Council planning record

Application under Section 73 of the Town and Country Planning Act 1990 to vary conditions 7, 8 and 10 of permission 21/00448/S73 (Application under Section 73 of the Town and Country Planning Act 1990 to vary condition 2 of permission 18/00567/FULEIA (Proposed demolition of existing workshop, lean-to shed and picking line enclosure, and the erection of 2 no. buildings to provide for the storage and sorting of waste together with external storage bays and ancillary infrastructure including substation, water tanks and weighbridge to provide operational improvements, environmental control and an increase in waste accepted from an existing 300,000 tonnes to 450,000 tonnes per annum) in order to make amendments to the location of the air management system and subsequent alterations to Drawings 183131/WTS/PL/004, 183131/WTS/PL/005A and 183131/WTS/PL/005B accommodating minor revision to site layout and elevations) in order to amend the phasing of the submissions to discharge pre-commencement conditions to enable the construction of the fence lines to be progressed at

Widnes Skip And Reclaim Ditton Road (west) Widnes Cheshire WA8 0PA

DecidedReference: 22/00163/S73Halton Borough Council

Last published check: 29 Sept 2026, 00:04. Check the council record for more recent changes.

Application location

Widnes Skip And Reclaim Ditton Road (west) Widnes Cheshire WA8 0PA

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Appl for non compliance with conditions
Received
25 Mar 2022
Validated
29 Mar 2022
Determination deadline
24 May 2022
Local authority
Halton Borough Council

Application overview

Application under Section 73 of the Town and Country Planning Act 1990 to vary conditions 7, 8 and 10 of permission 21/00448/S73 (Application under Section 73 of the Town and Country Planning Act 1990 to vary condition 2 of permission 18/00567/FULEIA (Proposed demolition of existing workshop, lean-to shed and picking line enclosure, and the erection of 2 no. buildings to provide for the storage and sorting of waste together with external storage bays and ancillary infrastructure including substation, water tanks and weighbridge to provide operational improvements, environmental control and an increase in waste accepted from an existing 300,000 tonnes to 450,000 tonnes per annum) in order to make amendments to the location of the air management system and subsequent alterations to Drawings 183131/WTS/PL/004, 183131/WTS/PL/005A and 183131/WTS/PL/005B accommodating minor revision to site layout and elevations) in order to amend the phasing of the submissions to discharge pre-commencement conditions to enable the construction of the fence lines to be progressed at

Proposal details

Reference
22/00163/S73
Alternative references
PP-11145245
Ward
Central & West Bank
Parish
No Parish
Agent
AA Environmental Limited

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 4 of 4

DocumentPublishedAction
2200163S73.pdfDecision / Officer Report · PDF23 May 2022View
Amended - 183131 Supporting Planning Statement - variation 2503.pdfSupporting Documents · PDF30 Mar 2022View
Amended - Second Amended ApplicationFormRedacted.pdfApplication Form · PDF30 Mar 2022View
Amended - 183131 Project Technical Note - Land Contamination 210322.pdfSupporting Documents · PDF30 Mar 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  5. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Decision Issued Date

    Published milestoneCouncil source
  8. Decision Made Date

    Published milestoneCouncil source
  9. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approved
2200163S73.pdf

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.