Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Status on council recordCouncil status: FULLREF
ABLE UK LTD TEES ROADHARTLEPOOLTS25 2DB
Last published check: 17 Oct 2026, 18:36. Check the council record for more recent changes.
We couldn’t update every section. Some information is from an earlier collection.
Last published check: 17 Oct 2026, 18:36 (UK)
Dates come from the council record. A target date passing does not confirm a decision.
Extend the current use of the site to include the construction, repair, refurbishment and decommissioning of all types of ships, vessels and other craft as described more comprehensively in the EIS. Operational development consisting of the construction of quays 1, 6, 10 and 11; refurbishment of quays 7, 8 and 9; construction of cofferdam; construction of new dock gates; installation of railway track; construction and operation of metal recycling facility; erection of industrial buildings for the manufacture of wind turbines; erection of warehouse buildings; construction of two holding tanks in connection with the drainage design; construction of sump in the dry dock basin; construction of temporary secondary clay bund in the dock basin; dredging works being carried out within the dock basin and above the low waterline and engineering works associated with the construction of the mooring bollard and sheet piling structure to protect the British Energy power station foreshore.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsThe document list could not be fully refreshed. View the council record for the complete list.
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.