Council planning record

Proposed installation of below ground swimming pool and renovation of existing outdoor toilet block at

Manor House Church End Hale Village L24 4AX

DecidedReference: 20/00382/FULHalton Borough Council

Last published check: 2 Oct 2026, 14:02. Check the council record for more recent changes.

Application location

Manor House Church End Hale Village L24 4AX

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Full Application
Received
28 Jul 2020
Validated
30 Jul 2020
Determination deadline
24 Sept 2020
Local authority
Halton Borough Council

Application overview

Proposed installation of below ground swimming pool and renovation of existing outdoor toilet block at

Proposal details

Reference
20/00382/FUL
Alternative references
PP-28.07.20 Manor House L24 4AX
Ward
Hale
Parish
Hale

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 14 of 14

DocumentPublishedAction
2000382FUL.pdfDecision / Officer Report · PDF25 Mar 2021View
Amended - heritage-concrete-paving-installation-details-november-2020.pdfApplication Correspondence · PDF3 Feb 2021View
Amended - 20.1028 SU (00) 004 existing site plan.pdfPlans · PDF3 Feb 2021View
Amended - heritage-riven-garden-paving.pdfApplication Correspondence · PDF3 Feb 2021View
Amended - 20.1028 SU (00) 003 location plan.pdfPlans · PDF3 Feb 2021View
Amended - Heritage Statement - Manor House.pdfApplication Correspondence · PDF3 Feb 2021View
Amended - Mixing-and-Laying-to-Maintain-Consistency.pdfApplication Correspondence · PDF3 Feb 2021View
Amended - 20.1028 SK (00) 003 proposed site plan.pdfPlans · PDF3 Feb 2021View
Amended - Product-Datasheet-for-Moderate-Hydraulic-Lime-Mortar.pdfApplication Correspondence · PDF3 Feb 2021View
Amended - 20.1028 SK (00) 005 existing and proposed privy plans and elevations.pdfPlans · PDF3 Feb 2021View
Amended - The Manor House - pool perimeter path.pdfApplication Correspondence · PDF3 Feb 2021View
Amended - Lime Mortar Repointing (1).pdfApplication Correspondence · PDF3 Feb 2021View
Application for Planning Permission_Redated.pdfApplication Form · PDF30 Jul 2020View
Outbuilding at the Manor House 21 Church End Hale.pdfApplication Correspondence · PDF30 Jul 2020View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Standard Consultation Date

    Published milestoneCouncil source
  5. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  6. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Decision Issued Date

    Published milestoneCouncil source
  9. Decision Made Date

    Published milestoneCouncil source

Decision & conditions

Approved
2000382FUL.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.