Council planning record

Application to discharge Condition No. 3 of Planning Permission 15/00430/FUL at

The Former Marley Eternit Site Derby Road Widnes Cheshire WA8 9NQ

DecidedReference: 17/00324/CONDHalton Borough Council

Application location

The Former Marley Eternit Site Derby Road Widnes Cheshire WA8 9NQ

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
App made under condition
Received
4 Jul 2017
Validated
5 Jul 2017
Determination deadline
30 Aug 2017
Local authority
Halton Borough Council

Application overview

Application to discharge Condition No. 3 of Planning Permission 15/00430/FUL at

Proposal details

Reference
17/00324/COND
Alternative references
PP-06202196
Ward
Farnworth
Parish
No Parish

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 477 of 477

DocumentPublishedAction
1700324COND_06102017_144002.pdfDecision / Officer Report · PDF6 Oct 2017View
10-218-8c - Response to EA - Derby Road - 13-09-17.pdfApplication Correspondence · PDF21 Sept 2017View
weather station data 03-03-17 to 10-03-17.pdfApplication Correspondence · PDF12 Sept 2017View
10147 015 As-Built Survey Rev D-Sheet 1.pdfPlans · PDF12 Sept 2017View
Weather Station Data 19-08-2016-26-08-16 16.50pm.pdfApplication Correspondence · PDF12 Sept 2017View
weather station data 29-10-16 - 04-11-16.pdfApplication Correspondence · PDF12 Sept 2017View
12. 10147 006 Cut Fill Grid Bellway Scheme.pdfPlans · PDF12 Sept 2017View
Marley Chemical Sample Schedule.pdfApplication Correspondence · PDF12 Sept 2017View
30018_9_3C_External Works Layout.pdfPlans · PDF12 Sept 2017View
1b. Site Location Plan & Aerial View.pdfPlans12 Sept 2017View
weather station data 20-07-2016 - 05-08-2016.pdfApplication Correspondence · PDF12 Sept 2017View
weather station data 22-10-16 - 28-10-16.pdfApplication Correspondence · PDF12 Sept 2017View
9a. 10147 003 Existing Site Topographical Survey Rev A-Sheet1.pdfPlans · PDF12 Sept 2017View
weather station data 03-04-17 to 08-04-17.pdfApplication Correspondence · PDF12 Sept 2017View
weather station data 27-03-17 to 01-04-17.pdfApplication Correspondence · PDF12 Sept 2017View
6. 10218 - 004 - Exploratory Hole Location.pdfPlans · PDF12 Sept 2017View
EA Marley comments - May 16.pdfApplication Correspondence · PDF12 Sept 2017View
Marley Gas Monitoring Results.pdfApplication Correspondence · PDF12 Sept 2017View
Weather Station Data 08-12-16 - 13-12-16.pdfApplication Correspondence · PDF12 Sept 2017View
10147 - Marley Eternit Phase 2 MMP Form Aug 2017.pdfApplication Correspondence · PDF12 Sept 2017View
weather station data 11-01-17 to 18-01-17.pdfApplication Correspondence · PDF12 Sept 2017View
weather station data 20-02 -17 to 25-02-17.pdfApplication Correspondence · PDF12 Sept 2017View
7. Depth of Made Ground Plan.pdfPlans · PDF12 Sept 2017View
weather station data 13-12-16 to 20-12-16.pdfApplication Correspondence · PDF12 Sept 2017View
30018_9_4D_External Works Layout.pdfPlans · PDF12 Sept 2017View
SEM-Fibre-Counting-Form-124451-samples-124451.pdfApplication Correspondence · PDF12 Sept 2017View
Weather Station Data 20-07-2016 - 05-08-2016 (1).pdfApplication Correspondence · PDF12 Sept 2017View
weather station data 24-04-17 to 29-04-17.pdfApplication Correspondence · PDF12 Sept 2017View
Marley - May 2016.pdfApplication Correspondence · PDF12 Sept 2017View
weather station data 03-01-17 to 10-01-17.pdfApplication Correspondence · PDF12 Sept 2017View
Weather station data 04-01-17 to 11-02-17.pdfApplication Correspondence · PDF12 Sept 2017View
Weather station data 19.09.2016 - 24-09-2016.pdfApplication Correspondence · PDF12 Sept 2017View
10-218-r5 - E3P Materials Management Plan - Derby Road.pdfApplication Correspondence · PDF12 Sept 2017View
Weather Station Data 15-08-2016 - 19-08-2016.pdfApplication Correspondence · PDF12 Sept 2017View
Weather Station Data 19-08-2016-26-08-16 16.50pm (1).pdfApplication Correspondence · PDF12 Sept 2017View
weather station data 28-12-16 to 03-01-17.pdfApplication Correspondence · PDF12 Sept 2017View
Weather Station Data 08-12-16 to 02-02-17.pdfApplication Correspondence · PDF12 Sept 2017View
10147 - Marley Eternit Phase 2 Schedule of Drawings Aug 2017.pdfPlans · PDF12 Sept 2017View
30018_9_2D_External Works Layout.pdfPlans · PDF12 Sept 2017View
SEM-Fibre-Counting-Form-124451---Certifica.pdfApplication Correspondence · PDF12 Sept 2017View
1a. Site Location .pdfPlans · PDF12 Sept 2017View
