Council planning record

Proposed installation of 25kwp solar PV array to the roof of the education / visitor services building, the installation of 5 no. floor mounted air conditioning units in the observatory and the mounting of external air conditioning fan units on the North wall of the tower (including removal of existing units) at

Catalyst Museum Mersey Road Widnes Cheshire WA8 0DF

DecidedReference: 17/00358/LBCHalton Borough Council

Application location

Catalyst Museum Mersey Road Widnes Cheshire WA8 0DF

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Listed Building Consent
Received
21 Jun 2017
Validated
14 Jul 2017
Determination deadline
8 Sept 2017
Local authority
Halton Borough Council

Application overview

Proposed installation of 25kwp solar PV array to the roof of the education / visitor services building, the installation of 5 no. floor mounted air conditioning units in the observatory and the mounting of external air conditioning fan units on the North wall of the tower (including removal of existing units) at

Proposal details

Reference
17/00358/LBC
Alternative references
PP-06183311
Ward
Riverside
Parish
No Parish

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 20 of 20

DocumentPublishedAction
1700358LBC_31082017_163321.pdfDecision / Officer Report · PDF31 Aug 2017View
Catalyst-Museum_Location Plan 2017.pdfPlans · PDF19 Jul 2017View
Image of Observatory Annotated to show Example Location of AC Unit(1).pdfApplication Correspondence · PDF19 Jul 2017View
Cross section of New Building.pdfPlans · PDF19 Jul 2017View
Catalyst Heritage Statement(1).pdfApplication Correspondence · PDF19 Jul 2017View
Phot0 no1 of Observatory showing existing railing.pdfApplication Correspondence · PDF19 Jul 2017View
North Elevation of Tower Building Showing Position of the External AC units.pdfPlans · PDF19 Jul 2017View
Catalyst Solar Panels Specs.pdfApplication Correspondence · PDF19 Jul 2017View
Photo of New Building Roof as current.pdfApplication Correspondence · PDF19 Jul 2017View
Plan of New Building Roof Showing Location of Solar Panels.pdfPlans · PDF19 Jul 2017View
Catalyst Design and Access Statement.pdfApplication Correspondence · PDF19 Jul 2017View
Sketch of external condenser Installation method Catalyst.pdfPlans · PDF19 Jul 2017View
Unistrut fixing for external condensor umits.pdfApplication Correspondence · PDF19 Jul 2017View
Photo.pdfApplication Correspondence · PDF19 Jul 2017View
Plan of Observatory with notes re new AC units.pdfPlans · PDF19 Jul 2017View
ApplicationFormNoPersonalData.pdfApplication Form · PDF19 Jul 2017View
WS010_Roof-bracket-TR-fix_MA-140514-1WA20419[4].pdfApplication Correspondence · PDF19 Jul 2017View
AC Units Internal and External Unit Specs Mitsubishi MFZ-KJ50VE_PI_Sheet.pdfApplication Correspondence · PDF19 Jul 2017View
Projection of whole site from Spike Island with annotations.pdfPlans · PDF19 Jul 2017View
1700358LBC.pdfWeb · PDF1 Jan 1901View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  5. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Decision Made Date

    Published milestoneCouncil source
  8. Decision Issued Date

    Published milestoneCouncil source
  9. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approved
1700358LBC_31082017_163321.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.