Status on council recordCouncil status: Decided

Adjoining authority consultation from Knowsley MBC for approval of reserved matters pursuant to permission 20/00494/HYB (hybrid planning application comprising: full application for the development of 161,900 sq ft (15,041 sq m) (gia) of storage and distribution floorspace (use class b8), including ancillary offices (use class b1), security gatehouse, site access road, engineering earthworks to form a part country park, public car park to serve country park, and associated works; and outline application with details of point of access (details of part-access, landscaping, appearance, scale and layout are reserved) for the development of up to 838,100 sq ft (77,862 sq m) (gia) of storage and distribution floorspace (use class b8), with ancillary offices and light industrial (use class b1); engineering earthworks to form country park and drainage attenuation ponds; pedestrian/cycle/equestrian route connecting existing m62 footbridge with proposed country park; and associated works) - approval sought for (scale, access, appearance, layout and landscaping) at

Former Site Of Cronton Colliery Cronton Road Cronton Knowsley L35 1QR

Halton Borough CouncilReference 22/00170/ADJConsultation by Adjoining Authority

Last published check: 29 Oct 2026, 02:57. Check the council record for more recent changes.

Status and dates

Last published check: 29 Oct 2026, 02:57 (UK)

  1. DoneReceived30 Mar 2022
  2. DoneValidated30 Mar 2022
  3. ClosedConsultationEnded 28 Apr 2022
  4. Date set by councilTarget decision date20 Apr 2022
  5. DecidedNo Objection to19 Aug 2022

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (8)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Decision Made Date

    Published milestoneCouncil source
Application type
Consultation by Adjoining Authority
Ward
Adjoining Authority Consultation
Parish
No Parish
Documents
2 published

Proposal

Adjoining authority consultation from Knowsley MBC for approval of reserved matters pursuant to permission 20/00494/HYB (hybrid planning application comprising: full application for the development of 161,900 sq ft (15,041 sq m) (gia) of storage and distribution floorspace (use class b8), including ancillary offices (use class b1), security gatehouse, site access road, engineering earthworks to form a part country park, public car park to serve country park, and associated works; and outline application with details of point of access (details of part-access, landscaping, appearance, scale and layout are reserved) for the development of up to 838,100 sq ft (77,862 sq m) (gia) of storage and distribution floorspace (use class b8), with ancillary offices and light industrial (use class b1); engineering earthworks to form country park and drainage attenuation ponds; pedestrian/cycle/equestrian route connecting existing m62 footbridge with proposed country park; and associated works) - approval sought for (scale, access, appearance, layout and landscaping) at

Reference
22/00170/ADJ
Alternative references
30.03.22 Former Cronton Colliery
Ward
Adjoining Authority Consultation
Parish
No Parish

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Consultation Letter.pdfApplication Form1 Apr 2022View
  • Location Plan.pdfPlans1 Apr 2022View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

No Objection to
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.