8. Contamination Plan.pdfPlans · PDF12 Sept 2017View
CLAIRE Declaration.pdfApplication Correspondence · PDF12 Sept 2017View
Weather Station Data 15-08-2016 - 19-08-2016 (1).pdfApplication Correspondence · PDF12 Sept 2017View
lucion_reports_124451.pdfApplication Correspondence · PDF12 Sept 2017View
5. Current Site Layout.pdfPlans · PDF12 Sept 2017View
THE FORMER MARLEY ETERNIT SITE - July 17.pdfApplication Correspondence · PDF12 Sept 2017View
9c. 10147 003 Existing Site Topographical Survey Rev A-Sheet3.pdfPlans · PDF12 Sept 2017View
Weather Station Data 05-11-16 - 11-11-16.pdfApplication Correspondence · PDF12 Sept 2017View
Weather Station Data 13-09-2016-16-09-2016 5.00pm.pdfApplication Correspondence · PDF12 Sept 2017View
weather station data 20-03-17 to 24-03-17.pdfApplication Correspondence · PDF12 Sept 2017View
SEM-Fibre-Counting-Form-124451-revised-26.05..pdfApplication Correspondence · PDF12 Sept 2017View
SEM-Fibre-Counting-Form-124451-samples-12 (3).pdfApplication Correspondence · PDF12 Sept 2017View
3. Historical Features Plan.pdfPlans · PDF12 Sept 2017View
10147- Marley Eternit Phase 2 MMP docs ref 1-7 Aug 2017.pdfApplication Correspondence · PDF12 Sept 2017View
Weather Station Data 12-09-2016 - 17-09-2016.pdfApplication Correspondence · PDF12 Sept 2017View
Weather Station Data 26.09.2016 - 30.09.2016.pdfApplication Correspondence · PDF12 Sept 2017View
Marley Eternit Remedial Strategy Comments.pdfApplication Correspondence · PDF12 Sept 2017View
10b. PLAN_MARLEY rev A colour.pdfPlans · PDF12 Sept 2017View
Weather station Data 01-09-2016 - 11-09-2016.pdfApplication Correspondence · PDF12 Sept 2017View
View registration WEX081022.pdfApplication Correspondence · PDF12 Sept 2017View
Weather station data 02-09-2016-13-09-2016 9.00am.pdfApplication Correspondence · PDF12 Sept 2017View
weather station data 18-01-17 to 25-01-17.pdfApplication Correspondence · PDF12 Sept 2017View
Weather Station Data 21-08-16 - 31-08-2016.pdfApplication Correspondence · PDF12 Sept 2017View
10147 015 As-Built Survey Rev D-Sheet 2.pdfPlans · PDF12 Sept 2017View
Weather Station Data 05-08-2016 - 15-08-2016 (3).pdfApplication Correspondence · PDF12 Sept 2017View
SEM-Fibre-Counting-Form-124451-samples-12 (1).pdfApplication Correspondence · PDF12 Sept 2017View
1c. PLAN_Location Plan Marley rev B_.pdfPlans · PDF12 Sept 2017View
4. 1949 Historic Site Works Plan.pdfPlans · PDF12 Sept 2017View
Weather Station Data 01-10-2016 - 15-10-2016.pdfApplication Correspondence · PDF12 Sept 2017View
weather station data 13-02 -17 to 17-02-17.pdfApplication Correspondence · PDF12 Sept 2017View
30018_9_1E_External Works Layout.pdfPlans · PDF12 Sept 2017View
weather station data 18-04-17 to 22-04-17.pdfApplication Correspondence · PDF12 Sept 2017View
9b. 10147 003 Existing Site Topographical Survey Rev A-Sheet2.pdfPlans · PDF12 Sept 2017View
Weather Station Data 26-08-2016 - 02-09-2016 16.50pm.pdfApplication Correspondence · PDF12 Sept 2017View
Marley March 16.pdfApplication Correspondence · PDF12 Sept 2017View
Weather Station Data 05-08-2016 - 15-08-2016.pdfApplication Correspondence · PDF12 Sept 2017View
10a. Planning Layout.pdfPlans · PDF12 Sept 2017View
weather station data 21-12-16 to 27-12-16.pdfApplication Correspondence · PDF12 Sept 2017View
SEM-Fibre-Counting-Form-124451-samples-12 (2).pdfApplication Correspondence · PDF12 Sept 2017View
2. Historical Maps of Site.pdfPlans · PDF12 Sept 2017View
10147 019 Box Cut Locations-Sheet 1.pdfPlans · PDF12 Sept 2017View
Weather Station Data 11-10-16 - 14-10-16.pdfApplication Correspondence · PDF12 Sept 2017View
weather station data 13-03-17 to 17-03-17.pdfApplication Correspondence · PDF12 Sept 2017View
weather station data 25-01-17 to 02-02-17.pdfApplication Correspondence · PDF12 Sept 2017View
Marley Eternit Comments 14-06-16.pdfApplication Correspondence · PDF12 Sept 2017View
weather station data 27-02 -17 to 03-03-17.pdfApplication Correspondence · PDF12 Sept 2017View
Weather station data 02-01-17 to 04-02-17.pdfApplication Correspondence · PDF12 Sept 2017View
Weather station data 15-10-16 - 21-10-16.pdfApplication Correspondence · PDF12 Sept 2017View
lucion_air_cert_26861.pdfApplication Correspondence · PDF11 Sept 2017View
16-33019-1 Hotspot 5 Arisings s1-s3.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_29741.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_27378.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_24077.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_22881.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_28473.pdfApplication Correspondence · PDF11 Sept 2017View
