England · Local authority

Hart District Council
Planning applications.

Explore collected planning applications and decisions for Hart District Council. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
893Searchable applications
291Recorded as pending
88%Approval rate · 377 approved or refused records
45Refused applications

332 approved · 45 refused · 13 withdrawn. Received dates in our records: 1 Apr 2021 to 25 Sept 2026. Most recent record check: 28 Sept 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas39 mapped area records
Article 4 direction areas47 mapped area records0 identified HMO area records; remaining records unclassified

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.

More application records

  1. Registered26/01631/TPO

    145c. Oak - Reduce lateral branches towards building by 1m to previous points148b. Holly - Reduce lateral branches overhanging site by up to 1.5m to level with boundary fence149b. Holly - Remove lower lateral branches to give 6m clearance over siteT153. Lime - Crown reduce by up to 4m, remove basal and epicormic growthT154. Lime - Crown reduce by up to 4m, remove basal and epicormic growthT155. Lime - Crown reduce by up to 4m, remove basal and epicormic growth

    General Pegasus Court Fleet Hampshire GU51 4SX

    Received 24 Sept 2026
  2. Awaiting decision26/01637/PDTEL

    Install Fixed Line Broadband Apparatus

    1 - 12 New Barn Close Fleet

    Received 25 Sept 2026
  3. Awaiting decision26/01638/PDTEL

    Install Fixed Line Broadband Apparatus

    15 New Barn Close Fleet GU51 5HU

    Received 25 Sept 2026
  4. Awaiting decision26/01639/PDTEL

    Install Fixed Line Broadband Apparatus

    31 New Barn Close Fleet GU51 5HU

    Received 25 Sept 2026
  5. Awaiting decision26/01640/PDTEL

    Install Fixed Line Broadband Apparatus

    49 New Barn Close Fleet GU51 5HU

    Received 25 Sept 2026

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Hart District Council

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Hart District Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage