Council planning record

To replace timber with a non combustible alternative up to the 2nd floor level (the first seven levels of tile from the first floor up. Install cavity barriers to compartment floor slab edges behind all infill/spandrel panels. Install cavity barriers to compartment floor slab edges within the cement particle board cladding to projecting bay windows. Internal fire stopping to be installed / replaced to cables passing between walls

Flat Block 5 To 9 Holland Way Newhall Harlow Essex CM17 9NN

UnknownReference: HW/LDCP/26/00290Harlow District Council

Last published check: 15 Sept 2026, 07:47. Check the council record for more recent changes.

Application location

Flat Block 5 To 9 Holland Way Newhall Harlow Essex CM17 9NN

This record has no verified map location.

View council map

Application summary

Status
Unknown
Application type
Lawful Development Cert - Proposed
Received
27 Jul 2026
Validated
27 Jul 2026
Determination deadline
21 Sept 2026
Local authority
Harlow District Council

Application overview

To replace timber with a non combustible alternative up to the 2nd floor level (the first seven levels of tile from the first floor up. Install cavity barriers to compartment floor slab edges behind all infill/spandrel panels. Install cavity barriers to compartment floor slab edges within the cement particle board cladding to projecting bay windows. Internal fire stopping to be installed / replaced to cables passing between walls

Proposal details

Reference
HW/LDCP/26/00290
Alternative references
PP-15106628
Ward
Newhall
Agent
Stoneguard Projects Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 10 of 10

DocumentPublishedAction
Officer ReportOfficer Report · PDF14 Sept 2026View
DECISION NOTICE - CERT PROPOSED 192 GTDDecision Notice · PDF14 Sept 2026View
WALL TYPE EW7 SOFFIT PANELDrawing · PDF29 Jul 2026View
SCOPE & WALL TYPE REFERENCE ELEVATIONSDrawing · PDF29 Jul 2026View
WALL TYPE EW5 REV C01 EXISTING & PROPOSEDDrawing · PDF29 Jul 2026View
WALL TYPE EW5 PROPOSED SECTION DETAIL AT SLAB EDGEDrawing · PDF29 Jul 2026View
WALL TYPE EW6 EXISTING & PROPOSEDDrawing · PDF29 Jul 2026View
WALL TYPE EW6 PROPOSED SECTION DETAIL AT SLAB EDGEDrawing · PDF29 Jul 2026View
LOCATION PLANDrawing · PDF29 Jul 2026View
APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form Redacted · PDF27 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Decision Made Date

    Published milestoneCouncil source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Would Be Lawful Use/Development
DECISION NOTICE - CERT PROPOSED 192 GTD
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.