16-27740-1 Tank Test Day 0.25.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_32135.pdfApplication Correspondence · PDF11 Sept 2017View
10147 019 Box Cut Locations Sheet 1.pdfPlans · PDF11 Sept 2017View
17-38921-1 Site Won Sandstone 81-85.pdfApplication Correspondence · PDF11 Sept 2017View
16-27172-1 CC1 41-43 Leachate.pdfApplication Correspondence · PDF11 Sept 2017View
10-218-005 - Targeted Features Plan.pdfPlans · PDF11 Sept 2017View
lucion_air_cert_32141.pdfApplication Correspondence · PDF11 Sept 2017View
16-29626 1 Natural Spot Checks C E.pdfApplication Correspondence · PDF11 Sept 2017View
16-26702-1 Site won subsoil 1- 20.pdfApplication Correspondence · PDF11 Sept 2017View
10147-008 - Remediation Works Plan.pdfPlans · PDF11 Sept 2017View
16-34209-1 CC6-2.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_26858.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_21861.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_27679.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_31102.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_24372.pdfApplication Correspondence · PDF11 Sept 2017View
16-29058-1 Site won sandstone 41-50.pdfApplication Correspondence · PDF11 Sept 2017View
17-40549-1 Tank Test Day 1.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_27924.pdfApplication Correspondence · PDF11 Sept 2017View
10-218-017 - Gas Monitoring Location Plan.pdfPlans · PDF11 Sept 2017View
16-28853-1 B3 SVOC leachate.pdfApplication Correspondence · PDF11 Sept 2017View
17-42066-1 C 14 15.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_31132.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_32466.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_22883.pdfApplication Correspondence · PDF11 Sept 2017View
17-40251-1 Field Test 2 UCS 9.4 Nmm2.pdfApplication Correspondence · PDF11 Sept 2017View
16-27160-1 MGC Leachate 13-16.pdfApplication Correspondence · PDF11 Sept 2017View
16-27745-1 Tank Test Day 4.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_28857.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_32144.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_25478.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_23220.pdfApplication Correspondence · PDF11 Sept 2017View
10147-012 - Material Tracking And Sampling Grid.pdfPlans · PDF11 Sept 2017View
lucion_air_cert_31129.pdfApplication Correspondence · PDF11 Sept 2017View
16-27399-1 Hotspot 1 Arising's.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_26021.pdfApplication Correspondence · PDF11 Sept 2017View
16-28243-1 MGC 5 6 1.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_23674.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_26864.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_29744.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_27011.pdfApplication Correspondence · PDF11 Sept 2017View
17-39697 2A Natural Spot Checks B 11 C11.pdfApplication Correspondence · PDF11 Sept 2017View
17-42746-1 MGC7-1.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_32136.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_25720.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_28163.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_24826.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_32469.pdfApplication Correspondence · PDF11 Sept 2017View
17-38920-1 Manchester Imported Sub 1-2.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_21465.pdfApplication Correspondence · PDF11 Sept 2017View
16-27593 1 Natural Spot Checks F7 5.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_23956.pdfApplication Correspondence · PDF11 Sept 2017View
17-42747-1 D10 E11.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_26382.pdfApplication Correspondence · PDF11 Sept 2017View
16-27175-1 CC3 19-20 Leachate.pdfApplication Correspondence · PDF11 Sept 2017View
10147 019 Box Cut Locations-Full.pdfPlans · PDF11 Sept 2017View
lucion_air_cert_29309.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_31085.pdfApplication Correspondence · PDF11 Sept 2017View
10218- Exploratory Hole Logs.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_22482.pdfApplication Correspondence · PDF11 Sept 2017View
16-24626-1 OS2 1.pdfApplication Correspondence · PDF11 Sept 2017View
16-31905-1 Hotspot 2-4 Arising's.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_27375.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_31076.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_22879.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_31360.pdfApplication Correspondence · PDF11 Sept 2017View
16-28248-1 Natural Spot Checks B4 C 4.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_28474.pdfApplication Correspondence · PDF11 Sept 2017View
16-25880-1 MGG1 i2.pdfApplication Correspondence · PDF11 Sept 2017View
16-26936-1 Site won subsoil 21-30.pdfApplication Correspondence · PDF11 Sept 2017View
16-27742-1 Tank Test Day 1.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_25194.pdfApplication Correspondence · PDF11 Sept 2017View
10-218-008 - Depth of Made Ground Plan.pdfPlans · PDF11 Sept 2017View
lucion_air_cert_32142.pdfApplication Correspondence · PDF11 Sept 2017View
16-30175 1 Natural Spot Checks B E D.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_23493.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_21858.pdfApplication Correspondence · PDF11 Sept 2017View
17-43879-1 Site Won Subsoil 75-78.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_29742.pdfApplication Correspondence · PDF11 Sept 2017View
16-24358-1 MGG1 MG1-10.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_29745.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_26614.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_26859.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_25437.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_27680.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_21936.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_31103.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_24418.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_28164.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_31133.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_24894.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_32467.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_25576.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_31074.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_23221.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_26185.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_28929.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_21278.pdfApplication Correspondence · PDF11 Sept 2017View
16-30251-1 Site won subsoil 61-65.pdfApplication Correspondence · PDF11 Sept 2017View
17-40551-1 Tank Test Day 2.pdfApplication Correspondence · PDF11 Sept 2017View
16-29078-1 Pits 1 7 11.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_22480.pdfApplication Correspondence · PDF11 Sept 2017View
16-27451 LT1667 FinalLabRprt 2016-09-27 USC TEST.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_24809.pdfApplication Correspondence · PDF11 Sept 2017View
16-33016-1 MGC 5 2.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_26955.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_23675.pdfApplication Correspondence · PDF11 Sept 2017View
16-31475-1 Natural Spot Checks B 8.pdfApplication Correspondence · PDF11 Sept 2017View
16-27961-1 MGC4 1-4 chemical.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_31077.pdfApplication Correspondence · PDF11 Sept 2017View
10-218-015 - Section Location Plan & Cross Sections.pdfPlans · PDF11 Sept 2017View
16-28245-1 Site won sandstone 21- 30.pdfApplication Correspondence · PDF11 Sept 2017View
17-40618-1 Natural Spot Checks E 8 E 9.pdfApplication Correspondence · PDF11 Sept 2017View
10147-013 - Stockpile Tracking Drawing.pdfPlans · PDF11 Sept 2017View
16-27596-1 Hotspot 2.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_31130.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_29307.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_25856.pdfApplication Correspondence · PDF11 Sept 2017View
17-40869-1 Supplementary Trial Pitting.pdfApplication Correspondence · PDF11 Sept 2017View
16-32501-1 Hotspot 4 Validation.pdfApplication Correspondence · PDF11 Sept 2017View
17-37503-1 Site Won Sandsrone 76-80.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_28492.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_25959.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_31105.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_26857.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_29310.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_31086.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_25907.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_25193.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_27377.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_22880.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_28472.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_31518.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_21490.pdfApplication Correspondence · PDF11 Sept 2017View
17-43880-1 Hotspot 6.pdfApplication Correspondence · PDF11 Sept 2017View
16-28248 1 Natural Spot Checks B4 C 4.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_24075.pdfApplication Correspondence · PDF11 Sept 2017View
10147 019 Box Cut Locations-Sheet 2.pdfPlans · PDF11 Sept 2017View
16-33430-1 CC6-1.pdfApplication Correspondence · PDF11 Sept 2017View
17-43190-1 Natural Spot Checks B D E14.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_28817.pdfApplication Correspondence · PDF11 Sept 2017View
10-218-009 - Depth of Bedrock Plan.pdfPlans · PDF11 Sept 2017View
lucion_air_cert_32143.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_24419.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_27922.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_21937.pdfApplication Correspondence · PDF11 Sept 2017View
17-41282-1 Natural Spot Check E D.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_29743.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_25990.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_23673.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_22882.pdfApplication Correspondence · PDF11 Sept 2017View
16-26492-1 Field Trial 1 UCS 8.99 MPa.pdfApplication Correspondence · PDF11 Sept 2017View
16-26367-1 MGC 13-33.pdfApplication Correspondence · PDF11 Sept 2017View
16-26941-1 Site won subsoil 31-40.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_25271.pdfApplication Correspondence · PDF11 Sept 2017View
16-27744-1 Tank Test Day 2.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_21859.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_24371.pdfApplication Correspondence · PDF11 Sept 2017View
17-44544-1 CC7-6F2.pdfApplication Correspondence · PDF11 Sept 2017View
10147-010 - Remediation Works Plan Phase 4.pdfPlans · PDF11 Sept 2017View
10147-014 - Natural Strata Survey -Full Site.pdfPlans · PDF11 Sept 2017View
lucion_air_cert_31131.pdfApplication Correspondence · PDF11 Sept 2017View
16-28129-1 B3 hotspot.pdfApplication Correspondence · PDF11 Sept 2017View
10-218-004 - Exploratory Hole Location Plan.pdfPlans · PDF11 Sept 2017View
lucion_air_cert_27010.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_29746.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_23939.pdfApplication Correspondence · PDF11 Sept 2017View
17-38918-1 Imported Univar 1-4.pdfApplication Correspondence · PDF11 Sept 2017View
17-40547-1 Tank Test Day 0.25.pdfApplication Correspondence · PDF11 Sept 2017View
10-218-016 - Build Phase Conceptual Site Model.pdfPlans · PDF11 Sept 2017View
16-29056-1 Site won sandstone 31-40.pdfApplication Correspondence · PDF11 Sept 2017View
16-30745-1 Site won subsoil 66-70.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_28165.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_24895.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_29308.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_32468.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_25857.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_27303.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_31075.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_23955.pdfApplication Correspondence · PDF11 Sept 2017View
17-40554-1 Tank Test Day 9.pdfApplication Correspondence · PDF11 Sept 2017View
17-42066-1 C 14-15.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_26381.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_21368.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_28974.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_28162.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_22481.pdfApplication Correspondence · PDF11 Sept 2017View
17-48489-1 A13 B12 D12 E12 E14.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_24810.pdfApplication Correspondence · PDF11 Sept 2017View
16-33018-1 MGC 6 2.pdfApplication Correspondence · PDF11 Sept 2017View
