Council planning record

Application under Section 73 of the Town and Country Planning Act 1990 to amend Condition 1 of the Planning Inspectorate Decision dated 5/3/14 (App/D0650/A/13/2201280) which restricts the amount of fuel delivered by road to 480,000 tonnes in any 12 month period to read as follows: The total number of HGV's associated with the operation of the permitted energy recovery facility (waste importation and the exportation of incinerator bottom ash and air pollution control residues) shall not exceed 1930 movements (965 in and 965 out) in any calendar week and shall not exceed a maximum of 386 movements (193 in and 193 out) in any single day, at

Runcorn Energy From Waste Facility Barlow Way Off Picow Farm Road Runcorn Cheshire WA7 4HG

DecidedReference: 18/00417/S73Halton Borough Council

Last published check: 8 Oct 2026, 19:08. Check the council record for more recent changes.

Application location

Runcorn Energy From Waste Facility Barlow Way Off Picow Farm Road Runcorn Cheshire WA7 4HG

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Appl for non compliance with conditions
Received
21 Aug 2018
Validated
21 Aug 2018
Determination deadline
20 Nov 2018
Local authority
Halton Borough Council

Application overview

Application under Section 73 of the Town and Country Planning Act 1990 to amend Condition 1 of the Planning Inspectorate Decision dated 5/3/14 (App/D0650/A/13/2201280) which restricts the amount of fuel delivered by road to 480,000 tonnes in any 12 month period to read as follows: The total number of HGV's associated with the operation of the permitted energy recovery facility (waste importation and the exportation of incinerator bottom ash and air pollution control residues) shall not exceed 1930 movements (965 in and 965 out) in any calendar week and shall not exceed a maximum of 386 movements (193 in and 193 out) in any single day, at

Proposal details

Reference
18/00417/S73
Alternative references
PP-07147698
Ward
Heath
Parish
No Parish
Agent
SLR Consulting Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 41 of 41

DocumentPublishedAction
1800417S73_06022019_153608.pdfDecision / Officer Report · PDF6 Feb 2019View
Drawing_5A13.pdfPlans · PDF29 Aug 2018View
402.00036.00824.16.DWGA2.0 Site Plan-SLR_Copyright-DPB.pdfPlans · PDF29 Aug 2018View
Drawing_5A5.pdfPlans · PDF29 Aug 2018View
0007 ES_Chapter 7_Noise_Final.pdfApplication Correspondence · PDF29 Aug 2018View
0016 Planning Statement_Final.pdfApplication Correspondence · PDF29 Aug 2018View
Drawing_5A8.pdfPlans · PDF29 Aug 2018View
00036.00824.8.2.0 Non-Statutory Sites.mxd.pdfPlans · PDF29 Aug 2018View
0005 ES_Chapter_5_Air Quality_Final(1).pdfApplication Correspondence · PDF29 Aug 2018View
402.00036.00824.16.DWGA3.0 Aerial_SLR_Copyright-DPB.pdfPlans · PDF29 Aug 2018View
Drawing_5A6.pdfPlans · PDF29 Aug 2018View
0008 ES_ Chapter_8 _Ecology_Final.pdfApplication Correspondence · PDF29 Aug 2018View
0014 ES_ Appendix 9.1_Carbon Final.pdfApplication Correspondence · PDF29 Aug 2018View
Drawing_5A9.pdfPlans · PDF29 Aug 2018View
ApplicationFormNoPersonalData.pdfApplication Form · PDF29 Aug 2018View
0017 Planning Statement Appendix A - Halton pre-app and scoping response.pdfApplication Correspondence · PDF29 Aug 2018View
402.00036.00824.16.DWGA1.0 Site Location-SLR_Copyright-DPB.pdfPlans · PDF29 Aug 2018View
0006 ES_ Chapter 6_Transport_Final.pdfApplication Correspondence · PDF29 Aug 2018View
0015 ES_ NonTechnical Summary_Final(1).pdfApplication Correspondence · PDF29 Aug 2018View
Drawing_5A7.pdfPlans · PDF29 Aug 2018View
0009 ES_Chapter 9_Carbon_Final.pdfApplication Correspondence · PDF29 Aug 2018View
0001 ES_Chapter 1 Introduction_Final.pdfApplication Correspondence · PDF29 Aug 2018View
00036.00824.8.1.0 Statutory Sites.pdfPlans · PDF29 Aug 2018View
0018 Planning Statement Appendix B.pdfApplication Correspondence · PDF29 Aug 2018View
0004 ES-Chapter 4 Policy_Final(2).pdfApplication Correspondence · PDF29 Aug 2018View
Drawing_5A2.pdfPlans · PDF29 Aug 2018View
0010 ES_ Chapter_10 Other Env Impacts_Final.pdfApplication Correspondence · PDF29 Aug 2018View
Drawing_5A11.pdfPlans · PDF29 Aug 2018View
0013 ES_ Appendix 8_1_HRA_Final.pdfApplication Correspondence · PDF29 Aug 2018View
0019 Planning Statement Appendix C_issue.pdfApplication Correspondence · PDF29 Aug 2018View
0002 ES_Chapter 2_Site and Surrounds_Final.pdfApplication Correspondence · PDF29 Aug 2018View
Drawing_5A3.pdfPlans · PDF29 Aug 2018View
0011 ES_Chapter_11_Conclusions_Final.pdfApplication Correspondence · PDF29 Aug 2018View
Drawing_5A12.pdfPlans · PDF29 Aug 2018View
0020 Covering Letter to HBC_Final.pdfApplication Correspondence · PDF29 Aug 2018View
Drawing_5A4.pdfPlans · PDF29 Aug 2018View
Drawing_5A1.pdfPlans · PDF29 Aug 2018View
0003 ES_Chapter 3_ Description of Development_Final.pdfApplication Correspondence · PDF29 Aug 2018View
Drawing_5A10.pdfPlans · PDF29 Aug 2018View
0012 ES_Appendix 5-1_AQA Final.pdfApplication Correspondence · PDF29 Aug 2018View
1800417S73.pdfWeb · PDF1 Jan 1901View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Actual Committee Date

    Published milestoneCouncil source
  8. Decision Issued Date

    Published milestoneCouncil source
  9. Decision Made Date

    Published milestoneCouncil source
  10. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  11. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approved
1800417S73_06022019_153608.pdf

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.