCart Architect
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.