16-31477-1 Hotspot 4 Arisings.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_31084.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_26553.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_32138.pdfApplication Correspondence · PDF11 Sept 2017View
16-32300 1 Natural Spot Checks B C.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_24318.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_25272.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_27676.pdfApplication Correspondence · PDF11 Sept 2017View
17-43184-2 CC7-Mot.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_21738.pdfApplication Correspondence · PDF11 Sept 2017View
10147-010 - Remediation Works Plan Phase 2.pdfPlans · PDF11 Sept 2017View
lucion_air_cert_25161.pdfApplication Correspondence · PDF11 Sept 2017View
17-39464-1 Tanhouse imported 1-4.pdfApplication Correspondence · PDF11 Sept 2017View
16-26589-1 Natural Spot Checks.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_25908.pdfApplication Correspondence · PDF11 Sept 2017View
16-27169 1 Natural Spot Checks F5 5 F6 5.pdfApplication Correspondence · PDF11 Sept 2017View
16-24625-1 Hotspot 1 Validation and MGC impacted 1 2.pdfApplication Correspondence · PDF11 Sept 2017View
17-38923-1 Hydrocarbons for disposal 10-02-17.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_22648.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_28566.pdfApplication Correspondence · PDF11 Sept 2017View
10-218-002 - Former Site Layout.pdfPlans · PDF11 Sept 2017View
lucion_air_cert_21574.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_29481.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_24521.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_23496.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_22132.pdfApplication Correspondence · PDF11 Sept 2017View
10147-015 - As-Built Survey -Sheet 1.pdfPlans · PDF11 Sept 2017View
16-26041 - CC3 PSD.pdfApplication Correspondence · PDF11 Sept 2017View
16-25558-2 MGG4 - 2.pdfApplication Correspondence · PDF11 Sept 2017View
16-27166-1 Site won subsoil 41-50.pdfApplication Correspondence · PDF11 Sept 2017View
10-218-010 - Asbestos Impacted Materials Plan.pdfPlans · PDF11 Sept 2017View
lucion_air_cert_30187.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_25578.pdfApplication Correspondence · PDF11 Sept 2017View
10-218-014 - Curing Tank Plan.pdfPlans · PDF11 Sept 2017View
lucion_air_cert_27927.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_29024.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_32147.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_24808.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_22134.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_23940.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_28773.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_29747.pdfApplication Correspondence · PDF11 Sept 2017View
16-27750-1 Tank Test Day 36.pdfApplication Correspondence · PDF11 Sept 2017View
16-33014-1 Natural Spot Check A2-A7.pdfApplication Correspondence · PDF11 Sept 2017View
16-28244-1 Site won sandstone 11 -20.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_27451.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_31081.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_24114.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_21723.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_26461.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_29306.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_31135.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_25031.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_27195.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_28201.pdfApplication Correspondence · PDF11 Sept 2017View
16-33022-1 Hotspot 5 Validation.pdfApplication Correspondence · PDF11 Sept 2017View
16-26589 1 Natural Spot Checks.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_23942.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_22492.pdfApplication Correspondence · PDF11 Sept 2017View
16-25670-1 OS3.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_21274.pdfApplication Correspondence · PDF11 Sept 2017View
17-40556-1 Tank Test Day 16.pdfApplication Correspondence · PDF11 Sept 2017View
17-44538-1 B E.pdfApplication Correspondence · PDF11 Sept 2017View
16-30746-2A Site won sandstone 52-60.pdfApplication Correspondence · PDF11 Sept 2017View
16-31270-1 Hotspot 2 North re-test.pdfApplication Correspondence · PDF11 Sept 2017View
