Council planning record

Enlargement of first floor incorporating a new roof structure and raised elevations with additional fenestration and modification of front boundary for erection of ramp access to upper ground level

Bramble Bank Deptford Lane Greywell Hampshire RG29 1BS

RegisteredReference: 26/01569/HOUHart District Council

Last published check: 19 Sept 2026, 13:13. Check the council record for more recent changes.

Application location

Bramble Bank Deptford Lane Greywell Hampshire RG29 1BS

This record has no verified map location.

View council map

Application summary

Status
Registered
Application type
Householder Application
Received
16 Sept 2026
Validated
17 Sept 2026
Determination deadline
12 Nov 2026
Local authority
Hart District Council

Application overview

Enlargement of first floor incorporating a new roof structure and raised elevations with additional fenestration and modification of front boundary for erection of ramp access to upper ground level

Proposal details

Reference
26/01569/HOU
Alternative references
PP-15122627
Ward
Odiham
Parish
Greywell
Agent
AFA Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 15 of 15

DocumentPublishedAction
SITE SURVEYPlans · PDF17 Sept 2026View
PROPOSED SECTIONPlans · PDF17 Sept 2026View
LOCATION PLANLocation Plan17 Sept 2026View
APPLICATIONFORMREDACTEDApplication Form · PDF16 Sept 2026View
PROPOSED AXONOMETRICPlans · PDF16 Sept 2026View
EXISTING AXONOMETRICPlans · PDF16 Sept 2026View
EXISTING PLANS AND ELEVATIONSPlans · PDF16 Sept 2026View
PROPOSED PLANS AND ELEVATIONSPlans · PDF16 Sept 2026View
EXISTING PLANSPlans · PDF16 Sept 2026View
PROPOSED PLANS AND ELEVATIONSPlans · PDF16 Sept 2026View
PROPOSED PLANSPlans · PDF16 Sept 2026View
EXISTING PLANS AND ELEVATIONSPlans · PDF16 Sept 2026View
BLOCK PLANBlock Plan16 Sept 2026View
PRELIMINARY ROOST ASSESSMENT (PRA)Report · PDF16 Sept 2026View
DESIGN AND ACCESS STATEMENTReport · PDF16 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.