Council planning record

Application for Listed Building Consent for installation of 4 no. air conditioning units within the observatory together with 4 no. external units flush against the cladding between the observatory and the original building together with pipework and wiring etc. at

Catalyst Museum Mersey Road Widnes Cheshire WA8 0DF

DecidedReference: 18/00612/LBCHalton Borough Council

Last published check: 8 Oct 2026, 11:38. Check the council record for more recent changes.

Application location

Catalyst Museum Mersey Road Widnes Cheshire WA8 0DF

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Listed Building Consent
Received
14 Dec 2018
Validated
14 Dec 2018
Determination deadline
8 Feb 2019
Local authority
Halton Borough Council

Application overview

Application for Listed Building Consent for installation of 4 no. air conditioning units within the observatory together with 4 no. external units flush against the cladding between the observatory and the original building together with pipework and wiring etc. at

Proposal details

Reference
18/00612/LBC
Alternative references
PP-07455954
Ward
Riverside
Parish
No Parish

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 12 of 12

DocumentPublishedAction
1800612LBC_12022019_151914.pdfDecision / Officer Report · PDF12 Feb 2019View
Catalyst Design and Access Statement(1).pdfApplication Correspondence · PDF18 Dec 2018View
Catalyst Heritage Statement(3).pdfApplication Correspondence · PDF18 Dec 2018View
W Elevation of upper part of Catalyst Tower Building.pdfPlans · PDF18 Dec 2018View
AC Units Internal and External Specs Fujitsu.pdfApplication Correspondence · PDF18 Dec 2018View
Plan of Observatory.pdfPlans · PDF18 Dec 2018View
ApplicationFormNoPersonalData.pdfApplication Form · PDF18 Dec 2018View
Images of Observatory annotated to show example location of AC Unit(1).pdfApplication Correspondence · PDF18 Dec 2018View
E Elevation of upper part of Catalyst Tower Building.pdfPlans · PDF18 Dec 2018View
Catalyst-Museum_Location Plan 2018.pdfPlans · PDF18 Dec 2018View
Photgraphs of internal and external locations.pdfApplication Correspondence · PDF18 Dec 2018View
1800612LBC.pdfWeb · PDF1 Jan 1901View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Decision Made Date

    Published milestoneCouncil source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approved
1800612LBC_12022019_151914.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.