17-39404-1 Pits 31 32.pdfApplication Correspondence · PDF11 Sept 2017View
17-37008-2 Site Won Subsoil 71-74.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_32510.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_25192.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_28471.pdfApplication Correspondence · PDF11 Sept 2017View
17-37998 CC4 VSC - PSD.pdfApplication Correspondence · PDF11 Sept 2017View
17-37011-1 CC6-3.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_28774.pdfApplication Correspondence · PDF11 Sept 2017View
10147-009 - Civils Void Locations.pdfPlans · PDF11 Sept 2017View
17-44541-1 CC7-Mot 1-1.pdfApplication Correspondence · PDF11 Sept 2017View
10-218-011 - Remediation Issues Plan.pdfPlans · PDF11 Sept 2017View
10147-010 - Remediation Works Plan Phase 3.pdfPlans · PDF11 Sept 2017View
lucion_air_cert_31106.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_23497.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_26862.pdfApplication Correspondence · PDF11 Sept 2017View
16-24872-1 MGC 3-12.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_28771.pdfApplication Correspondence · PDF11 Sept 2017View
17-40587-1 PCB's.pdfApplication Correspondence · PDF11 Sept 2017View
10-218-003 - Historical Features Plan.pdfPlans · PDF11 Sept 2017View
16-27746-1 Tank Test Day 9.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_22954.pdfApplication Correspondence · PDF11 Sept 2017View
16-33014 1 Natural Spot Check A2 A7.pdfApplication Correspondence · PDF11 Sept 2017View
16-27185-2A Site won subsoil 51-60.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_32139.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_25310.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_24319.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_27677.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_29482.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_23494.pdfApplication Correspondence · PDF11 Sept 2017View
16-26030 - CC1 PSD.pdfApplication Correspondence · PDF11 Sept 2017View
17-43883-1 Cemex import 1-3.pdfApplication Correspondence · PDF11 Sept 2017View
10147-015 - As-Built Survey -Sheet 2.pdfPlans · PDF11 Sept 2017View
lucion_air_cert_26144.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_23941.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_27087.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_23020.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_30185.pdfApplication Correspondence · PDF11 Sept 2017View
16-25002-1 CC1 1-4.pdfApplication Correspondence · PDF11 Sept 2017View
16-25701-1 OS2 2.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_32145.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_23943.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_27925.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_24574.pdfApplication Correspondence · PDF11 Sept 2017View
16-28856-1 Hotspot 2 Validation.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_22133.pdfApplication Correspondence · PDF11 Sept 2017View
17-42747-1 D10 E11.pdfApplication Correspondence · PDF11 Sept 2017View
17-45499-1 B 9 A 11 retests.pdfApplication Correspondence · PDF11 Sept 2017View
16-31473-1 Hotspot 3 Validation and arisings.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_31136.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_27302.pdfApplication Correspondence · PDF11 Sept 2017View
16-27751-1 Tank Test Day 64.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_28161.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_29110.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_32148.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_23301.pdfApplication Correspondence · PDF11 Sept 2017View
17-48489-1 A13 B12 D12 E 12 E14.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_29483.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_32532.pdfApplication Correspondence · PDF11 Sept 2017View
16-26943 1 Natural Spot Checks F4 5 A1 5.pdfApplication Correspondence · PDF11 Sept 2017View
16-34711-1 hydrocarbons 1-2-3-4-5.pdfApplication Correspondence · PDF11 Sept 2017View
16-24587-1 MGG2 MG01-10.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_22493.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_31082.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_26552.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_24228.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_32137.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_27452.pdfApplication Correspondence · PDF11 Sept 2017View
16-31283-1 Site won sandstone 61-70.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_25032.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_32470.pdfApplication Correspondence · PDF11 Sept 2017View
17-38923-1 Manchester imported 3-4.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_28259.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_25951.pdfApplication Correspondence · PDF11 Sept 2017View
17-54107-1 Cemex Import QTS 1-7.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_26383.pdfApplication Correspondence · PDF11 Sept 2017View
17-40559-1 Tank Test Day 64.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_23222.pdfApplication Correspondence · PDF11 Sept 2017View
17-37856-1 CC4 1-10.pdfApplication Correspondence · PDF11 Sept 2017View
16-31475 1 Natural Spot Checks B 8.pdfApplication Correspondence · PDF11 Sept 2017View
10147-010 - Remediation Works Plan Phase 1.pdfPlans · PDF11 Sept 2017View
lucion_air_cert_26860.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_23495.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_31104.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_24693.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_31128.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_26863.pdfApplication Correspondence · PDF11 Sept 2017View
16-27748-1 Tank Test Day 16.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_23019.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_25436.pdfApplication Correspondence · PDF11 Sept 2017View
17-37855 1 Natural Spot Checks D8 E9.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_27678.pdfApplication Correspondence · PDF11 Sept 2017View
16-27958-1 Site won sandstone 1-10.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_32146.pdfApplication Correspondence · PDF11 Sept 2017View
10-218-012 - Remediation Conceptual Model.pdfPlans · PDF11 Sept 2017View
lucion_air_cert_27926.pdfApplication Correspondence · PDF11 Sept 2017View
16-26036 - CC2 PSD.pdfApplication Correspondence · PDF11 Sept 2017View
16-25295-1 MGG3-CC-Mot.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_26040.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_28772.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_32140.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_22483.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_23219.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_30186.pdfApplication Correspondence · PDF11 Sept 2017View
16-25295-1 CC2 1-4 - Mot 3-6 -TMC1 1-4.pdfApplication Correspondence · PDF11 Sept 2017View
16-26051 1 Naturals Spot Checks B C E F.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_26145.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_31078.pdfApplication Correspondence · PDF11 Sept 2017View
17-40619-0 MGC3-s1-s2.pdfApplication Correspondence · PDF11 Sept 2017View
17-43190-1 Natural Spot Checks B D E14.pdfApplication Correspondence · PDF11 Sept 2017View
16-30255-1 Hotspot 2 Arising's.pdfApplication Correspondence · PDF11 Sept 2017View
16-31908-1 Pits 12-27.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_31134.pdfApplication Correspondence · PDF11 Sept 2017View
10147-020 - CBR Locations and Values.pdfPlans · PDF11 Sept 2017View
lucion_air_cert_27194.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_28470.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_31137.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_25577.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_23260.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_25618.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_26460.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_29132.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_32149.pdfApplication Correspondence · PDF11 Sept 2017View
lucion_air_cert_32471.pdfApplication Correspondence · PDF11 Sept 2017View
17-37007-1 Site Won Sandstone 71-75.pdfApplication Correspondence · PDF11 Sept 2017View
ApplicationFormNoPersonalData.pdfApplication Form · PDF5 Jul 2017View
1700324COND.pdfWeb · PDF1 Jan 1901View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Decision Made Date

    Published milestoneCouncil source

Decision & conditions

Other
1700324COND_06102017_144002.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.